LEED ND v4 MPR2 project area

ND-v4 MPR2: Must use reasonable LEED boundaries
posted by wenting ding on Feb 18, 2018, 11:13 pm

Hi,

In the MPR of LEED ND, it is written'Projects may have enclaves of non-project properties that are not subject to the rating system, but cannot exceed 2% of the total project area and...

Last reply: Eliot Allen, Feb 20, 2018, 12:32 pm

tenants meters data collection requirement

CS-v4 EAc3: Advanced Energy Metering
posted by Pedro Ribeiro on Dec 21, 2017, 10:52 am

A large office building is being certified using LEED Core & Shell.

All tenant spaces (3 - 5 per floor) will be endowed with energy meters (power meters only because tenant...

Last reply: Marcus Sheffer, Feb 20, 2018, 11:30 am

LEED Documents Translation

NC-v4 LTc3: High priority site
posted by Ahmed Abunada on Feb 19, 2018, 7:11 am

Hello,

As you may know, some documents are needed in order to demonstrate compliance with LEED credits. Since I have non English documents, shall I translate them into English? If so,...

Last reply: Trista Little, Feb 20, 2018, 11:14 am

Schedule for Lighting, Occupancy, & Plug Loads

NC-v4 EAp2: Minimum Energy Performance
posted by junaid naseer on Feb 20, 2018, 12:36 am

We are working on a Hospital Project outside USA and we are going though option 1 i.e. whole building energy simulation.

We do not have operational hours for the project except that it is...

Last reply: Marcus Sheffer, Feb 20, 2018, 10:56 am

Building Envelope Commissioning

NC-v4 EAc1: Enhanced Commissioning
posted by Chris Bennett on Feb 16, 2018, 5:29 pm

Hello All, 

Has anyone gone through the process of building envelope...

Open-Loop Heat Pump System/Process Water Use

NC-v4 WEp2: Indoor water use reduction
posted by Kara Rousselle on Feb 16, 2018, 6:00 pm

Can an open-loop ground source supply/injection well heat pump system be used for the heating and cooling system on a LEED v4 project?  Does the WE Prerequisite: Indoor Water Use Reduction Table...

Garden and Recreation space

NC-v4 SSc3: Open space
posted by Jonelle Humphrey on Feb 17, 2018, 6:47 pm

If I were designing a two-way running path, with each direction of travel to be separated by a (narrow) raised garden bed along the edge of my site, would this area count towards "garden space...

LEED ND v4 MPR2 project area

ND-v4 MPR2: Must use reasonable LEED boundaries
posted by wenting ding on Feb 18, 2018, 8:04 pm

We are considering applying for a LEED ND cergification. In the minimum program requirements, it is writter'projects may have enclaves of non-project properties that are not subject to the rating...

Automatic Receptacle Control

CI-v4 EAp2: Minimum Energy Performance
posted by Erik Camacho on May 20, 2014, 11:32 am

EAp2 has an mandatory ASHRAE requirement (90.1-2010, Section 8.4.2 Automatic Receptacle Control) requiring at least half of all private offices, open offices, and computer classrooms to be...

Last reply: Diana Nezamutinova, Feb 20, 2018, 6:24 am

Tenant Agreement

CS-v4 SSc7: Tenant Design and Construction Guidelines
posted by Robyn Dowsey on May 18, 2015, 4:33 pm

Has anyone ever used the Tenant agreement credit/Core And Shell as a BD&C ID credit -Do you have a good template for sample agreements that have worked in the past.

Last reply: Jean DesRosiers, Feb 19, 2018, 4:34 pm