Meeting the credit intent

Pilot-Credits IPpc90: Social equity within the operations and maintenance staff
posted by Jon Hall on Apr 29, 2016, 11:41 am

The credit intent states the following:

Encourage any and all members of the project team to promote and further social equity by integrating strategies that address identified social and...

Last reply: Richard Manning, Dec 6, 2023, 5:52 pm

beyond the 25 feet boundary and neighboring business

CI-v4 EQp2: Environmental tobacco smoke control
posted by Edgar Arevalo on Dec 6, 2023, 4:10 pm

There is a library project I'm working on which has a policy of no smoking within 100 feet from the entrance.  The thing is it is next to neighboring business that are are within the 100 feet and...

Retail FTE Access

CS-v4 LTc6: Bicycle facilities
posted by Michelle Rosenberger on Dec 5, 2023, 11:34 am

This core and shell office building has retail on the ground level. There are locker rooms and bike storage on this level but no direct interior access from the retail spaces to these facilities...

Last reply: Dave Hubka, Dec 6, 2023, 3:57 pm

Existing Parking Lot

NC-v4.1 MPR2: Must use reasonable LEED boundaries
posted by Laura Soma on Dec 5, 2023, 12:55 pm

If building next to an existing parking lot, which will serve the new...

Last reply: Dave Hubka, Dec 6, 2023, 3:43 pm

Project phases vs LEED certification approach?

LEED Guidance for Campuses and Multiple Buildings
posted by Ehsan Baharvand on Jul 10, 2016, 3:27 am

Dear all,

I'm wondering what certification approach I can propose for a poduction site consisting of 3 construction phases (like building extensions over different period of time):
...

Last reply: Dave Hubka, Dec 6, 2023, 3:31 pm

Cumulative Points

Pilot-Credits WEpc115: Whole Project Water Use Reduction
posted by Catarina Costa Goncalves on Dec 6, 2023, 9:41 am

Can we still target this credit even if  we do not get full points under indoor water use reduction credit? 

For our project no irrigation is required, and with currently approx 43% indoor...

Last reply: Dave Hubka, Dec 6, 2023, 3:15 pm

Any manufacturers that specifically address this credit?

Pilot-Credits MRpc103: Integrative Analysis of Building Materials
posted by Talia Fishman on Mar 28, 2023, 2:21 pm

I know that Sherman Williams provides a list of products that can be used for this credit. I am wondering if anyone has found other manufacturers that provide detailed information about there...

Last reply: Marina Rullo, Dec 6, 2023, 9:06 am

Energy Metering Displays

NC-v4 EAc3: Advanced Energy Metering
posted by Allison Para on Dec 5, 2023, 12:33 pm

Hello Pros,

I am working on a student residential building (NC) that will have advanced submetering for the 5 floors.

The accountable submetering consumption is for each floor, not...

Last reply: Allison Para, Dec 5, 2023, 3:07 pm

No Brainer for projects with community programs

Pilot-Credits IPpc89: Social equity within the community
posted by Abby McDonald on May 19, 2022, 1:12 pm

The ownership of our project had several community programs, benifitting vulnerable populations near the project site.  The Option 2 documentation template made it easy to provide the information...

Last reply: Michelle Rosenberger, Dec 5, 2023, 12:46 pm

v4.1 EPD Option 2 (optimization)- no viable way to mandate this in construction specs!

NC-v4.1 MRc2: Environmental Product Declarations
posted by Joanna Switzer on Apr 17, 2020, 2:38 pm

"only to 1,000ppm".  Facepalm moment TGIF! Log in or register to post comments Aaron Owens Sustainability Specialist Allegion LEEDuser Basic Member 3 thumbs up July 17, 2023- 3:43 pm On this forum...

Last reply: Julie Baines, Dec 4, 2023, 7:47 pm