Cluster of small building connected by an exterior porchLEED Guidance for Campuses and Multiple Buildingsposted by Summer Gorder on Nov 20, 2024, 11:56 pm
The project is a small artist sanctuary. The New Construction development contains multiple interconnected single-story buildings situated across the site connected by an exterior porch. Programs... Last reply: Susan Di Giulio, Nov 21, 2024, 1:04 am |
|
Demonstrating Green-e Equivalency for Green Power PurchasedCS-v4 EAc7: Green power and carbon offsetsposted by Yoyo Shek on Nov 20, 2024, 9:23 pm
Hi everyone, We are working on a LEED BD+C Core and Shell project in Hong Kong and are planning to purchase International Renewable Energy Certificates (I-RECs) from ECOHZ to meet the... |
|
"Everything within the waterproofing membrane"NC-v4.1 EQc2: Low-emitting materialsposted by James Keohane on Jun 24, 2020, 12:14 pm
The credit language states that materials which must meet the requirements are "everything within the waterproofing membrane." The waterproofing membrane itself ( e.g.... Last reply: Allen Cornett, Nov 20, 2024, 2:38 pm |
|
Reduced parking footprint attempted for CampusNC-v4 LTc7: Reduced parking footprintposted by Pham Kim Ngan on Nov 20, 2024, 4:28 am
Hi everyone, We have decided to classify our project as a campus project. The new building is part of Phase 2 of our development and will be constructed on land that has already been... |
|
Daylight CalculatorNC-v4.1 EQc7: Daylightposted by Junaid Mujahid on Nov 20, 2024, 3:21 am
The LEED v4.1 requires area input for which the lux levels are within the range for 9am AND 3pm. From my understanding of the credit language, it is required to average the 9am values for... Last reply: Collin Robinson, Nov 20, 2024, 10:03 am |
|
Pilot Credit: Procurement of Low Carbon MaterialsCS-v4 INc1: Innovationposted by Michelle Bombeck on Jul 22, 2021, 4:26 pm
Hi all - Just sharing our experience so far with this pilot credit, as required... We're pursuing this credit on a large speculative CS office project in WA. Although the construction team has... Last reply: Ryann Malicdem, Nov 19, 2024, 1:37 pm |
|
LEED v4.1 Service water-heating system with DES purchased heatNC-v4.1 EAp2: Minimum Energy Performanceposted by Manuel Romera Molina on Nov 19, 2024, 5:23 am
Hello everybody, Regarding the Baseline Service Water-Heating System, both Table G3.1.1-2 in Standard 90.1 - 2016, as well as the statements in Table 3 "Changes in ASHRAE 90.1 Performance... |
|
Carshare vehicle parking space- Successful implementation?NC-v4.1 LTc7: Reduced parking footprintposted by Grace Friedhoff on Dec 29, 2021, 10:12 am
Has anyone successfully implemented Option 2. Carshare in the Reduced Parking Footprint credit? I am having a lot of difficulty finding information on how a project would get one of these... Last reply: HoMU WELLTECH, Nov 19, 2024, 7:26 am |
|
Baseline Exhaust Energy Heat RecoveryCI-v4 EAc2: Optimize Energy Performanceposted by Ciaran McCabe on Sep 5, 2019, 12:30 pm
In ASHRAE 90.1 Table 6.5.6.1 - Exhaust Energy Recovery Requirement where they mention % Outdoor Air at Full Design Airflow Rate are they referring to the "minimum outdoor air" value ? The outdoor... Last reply: Alvaro Twose, Nov 19, 2024, 5:16 am |
|
By considering the IAQ calculator-Fresh air calculationCI-v4 EQp1: Minimum indoor air quality performanceposted by Nagaraj Sankar on Nov 19, 2024, 4:17 am
Dear Kudos, We have been consistently receiving comments across multiple project reviews regarding worst-case considerations. I have shared my assumptions on this topic, but I'd... |