Log in
Forum
Loading...
Topic

Refrigerated Areas

Warehouses-NC-v4 EQc8: Quality Views
posted by Ricardo Sá on Jun 12, 2019, 6:13 am

Dear All,

we are evaluating the possibility of certifying a distribution center with large refrigerated areas. These areas are regularly occupied.

In what relates to EQ 8 -...

Refrigerated Areas

Warehouses-NC-v4 EQc7: Daylight
posted by Ricardo Sá on Jun 12, 2019, 6:11 am

Dear All,

we are evaluating the possibility of certifying a distribution center with large refrigerated areas. These areas are regularly occupied.

In what relates to EQ C7...

UL/Ecologo category 2794 for certified disinfectants not listed in the recommended products??

EBOM-v4 EQp3: Green Cleaning Policy
posted by Martine Menard on Jun 11, 2019, 1:51 pm

Why is UL/Ecologo category 2794 (for disinfectants) NOT LISTED in the recommended products to be used??? Is this a mistake? enduser is asking to get an approved disinfectant …..help.

...

Last reply: Stephen Ashkin, Jun 11, 2019, 6:36 pm

Control for Detention/rehab facilities

NC-v4 EQc5: Thermal comfort
posted by Rob Mark on Jun 11, 2019, 12:41 pm

Hello,

We have a facility that is a detoxification center for youth that has a number of secure rooms for several weeks stay for each patient/detainee. There are controls for the space but...

Park project with underground car park

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by Osama Touni on Jun 11, 2019, 2:16 am

Hi,

We have Park project with underground car park that serve the park, and it is required to get the LEED Gold certificate, my question, Is park project can be certified under LEED rating...

Last reply: David Posada, Jun 11, 2019, 3:13 pm

MRc2 Building Product Disclose and Optimization- Compliance Clarification

NC-v4.1 MRc2: Building product disclosure and optimization - environmental product declarations
posted by Jasmine Abdollahi on Jun 11, 2019, 1:20 pm

Hello, 

I have a project with products with accordance with ISO 14025, but not EN 15804 or ISO 21930. Would these materials meet the requirement for the credit, or is required to also...

Metered faucet duration

CS-v4 WEp2: Indoor water use reduction
posted by Lisa Marshall on Sep 14, 2018, 4:37 pm

Hello, I have received a comment from a reviewer stating we needed to use the a duration of 30 seconds on a metered faucet.  I don't know many people who wash hands for 30 seconds.  What is the...

Last reply: emily reese moody, Jun 10, 2019, 7:08 pm

Formaldehyde resins in mineral wool insulation and firesafing

Healthcare-v2009 IEQc4: Low-emitting materials
posted by Larry Jones on Nov 11, 2014, 9:41 am

Credit language for IEQc4, Group 4 requires all “Batt insulation products” inside the weatherproofing system to “contain no added formaldehyde, including urea-formaldehyde, phenol formaldehyde...

Last reply: debra lombard, Jun 10, 2019, 4:10 pm

Any constraint on the location?

Pilot-Credits SSpc83: Offsite Financial Support for Habitat Protection
posted by Yoyo Shek on Mar 14, 2019, 6:27 am

Hi All,

Originally in the Credit language Option 2:

"Financial support must be provided to a nationally or locally recognized...

Last reply: Rachel Nicely, Jun 10, 2019, 12:06 pm

LEED v4.1 makes changes for commingled waste in Option 1- What do you think?

NC-v4 MRc5: Construction and demolition waste management
posted by Michelle Reott on Jan 23, 2019, 3:21 pm

I'm hopeful that everyone on this forum has seen the BD+C LEED v4.1 new language for MRc5 regarding...

Last reply: Kathryn Owens, Jun 10, 2019, 8:20 am