Indoor Water Use Calculator malfunction

NC-v4 WEp2: Indoor water use reduction
posted by Susan Di Giulio on Jan 25, 2022, 3:03 pm

Dear LEED friends,

It seems there is a glitch with the Calculator and Excel.  Has anyone had the error on the Summary page show up, "Run time error '1004'?

We cannot get the Summary...

Last reply: Maria Porter, Jan 26, 2022, 3:24 am

Pilot Credit INpc155

NC-v4 EQp1: Minimum indoor air quality performance
posted by Vassil Vassilev on Jan 26, 2022, 2:27 am

Greetings,

In an attempt of following this Pilot credit, the following question (related to #1b. of the Requirements) appeared:

In case our project has no recirqulation, meaning it...

Sport and leisure facilities

LEED Rating System Selection
posted by Axel Verger on Jan 19, 2022, 6:08 am

Hi,

Does anyone knows how sport and leisure facilities (climbing, trampoline...) ca be rated? Can I use the Shell and Core rting system? Is ther a bespoke rating system?

Thank you...

Last reply: Axel Verger, Jan 26, 2022, 2:03 am

Bird collision deterrence- corrective actions

Pilot-Credits SSpc55: Bird collision deterrence
posted by Zuzanna Targosz on Jan 25, 2022, 10:00 am

What corrective actions could be implemented in case of noticing birds collisions in spite of low BCTR value? 

Last reply: Kath Williams, Jan 25, 2022, 5:43 pm

Restore Habitat Using Turf

NC-v4.1 SSc2: Protect or Restore Habitat
posted by Kristina Kouyoumdjian on Jan 25, 2022, 5:37 pm

Hello,

The 'Vegetation' component for this credit is to plant a minimum of 6 species that are native or adapted. If the 7th species is not native or adaptive (turf), can it still...

Interior Lighting Control

NC-v4.1 EQc6: Interior lighting
posted by Jennifer Atherton on May 19, 2021, 11:57 am

What is the definition of "occupant spaces" ? 

Last reply: Brad Newkirk, Jan 25, 2022, 3:47 pm

CO2 monitoring for Core and Shell projects

CS-v4 EQc1: Enhanced indoor air quality strategies
posted by Irene Chung on Apr 9, 2017, 5:56 pm

Hi,

Is a copy of the lease agreement stating that tenants must install co2 sensors in all densely occupied spaces required for v4 Core and Shell projects?

If not, can the project...

Last reply: Teresa Tousignant, Jan 25, 2022, 2:05 pm

What's considered substantial completion if building is completed before the site?

NC-v4 SSp1: Construction Activity Pollution Prevention
posted by Adam Huckstep on Jan 25, 2022, 10:37 am

Hi All, I have a question on how to handle a project where construction will continue after the projects building is complete and ready for occupancy.

Background: The project includes a...

Construction of site continuing after building completed

NC-v4 MRp2: Construction and demolition waste management planning
posted by Adam Huckstep on Jan 25, 2022, 10:36 am

Hi All, I have a question on how to handle a project where construction will continue after the projects building is complete and ready for occupancy.

Background: The project includes a...

What exactly Accessible Flooring means herewith in this credit language?

CI-v4.1 MRc2: Interiors life-cycle impact reduction
posted by Jeevan Doifode on Jan 25, 2022, 4:49 am

For general office building which typically has flooring system with ceramic tiles and floorboxes for Data/voice.What exactly Accessible Flooring means herewith in this credit language?