Log in
Forum
Loading...
Topic

RPC for NDv4

ND-Plan-v4 RPc1: Regional Priority
posted by Jos Schild on Jul 4, 2016, 3:22 pm

I'm looking for the RPC for a project in Saudi Arabia. But the site http://www.usgbc.org/rpc isn't working for this version.

Last reply: Eliot Allen, Mar 23, 2020, 5:21 pm

Are there any Sunset Dates for v4.0 (since v4.1 is now active)? 2Qs

LEED v4.1 Discussion Forum
posted by Jenni Betancourt on Mar 23, 2020, 3:06 pm

I have a very large project that will not start construction until 2022 or 2023 and it will be under construction for several years. I therefore want to be careful about sunset...

Possible exemptions for projects with Customs and Border Protections section of building?

NC-v4 EQc8: Quality Views
posted by Jason Biondi on Mar 23, 2020, 2:13 pm

Our project is currently having issues qualifying for this credit due to federal code requirements for the CBP section of the building. Is it possible for this section of the project to be exempt...

Last reply: emily reese moody, Mar 23, 2020, 2:25 pm

Parking Under Cover and SRI Requirement

NC-v4 SSc5: Heat Island Reduction
posted by Summer on Oct 9, 2019, 4:35 am

Hi,

Our project have a 100% parking space under cover which means we are okay with option 2. Do we need to comply with...

Last reply: Eric Anderson, Mar 23, 2020, 1:22 pm

LEED EB v4.1- Data Centers

EBOM-v4.1 EAc1: Energy Performance
posted by Vanni arasan on Mar 23, 2020, 11:24 am

I am working on LEED v4.1 EB O&M Datacenter rating system, I haven't getting Energy Performance score.  Please advise how to enter the energy data i.e., Whole Facility Energy Consumption...

Green Power Query

NC-v4 EAc7: Green power and carbon offsets
posted by Andrei Sabater on Mar 18, 2020, 12:30 am

I am Andrei Sabater, employee of ecoSolutions, Right now we are currently studying the credit for the...

Last reply: Heather Schrock, Mar 23, 2020, 11:48 am

Is tehre a reference as to which costs are to be considered?

NC-v4.1 MRc3: Building product disclosure and optimization - sourcing of raw materials
posted by Benjamin Weise on Mar 23, 2020, 3:39 am

Hi,

this question is about a project in Germany, so cost estimates might work differently here. We are having difficulties retrieving the material costs from the subcontractors.

The...

Modeling Future Tenant Spaces

CS-2009 EAc1: Optimize Energy Performance
posted by Anna Kaelin on Mar 12, 2020, 2:12 pm

As our C&S spaces are a future build out we have to predict what the fan power in our FCUs will be. We have manufactures data for all the potential FCUs that could be connected to the...

Last reply: Marcus Sheffer, Mar 20, 2020, 2:44 pm

Exterior lighting

NC-v4 EAp2: Minimum Energy Performance
posted by Marica Marzari on Feb 4, 2020, 4:39 am

Hi all,
I'm working on a commercial building which have a big terrace that is covered by the building roof.
How can I consider the exterior lighting in the terrace, like Sales...

Last reply: Marcus Sheffer, Mar 20, 2020, 2:22 pm

LEED online Substitution v4.1 for v4 MRC1: Submit 4 Points for Option 4 Path 4?

NC-v4 MRc1: Building life-cycle impact reduction
posted by J Schuetz on Mar 20, 2020, 9:04 am

Dear all,

as our project meets the requirements of Path 4, we like to submit 4 Points in LEED online. For Option 4 under LEED v4 only 3 Points are available at the thresholds. Is it...