Topic | Recent |
---|---|
Downstream Implementation of Analysis OutcomesPilot-Credits INpc113: Informing Design Using Triple Bottom Line Analysisposted by Charles Boechler on Aug 16, 2023, 3:34 pm
This is such a critical part of informing plan decisions in relation to the marketplace value or buyer acceptance. I am curious how value engineering exercise at the construction stage has... Last reply: Candice Rogers, May 21, 2025, 3:07 pm |
|
Exam RescheduleLEED Exam Discussionposted by Marine Petrosyan on May 19, 2025, 1:45 pm
Hi, All! Due to some unexpected circumstances I have to reschedule my exam (at the nearby exam center). According to the rules, I still have time to reschedule without reschedule fee, but... |
|
Monitoring- Mechanically ventilated spacesNC-v4 EQp1: Minimum indoor air quality performanceposted by Anna Bortkiewicz on Nov 3, 2022, 6:50 am
Hello, I have a system in a hotel that has a constant air volume system of crca 550 l/s and I am not sure how to correspond to the requierement of LEED:
Last reply: Iqbal Khalilullah, May 19, 2025, 8:02 am |
|
Documentation for Inherently non-emitting materialsNC-v4 EQc2: Low-emitting materialsposted by Edgar Arevalo on Sep 29, 2023, 11:46 am
We have an insulation material that can comply either as inherently non-emitting or meets general emissions evaluation, and has been checked as inherently non-emitting by the contractor, but no... Last reply: Anna Okviana, May 17, 2025, 12:48 am |
|
Clarification on Baseline System Type and Exceptional Calculation for Phased Data Center ProjectNC-v4 EAp2: Minimum Energy Performanceposted by Anurag Ghosh on Apr 11, 2025, 1:23 am
Dear Forum Members, We are currently working on a multi-phase data center project pursuing LEED v4 BD+C: New Construction certification as a ... Last reply: Marcus Sheffer, May 16, 2025, 10:33 am |
|
District Cooling Plant- Chilled Water MeteringNC-v4 EAc3: Advanced Energy Meteringposted by Junaid Mujahid on Mar 21, 2025, 4:24 am
Hi Everyone, For a project connected with DCP, is it sufficient to meter the chilled water coming into the project using a single BTU meter for the 'Space Cooling' end use? What if the... Last reply: Marcus Sheffer, May 16, 2025, 10:30 am |
|
LEED v4 EBOM Campus/Group Benchmarking for 3 buildings sharing 1 meter and energy source for Semiconductor ManufacturingLEED Guidance for Campuses and Multiple Buildingsposted by Summer Gorder on May 15, 2025, 7:26 pm
We are working with a semiconductor manufacturing facility that would like to achieve LEED... |
|
LEED v4 EBOM Campus/Group 3 buildings sharing 1 meter and energy source for Semiconductor ManufacturingLEED Guidance for Campuses and Multiple Buildingsposted by Summer Gorder on May 15, 2025, 7:23 pm
We are working with a semiconductor manufacturing facility that would like to achieve LEED... |
|
Tier 2-Renewable electricity and EACsNC-v4.1 EAc5: Renewable energyposted by Hashir Usman on Apr 6, 2022, 3:23 am
Hi everyone, I'd like to ask if... Last reply: Marcus Sheffer, May 14, 2025, 4:07 pm |
|
Determining area of tree canopy shading for calculationsNC-v4 SSc5: Heat Island Reductionposted by Erica Downs on May 13, 2025, 10:05 am
When determining the "Area shaded by plant canopy", do you count the entire tree canopy area, or only the area of hardscape that overlaps with the 10-yr tree canopy? I've received conflicting... Last reply: Erica Downs, May 14, 2025, 10:58 am |