Log in
Forum
Loading...
Topic

SCAQMD 1168 and CDPH v1.1

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Samantha Lee on Nov 26, 2019, 4:23 pm

If a product meets the...

Last reply: Susan Di Giulio, Nov 26, 2019, 7:35 pm

LEED O+M for Commercial Interiors

LEED Rating System Selection
posted by Geraldine Seguela RAIA on Aug 7, 2019, 11:22 pm

on using whole building energy/water and only tenant space IAQ, etc.? Happy to shift to another question/forum as well. Thanks! Log in or register to post comments Tristan Roberts Technical Director...

Last reply: Tristan Roberts, Nov 26, 2019, 3:14 pm

Available regional credits for Buenos Aires?

NC-2009 RPc1: Regional Priority
posted by Victoria Rios Esteve on Nov 21, 2019, 9:30 am

Hi everyone, 

I was wondering if anyone has idea which regional credits are available for Buenos Aires, Argentina right now. 

Thank you for your answer!

Last reply: Tristan Roberts, Nov 26, 2019, 1:19 pm

LEED guidlines for contractors

NC-v4 MRc4: Building product disclosure and optimization - material ingredients
posted by Jade Jenkins on Nov 20, 2019, 2:40 pm

Hello everyone, I am a project manager and we are going out with an ITT soon. The building is aiming for a LEED silver rating and we would like to inform the contractors that they should keep...

Last reply: Jade Jenkins, Nov 26, 2019, 1:10 pm

IAQ Management Program- Sample?

EBOM-v4 EQc1: Indoor air quality management program
posted by Josue Diaz on Nov 25, 2019, 8:28 pm

LEED reference guide states that an "...

four buildings with a public square

ND-Plan-v4 NPDp1: Walkable Streets
posted by Sareet Benayahu on Oct 10, 2018, 7:11 am

Hi,

Our LEED ND-Plan Project has a few Large Lots, on which there are three or four buildings planned at the edges of the lots and in the center a large public square. There are wide...

Last reply: David Posada, Nov 25, 2019, 8:22 pm

Include Fixtures for Mother's Room?

NC-v4 WEp2: Indoor water use reduction
posted by RDK E&S on Nov 25, 2019, 5:18 pm

Hello, 

My hunch is that faucets included in the mother's room do not needed to be included in the Minimum Indoor Water Use Reduction calculator, although I'm looking for confirmation. ...

Last reply: Emily Purcell, Nov 25, 2019, 6:57 pm

Use (Grouped) modeled zones for Min IAQ

NC-v4 EQp1: Minimum indoor air quality performance
posted by RDK E&S on Nov 25, 2019, 2:20 pm

Hello, 

I am working on a residential project under NC-v4. The project is a residential hall with 1bd, 2bd, 3bd, and some 4bd suites. The project utilizes natural ventilation during the...

Tier 3: off-site renewable energy credit in Optimize Energy Performance

LEED v4.1 Discussion Forum
posted by Ruju Rathod on Nov 25, 2019, 1:54 pm

Hi all,

Can someone direct me to the...

Modelling Hospital Addition

LEED v4.1 Discussion Forum
posted by Eddie Roach on Nov 25, 2019, 12:48 pm

Hello all,

I am currently working to create an energy model for an addition to be made to a hospital and am unsure how to go about modelling the heating system. New air handling...