Log in
Forum
Loading...
Topic

MR BPD&O Calculator v4.1

NC-v4.1 MRc2: Building product disclosure and optimization - environmental product declarations
posted by Agata Mozer on Apr 15, 2019, 7:50 am

Hello,

I would like to replace the v4 credit with v4.1 equivalent and track the credit status via appropriate calculator. Could you tell me where can I find the right editable document?...

Last reply: Anastasia Huggins, Jul 9, 2019, 9:22 am

CEE Tier 3A Washer Requirement

NC-v4 WEp2: Indoor water use reduction
posted by Katie Herber on Jul 21, 2016, 3:10 pm

This prerequisite calls for all commercial washing machines to meet CEE Tier 3a, however the CEE website indicates that the commercial washing machine program is currently suspended in order to...

Last reply: marie-eve lachance, Jul 9, 2019, 6:02 am

Campus possiblity

LEED Guidance for Campuses and Multiple Buildings
posted by Helena Garcia on Jul 9, 2019, 3:51 am

Hello LEEDusers!

We are working with a new project and we are thinking to a possible campus certification. The team has a question about it because it would be our first campus...

Campus possiblity

Schools-EBOM-v4 MPR3: Must comply with project size requirements
posted by Helena Garcia on Jun 27, 2019, 4:23 am

Nadav Malin LEED Fellow, President, BuildingGreen, Inc. LEEDuser Moderator 810 thumbs up June 27, 2019- 7:43 am Hi Helena, I haven't dealt with campus projects myself, so I don't have a good answer for you. But there is a separate forum on LEEDuser for " LEED Guidance for Campuses and Multiple Buildings." I suggest that you repost your question there, where more knowledgeable people may be hanging out. Log in or register to post comments Helena Garcia Bioconstruction, Green Building Management LEEDuser Basic Member 3 thumbs up July 9, 2019- 3:49 am Hello nadav Thank you very...

Last reply: Helena Garcia, Jul 9, 2019, 3:49 am

Concrete Mixes Counting as Separate Products- One EPD

NC-v4 MRc2: Building product disclosure and optimization - environmental product declarations
posted by Summer Gorder on Jul 2, 2019, 11:49 am

The Concrete supplier utilized multiple "mixes" of concrete in the project. A mix has slightly different functions, which I think would mean it is a separate product based on the USGBC definition...

Last reply: Craig Graber, Jul 8, 2019, 6:53 pm

Zero Lot Line Deveoped Site

CS-2009 SSc6.1: Stormwater design - quantity control
posted by Guillermo Hernandez Espinoza on Jul 8, 2019, 5:54 pm

Hi everyone.

We are working on a zero lot line site where an old building was demolished in order to start with the new one.
The old building was composed only by hardscapes.
...

Last reply: Michael DeVuono, Jul 8, 2019, 6:46 pm

Green Energy

LEED v4.1 Discussion Forum
posted by David Stern on Jun 24, 2019, 6:17 pm

Which of the following is Clean Energy... Laser Power, Hydro, Nuclear, Burning Dung, Methane, Clean Coal, Geothermal and/ or National Gas? Thank You 

Last reply: David Posada, Jul 8, 2019, 6:39 pm

LT C6- peak visitors

CS-v4 LTc6: Bicycle facilities
posted by Maria Peralta on Jul 1, 2019, 12:23 pm

David Posada Integrated Design & LEED Specialist, SERA Architects LEEDuser Premium Member 1940 thumbs up July 8, 2019- 6:18 pm See the response over at: https://leeduser.buildinggreen.com/forum/estimating-peak-visitors#comment-58173   Log in or register to post comments ...

Last reply: David Posada, Jul 8, 2019, 6:18 pm

Estimating the Peak Visitors

CS-v4 LTc6: Bicycle facilities
posted by Ciaran McCabe on May 7, 2019, 11:17 am

Hi,

Is there an accepted methodology for calculating the number of peak visitors. I am working on a Core & Shell Office therefore its not straightforward to estimate ?

This...

Last reply: David Posada, Jul 8, 2019, 6:14 pm

ENERGY STAR certified washer/dryer combos?

NC-2009 EAp2: Minimum Energy Performance
posted by Danielle Waters on Jul 8, 2019, 3:00 pm

If ENERGY STAR does not have a certification for dryers or washer/dryer combos, are combos excluded from the prerequisite? 

Last reply: Waleed AlGhamdi, Jul 8, 2019, 3:44 pm