Documentation requirements

Pilot-Credits IPpc89: Social equity within the community
posted by Anna K on Dec 17, 2018, 11:45 am

I am working on a project pursuing IPpc89 Social Equity within the Community under LEED CI, v2009.  We are using Alternative Compliance Path for Option 2 where our project client is also a...

Interior and Exterior material

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Edgar Arevalo on Dec 13, 2018, 3:55 pm

I'm looking at a submittal that has a material that is to be used on interior and exterior metals of the building construction.  Since the adhesive is used for both, can I still account for this...

Last reply: Tristan Roberts, Dec 17, 2018, 12:28 pm

Prerequisites on Design Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Andrés Felipe Sánchez Sánchez on Dec 15, 2018, 6:24 pm

For version 4, Is it possible to send the Design Final Review without documenting one or more prerequisites. In a project there is not enough information to document one prerequisite, but for the...

Last reply: Marcus Sheffer, Dec 17, 2018, 10:34 am

Baseline for CI when the CS certification is being carried out simultaneously

CI-v4 EAp2: Minimum Energy Performance
posted by Sansiago Velez on Dec 17, 2018, 5:55 am

This project is a CI fit out for 100% of the leasable floor area of the...

Last reply: Marcus Sheffer, Dec 17, 2018, 10:31 am

Which calculator should I use?

NC-2009 MRc4: Recycled Content
posted by Ines Fischer on Dec 17, 2018, 9:56 am

Hi everyone!! Thanks for all the support in my preovious question 

So.. I am working on three different projects. I am wondering now, which material calculators should I use for each? ...

How to control the maximum number of cycles of the cooling tower?

NC-v4 WEc3: Cooling tower water use
posted by Yoyo Shek on Dec 17, 2018, 12:03 am

Hi All,

How do we control the maximum number of cycles of the cooling tower?

Is it by controlling bleed off rate and make-up water rate according to the following method which I...

Previously developed land

Warehouses-NC-v4 LTc2: Sensitive land protection
posted by Prakash Sekar on Dec 17, 2018, 1:29 am

Location: Malaysia

Project type: Warehouse

The project is located in a site that is previously developed where a portion of the land is already constructed (Manufacturing Unit) and...

Last reply: Blake Jackson, Dec 17, 2018, 9:19 am

Daylight and Quality of Views Calculator Not Working

CI-v4 EQc8: Quality Views
posted by Steven Wychorski on Dec 17, 2018, 6:19 am

Is anyone having a problem with the downloaded Daylight and views calculator?

It's not summarizing my SqM. I've added 50 rooms and the access for view cell number stays exactly the same,...

How to control the maximum number of cycles of the cooling tower?

NC-v4 WEc3: Cooling tower water use
posted by Yoyo Shek on Dec 17, 2018, 1:22 am

Hi All,

How do we control the maximum number of cycles of the cooling tower?

Is it by controlling bleed off rate and make-up water rate? 

Thanks in advance!

...

Last reply: Yoyo Shek, Dec 17, 2018, 1:23 am

final fit-out on tenants request-> designing provisions for negative pressure difficult

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Mark Kumar Bose on Jun 3, 2018, 6:12 pm

Hi,

how do deal with the fact that often the final office floor plans will be fixed later on tenant request so that the technical provisions (negative pressure, etc.) for copy rooms can...

Last reply: Mark Kumar Bose, Dec 16, 2018, 9:43 am