Log in
Forum
Topic

Integrative Process for Health Promotion

NC-v4 INc1: Innovation
posted by Peter Doo on Feb 19, 2019, 2:59 pm

Looking for anyone who has done or attempted to do this credit. Seems like an incredible amount of work for 1 point. we are estimating half the amount of effort as the entire LEED project...

California standards mentioned in Purchasing and Material Renovation Credit. Do they apply outside of California as well?

Retail-EBOM-v4 MRp2: Facility maintenance and renovations policy
posted by silvia lovison on Feb 19, 2019, 2:22 pm

Hi guys!

We are currently working on a LEED certification project for a warehouse in Mississippi and while writing our Facility Maintenance and Renovation policy had a question on the...

Area Weighted Average: White Roof, Green Roof, Sloped Roof with Metal Panel and Bulkhead

NC-2009 EAp2: Minimum Energy Performance
posted by Fatou Jabbie, | BSc. Comp. Sci. | MSc. Sustainability Management | LEED AP BD+C on Feb 19, 2019, 12:08 pm

Our project has three different types roof

1. Sloped roof with a centria metal panel
2. White Roof
3. Green Roof
4. Elevator bulkhead "roof"???

I am assuming that...

CI 4.1 BPDO Calculator

CI-v4 MRc3: Building product disclosure and optimization - environmental product declarations
posted by Deborah Stadler on Jan 25, 2019, 6:51 am

The 4.1 document released 1.22.19 has quite a few changes in the BPDO calculator reliant credits.  Any idea when a new calculator incorporating these changes will be available for planning...

Last reply: Anastasia Huggins, Feb 19, 2019, 12:00 pm

ASHRAE 62.1 2013 for NC-2009 IEQp1- Minimum IAQ Performance

NC-2009 IEQp1: Minimum IAQ Performance
posted by Ganesh Dhanakotti on Feb 19, 2019, 1:26 am

Hi,

Our project consists of office building and workshop which is going for  LEED v3 2009.

The workshop is 105 feet wide, which is not able to compliance for IEQ Prerequisite 1  ...

Last reply: Andrew Mitchell, P.E., Feb 19, 2019, 11:03 am

Thermal comfort in schools- summer months

Schools-NC-v4 EQc5: Thermal comfort
posted by Keith Robertson on Feb 19, 2019, 10:17 am

In assessing thermal comfort, is it legitimate to exclude the summer months when the school is not occupied?

System designation

NC-2009 EAp2: Minimum Energy Performance
posted by Jorge López de Obeso on Feb 18, 2019, 12:54 pm

Hi everyone

We have this project that consists in Hotel and retail spaces, where the retail spaces are owned by the hotel but leased to third party. 

We are kind of lost selecting...

Last reply: Marcus Sheffer, Feb 19, 2019, 9:58 am

Friendly leed

Healthcare-v4 MPR2: Must use reasonable LEED boundaries
posted by AHMED ABDELHAKAM on Feb 19, 2019, 1:34 am

I work in leed health care project in Kuwait and our contract state that our project have to be friendly leed ?
-What mean by friendly leed.
- what is the minimum requirement and the...

Clarifications on waste consideration from site office

CS-2009 MRc2: Construction Waste Management
posted by pradeep kumar on Feb 19, 2019, 3:59 am

Hi,

In one of our project, we sent the paper waste from the site office for recycling. Please let us know whether this paper waste from the site office can be considered in the...

Quality Transit- Distance

NC-v4 LTc5: Access to quality transit
posted by Priya Venkat on Feb 19, 2019, 3:44 am

My project is located in a huge campus, and the distance to the main entrance of the campus is more than 800 m...