Log in
Forum
Loading...
Topic

New project on university campus that already has 2700 parking spots

NC-v4 LTc8: Green vehicles
posted by Alana Cristante on Apr 16, 2019, 9:09 am

Hi there,

We are working on a new science lab on a university campus. The campus already has 2700 parking spots, with the current parking demand being only 2100 or so. Our project "...

View type 3. Unobstructed views located within the distance of three times the head height of the vision glazing

NC-v4 EQc8: Quality Views
posted by Keith Robertson on Jan 8, 2018, 1:02 pm

Basic Member July 16, 2018- 12:19 pm I would also like some clarification on this point.  In another LEEDuser thread (https://leeduser.buildinggreen.com/forum/view-type-3-private-office-space), it states...

Last reply: Sherman Aronson, Apr 16, 2019, 11:13 am

Material costs necessary?

NC-v4 MRc2: Building product disclosure and optimization - environmental product declarations
posted by Tommy Linstroth on Nov 7, 2018, 1:29 pm

For EPD Option 1 or MIR Option 1, it would seem you can just submit 20+ products with EPDs and not have to provide any material cost data whatsoever in the BPDO calculator, since the cost...

Last reply: Douglas Flandro, Apr 16, 2019, 9:07 am

V4.1 Hospitality EBOM Recertification

LEED Recertification: When and How
posted by Denaye Hinds on Apr 16, 2019, 7:51 am

Are EBOM...

Refrigerated areas

NC-v4 EQc5: Thermal comfort
posted by Ricardo Sá on Apr 16, 2019, 4:45 am

Dear All,

we are evaluating the possibility of certifying a distribution center, where 85% of the area is refrigerated for product conservation (between 0 º C and 4 ºC).

In what...

Phased Cx for a phased project

NC-v4 EAp1: Fundamental commissioning and verification
posted by Peter Doo on Apr 15, 2019, 4:55 pm

We are working on a comprehensive renovation and addition of an Art Center at an independent high school. The project will be phased; existing system upgrades and building renovation in phase 1...

MR BPD&O Calculator v4.1

NC-v4.1 MRc2: Building product disclosure and optimization - environmental product declarations
posted by Agata Mozer on Apr 15, 2019, 7:50 am

Hello,

I would like to replace the v4 credit with v4.1 equivalent and track the credit status via appropriate calculator. Could you tell me where can I find the right editable document?...

Last reply: David Hubka, Apr 15, 2019, 3:00 pm

Semiheated

NC-v4 EAc2: Optimize Energy Performance
posted by Sarah Leenknegt on Apr 15, 2019, 9:55 am

Hi

I have not yet found a clear description of the way of modelling a semiheated zone, so I will attempt to summarize. Please correct/append where needed.

- Exterior surfaces for...

Last reply: Marcus Sheffer, Apr 15, 2019, 2:38 pm

On-Site Renewable Purchase Agreement

NC-2009 EAc2: On-Site Renewable Energy
posted by Kristen Gomez on Apr 14, 2019, 10:10 pm

I am working on a project which install PV panels on the roof. Since the the PV panels supplier has also the same owner with my project, how will I document Purchase Agreement with 10year...

Last reply: Marcus Sheffer, Apr 15, 2019, 2:22 pm

Only commuter rail frequency complies with requirements

NC-v4 LTc5: Access to quality transit
posted by Ricardo Sá on Apr 15, 2019, 12:58 pm

Dear All

we are evaluating the possibility of certifying a distributrion center.

In what related LT C5 (“Access to Quality Transit”):

  1. the building is served...