Forum quick links
Has the Composting credit been achieved with limited composting receptacles in the building?
Pilot-Credits SSpc129:Comprehensive Compostingposted by Kristen Fritsch on
The amount or spacing of receptacles are not necessarily spelled out, as w/ the recycle bins, and mainly the only place I am drawing from that it should be provided in all spaces is in the "Require
Trees sf calculation for Protect or Restore Habitat v4.1
NC-v4.1 SSc2:Protect or Restore Habitatposted by Maya Facciolo on
How do we calculate the square footage for contiguous trees for Protect or Restore Habitat v4.1?
Furniture Reuse
CI-v4.1 MRc4:Sourcing of Raw Materialsposted by Dyllon Leather on
A project is renovating the 3 floors it occupies in an office building.
Embedded Grout Applications - VOC Requirements
NC-v4.1 EQc2:Low-Emitting Materialsposted by Faran Arshad Chohan on
If a grout product is being used within concrete/foundation works (non-finish application), where the material will be fully embedded and not exposed to occupied indoor spaces or interior air durin
Clarification on LEED Low-Emitting Materials Applicability for Concrete Curing Compounds
NC-v4.1 EQc2:Low-Emitting Materialsposted by Faran Arshad Chohan on
We would appreciate clarification regarding the applicability of LEED v4/v4.1 Low-Emitting Materials requirements for concrete curing compounds used as part of cast-in-place concrete works.
Are ASHRAE 62.1-2016 exhaust rates strictly mandatory for v4.1 O+M (EQp Minimum IAQ)?
EBOM-v4.1 EQp1:Minimum Indoor Air Qualityposted by Johan Sebastian Bolivar Sora on
Hello LEEDuser community,
I’m working on the feasibility phase for a LEED v4.1 O+M: Existing Buildings project and ran into a gray area regarding exhaust requirements.
Above ground storage tanks
NC-v4 LTc3:High priority siteposted by Samuel Calhoun on
A project I am working on had (QTY: 27) above ground storage tanks removed from the site. This work was overseen by a 3rd party consultant, permitted by the local AHJ, and registered with the DEP.
Defining the LEED boundary when an ancillary building is operationally and technically independent (v4.1 BD+C)
NC-v4.1 MPR2:Must use reasonable LEED boundariesposted by Somebody Else on
Seeking input on LEED project boundary definition for a site containing two physically separate buildings: a main institutional building and an ancillary building serving a specialised operational
Emergency Showers and Bicycle Facilities
CI-v4 LTc4:Bicycle facilitiesposted by Crista Shopis on
Could emergency showers included in a Lab project meet the requirements for Bicycle Facilities credit?
Thresholds differ in Option 1 and 2 of Water Efficiency Prerequisite
NC-v5 WEp2:Minimum Water Efficiencyposted by Akshay Korlekar on
The required thresholds for Water Efficiency in option 1: Prescriptive Path are :