Log in
Forum
Loading...
Topic

Luminaries inside parking cover are exterior lightings?

NC-v4 SSc6: Light Pollution Reduction
posted by Thomas Tan on Nov 25, 2019, 5:04 am

Dear All,

I have a large parking...

Last reply: Bill Swanson, Dec 2, 2019, 3:01 pm

Energy model as per ASHRAE 90.1-2013

Retail-NC-v4 EAp2: Minimum Energy Performance
posted by Vassil Vassilev on Dec 2, 2019, 5:06 am

Greetings,

We art to prepare an energy model for a project, which should be in accordance with ASHRAE 90.1-2013.

The energy source of the project is electricity. The climate zone is...

Last reply: Marcus Sheffer, Dec 2, 2019, 1:10 pm

EA CR 02- Qualified List

NC-2009 EAc2: On-Site Renewable Energy
posted by SAMY Chamy on Apr 29, 2017, 9:03 am

Dear Concern:-
I have some doubt in this credit

1.Off site...

Last reply: Marcus Sheffer, Dec 2, 2019, 1:01 pm

50% unbound

Healthcare-v4.1 SSc5: Heat Island Reduction
posted by Lene Hill on Dec 2, 2019, 11:31 am

What does unbound mean? How is unbound determined?  Does a paver such as Unilock Eco-optilock meet that requirement?

Does unbound refer to the % openings in the pavers or the void space in...

Exemplary Performance

CS-v4 EAc2: Optimize Energy Performance
posted by Maria Porter on Nov 29, 2019, 6:21 am

Is the Exemplary Performance threshold 54 % for CS as well (like NC?) The leap seems bigger for CS project than for NC Projects, based on that the table ends on 47 % for CS and 50 % for NC, both...

Last reply: Maria Porter, Dec 2, 2019, 9:21 am

LEED BD+C: Retail or LEED ID+C: Retail?

LEED Rating System Selection
posted by Borja Sánchez on Sep 27, 2017, 4:41 am

Hi, I have a doubt of what rating system is more adequate for a new LEED project that we are working on.

The project consists in a major renovation (it includes changes on façades,...

Last reply: Ricardo Filho, Dec 2, 2019, 8:02 am

No Cooling Tower pilot credit

Pilot-Credits WEpc94: No Cooling Tower
posted by Gail Napell on Oct 30, 2018, 12:59 am

Hi all

we're pursuing this credit and received a comment from the LEED reviewer that we need to submit the survey confirmation e-mail in order to achieve the credit.  The survey asks if we...

Last reply: Bipin Karki, Dec 2, 2019, 7:47 am

LEED ID+C: TIME, BOUNDARY AND OWNER

LEED Rating System Selection
posted by ARDOR GREEN on Jun 26, 2018, 3:01 am

Dear all,

A building with 8 rooms that have similar areas of 3,825 sqm is under construction phase. Its owner wants to get LEED ID+C certification for R&D room.

Question...

Last reply: Ricardo Filho, Dec 2, 2019, 6:57 am

Available regional credits for Buenos Aires?

NC-v4 RPc1: Regional Priority
posted by Victoria Rios Esteve on Nov 21, 2019, 9:29 am

Hi everyone, 

I was wondering if anyone has idea which regional credits are available for Buenos Aires, Argentina right now. 

Thank you for your answer!

Last reply: Tristan Roberts, Dec 1, 2019, 6:04 pm

Compliance Strategies and Successes

Pilot-Credits MRpc102: Legal Wood
posted by Chris Pyle on Nov 29, 2019, 3:06 pm

Hi all!

I'm looking to achieve this Pilot credit for my project. How have people found success achieving this? My thought is to insert the "ACP" language under the Recycled Content...