Log in
Forum
Topic

Carpet Tile as an Entryway System

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by James Keohane on Sep 17, 2018, 1:06 pm

The Reference Guide for EQc1, Option 1- Entryway Systems describes entryway system in part ..…... " rollout mats and any other materials manufactured as entryway systems with...

Last reply: Trista Little, Oct 17, 2018, 9:08 pm

Project pursuing Option 2 in EQp Green Cleaning Policy

EBOM-v4 EQc6: Green cleaning - custodial effectiveness assessment
posted by Shakir Ismail on Sep 19, 2018, 3:18 am

Hi,

The credit language for EQc6...

Last reply: Trista Little, Oct 17, 2018, 8:31 pm

Attached building within the LEED boundary

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by Omar ElRawy on Oct 17, 2018, 5:25 pm

I have a site with existing buildings, and I will attach a new building intended for LEED certificate to the existing buildings, which aren't pursuing LEED.  I need to know if that complies with...

Option 2- Based on GSF, excluding garage area but including garage CDW?

NC-v4 MRc5: Construction and demolition waste management
posted by Michelle Bombeck on Oct 15, 2018, 8:02 pm

It appears that the for Option 2, teams must calculate the total waste generated for the project which might include construction of a garage or other site feature that would not be included in...

Last reply: Michelle Bombeck, Oct 17, 2018, 3:59 pm

Definition of Material Streams

NC-v4 MRp2: Construction and demolition waste management planning
posted by Christopher Russell-King on Oct 2, 2018, 1:34 pm

Hello, we are currently working on a new building under LEED V4, and we have doubts regarding what is considered a material "stream".

Our current solution involves a Certified Waste...

Last reply: Tiffany Beffel, Oct 17, 2018, 3:07 pm

LEED OnLine now LEED Off Line?

Navigating LEED Online
posted by Kelly Ingalls on Sep 20, 2018, 11:44 pm

LEED On Line Version 2009 is no longer functional? I've spent several hours this week trying to resolve Adobe Reader issues (DC etc.) with no success. I've been advised by Technology that I...

Last reply: Brian Salazar, Oct 17, 2018, 12:31 pm

Which Prescriptive Compliance guidelines for large office buildings?

ND-Plan-v4 GIBp2: Minimum building energy performance
posted by sarit benayahu on Oct 17, 2018, 4:07 am

Hi,

I am preparing the energy planning guidelines for a LEED ND Plan Business sector. I am looking for prescriptive compliance guidelines for office buildings 30 or more stories tall (more...

Last reply: Eliot Allen, Oct 17, 2018, 12:24 pm

Universal Notification Requirements

EBOM-2009 SSc3: Integrated Pest Management, Erosion Control, and Landscape Management Plan
posted by Kristen Paradiso on Oct 17, 2018, 10:30 am

What needs to be included in a universal notification about a Tier 2 pesticide application? I've found old documentation stating a "Signal Word" needs to be included. Is this still required?

Last reply: Kristina Bach, Oct 17, 2018, 11:33 am

Option 3: Major component/take back system

CI-v4 MRc2: Interiors life-cycle impact reduction
posted by Nicole Isle on Aug 11, 2017, 1:33 pm

I'm working on a LEED v4 CI Office project that wants to go for Option 3: Design for Flexibility

One options is to "Include in at least one major component or system purchase contract a...

Last reply: Paula Melton, Oct 17, 2018, 9:45 am

Diferent product references of one of several brands in same EPD

NC-v4 MRc2: Building product disclosure and optimization - environmental product declarations
posted by Ricardo Sá on Jul 30, 2018, 2:04 pm

Hi All,

According to LEED BD+C_V4 “EPD type III (specific product) it counts as one single product.”.

If we have an EPD type III, of several similar products, of diferente brands,...

Last reply: Nadav Malin, Oct 17, 2018, 6:29 am