Log in
Forum
Topic

Legal Wood Pilot Credit and MR BPDO Sourcing of Raw Materials / Alternate Compliance Path

CI-v4.1 IN101: Innovation
posted by John Masters on Oct 19, 2021, 5:38 pm

Need some direction regarding the Legal Wood Pilot Credit & ACP - MR BPDO Sourcing Raw Materials

o What backup documentation do I need to confirm that the product is from a“legal (non-...

Last reply: Jonathan Waltr, Sep 28, 2023, 1:06 pm

When Did the v4 Water Metering Credit Change?

NC-v4 WEc4: Water metering
posted by Kyle G. Pearson on Sep 22, 2023, 12:42 pm

On our last two projects we've gotten a comment indicating that we need to remove the usage of "electric water coolers, janitors sinks, swimming pool, laundry, commercial kitchen, salon sink...

Last reply: Glen Boldt, Sep 28, 2023, 12:28 pm

Systems Unable to Meet Required Outdoor Airflow Rates

EBOM-v4.1 EQp1: Minimum Indoor Air Quality
posted by Dang Thi on May 20, 2020, 12:23 am

I have a question,  compare to LEED v4...

Last reply: Gustavo De las Heras Izquierdo, Sep 28, 2023, 10:51 am

WAREHOUSES- IAQ PERFORMANCE CALCULATOR

Warehouses-NC-v4 EQp1: Minimum indoor air quality performance
posted by Antonio Cajas on Mar 11, 2022, 4:50 pm

Hello everyone,

I have a project for a manufacturing plant, which has some warehouse modules. These modules have a supply of fresh air through louvers and an extraction through fans. Also...

Last reply: Dave Hubka, Sep 28, 2023, 8:06 am

Is alignment with taxonomy a requirement?

Pilot-Credits INpc164: EU Taxonomy for Climate Change Mitigation
posted by Maria Porter on Sep 28, 2023, 5:00 am

Does achieving this Pilot Credit include that a result of alignment according to the taxonomy is mandatory? Or is eligible and not aligned enough? Can one have “No” on half the requirements and...

Cool wall requirements valid for colder climate zones?

Pilot-Credits SSpc154: Heat Island Mitigation with Cool Walls
posted by Brian Trimble on Sep 26, 2023, 10:48 pm

Some jurisdictions across the US are starting to address the heat island effect by instituting various requirements for cool roofs and pavements. It also appears that they are using this pilot...

How many type of C & D waste to be recycled

NC-v4 MRp2: Construction and demolition waste management planning
posted by Osman Faroq on Nov 9, 2022, 5:07 am

Dear all, 

Good Day, 

While studying Materials and Resources - (LEED V4) Construction and Demolition Waste Management Planning, they mentioned in the prerequisites 5 types of...

Last reply: Alex Porteus, Sep 27, 2023, 7:21 am

Option 3- Transit corridor

ND-Plan-v4 SLLp1: Smart location
posted by Vanessa Rosado on Sep 26, 2023, 10:02 am

Hello Leed user Team

For this option do we need to follow the same requirements as per LT c5  "Access to Quality Transit"? For example, do we need to take into account the following...

Acoustic performance: reverberation time

NC-v4 EQc9: Acoustic performance
posted by alessandro santuari on Jun 1, 2017, 9:28 am

Hi, we have a project with large waiting rooms: are there specific values for "...

Last reply: Soha ElYamany, Sep 26, 2023, 10:25 am

Adhesive used in the project to bond laminate to wood substrate

CI-2009 IEQc4.4: Low-emitting materials - composite wood and agrifiber products
posted by Marie Kranjack on Oct 11, 2012, 11:19 am

We just had this credit denied in our Design and Construction Final Review. We provided all of the required documentation, but the final comment came back stating that we failed to provide "the...

Last reply: Catarina Costa Goncalves, Sep 26, 2023, 9:55 am