Hi All,
We are modelling a commercial tower under ASHRAE 90.1‑2010 Appendix G. The proposed design includes:
- Cooling via central chiller (summer months)
- Heating via heat pumps (for 2 winter months)
- HVAC system per floor, with some spaces having heat recovery and DOAS, while others not.
System 8 (VAV w/parallel fan-powered boxes) turns out to be the baseline HVAC system
Queries:
- For heating in the baseline, is it sufficient to model electric resistance coils at the zone level (parallel fan powered boxes), or must we include a heat pump or central heating coil in the baseline system as well?
- Regarding heat recovery: since the proposed design includes heat recovery in some spaces only, and in baseline each floor is served by a single HVAC system, how should this be reflected in the baseline? Should the baseline system include heat recovery in HVAC system for the entire floor?
Appreciate your views and response.