Forum
Topic

Documenting ID credits

NC-v4 INc1: Innovation
posted by Leilanie Bruce on Apr 25, 2017, 3:56 pm

Since all the ID credits are under one form in LEED Online, do you have to wait until construction to submit everything? Or can you submit it partially under design and the rest in construction?...

Last reply: Dustin Norton, Dec 10, 2018, 9:21 am

FF& E- Multi Residential High End Apartments

NC-2009 IEQc4.4: Low-emitting materials - composite wood and agrifiber products
posted by Erika Duran on Dec 22, 2011, 4:10 pm

Are kitchen cabinets considered FF&E? They are included with the apartment when you purchase it, but I wouldnt consider them part of the...

Last reply: Tristan Roberts, Dec 10, 2018, 8:20 am

Bermuda Grass- Native & Adaptive Plant

NC-2009 SSc5.1: Site development - protect or restore habitat
posted by SAMY Chamy on Dec 6, 2018, 6:34 am

Dear Concern:-

we have used Bermuda grass in our Landscape and it is native plant in Bangladesh region but now the reviewer denied it as Bermuda grass is not a native or adaptive plants so...

Last reply: Tristan Roberts, Dec 10, 2018, 8:15 am

1/4 mile radius cuts through buildings....

NC-v4 LTc4: Surrounding density and diverse uses
posted by Alara Matsyk on Oct 13, 2017, 5:19 pm

If the edge of my 1/4 mile radius cuts halfway through a building, should I only be counting half the area of the building in my calculations or can I include the whole building? Or should I be...

Last reply: Kara Strong, Dec 10, 2018, 8:12 am

How to calculate multi-level Decks / Patios

NC-v4 SSc5: Heat Island Reduction
posted by Sara Hickman on Nov 26, 2018, 5:56 pm

The project will have several patios / decks throughout, many of which will be covered by a large cantilever above (being the building itself). Should this be calculated under non-roof...

Last reply: emily reese, Dec 9, 2018, 10:07 pm

Epoxy resin grout

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by soha yamani on Dec 9, 2018, 2:04 am

I have a material submittal for three component multi purpose fluid epoxy resin grout , that is used for concrete column repairing and strengthening 

under which category should this be...

Epoxy mortar for anchoring rebar in concrete

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Anna Okviana on Jul 28, 2016, 6:31 am

Hai, my project use epoxy glue for anchoring rebar from brick wall to column and slab in indoor area. Does it must meet LEED requirement for adhesive and sealant? In my opinion epoxy glue does...

Last reply: soha yamani, Dec 9, 2018, 1:45 am

Environmental Impact Assessment (EIA) reports used for SSc: Site Assessment

NC-v4 SSc1: Site assessment
posted by Asil Rashid on Dec 7, 2018, 11:17 am

Hi ,

I am an environmental consultant by profession. I have carried out many EIA studies. I am currently working as a sustainability consultant in Ireland and my team is exploring the...

Last reply: Tristan Roberts, Dec 7, 2018, 2:29 pm

Bikeshare Programs

NC-v4 LTc6: Bicycle facilities
posted by Allison Wilson on Dec 6, 2018, 8:14 am

Has anyone had experience in a LEEDv4 project using bikeshare networks as a way to reduce the number of bicycle storage spaces that must be incorporated within a project? We're working in an...

Last reply: Emily Purcell, Dec 7, 2018, 2:21 pm

1/4 mile radious from building boundary

CI-v4 LTc2: Surrounding density and diverse uses
posted by ERM Korea on Jan 31, 2018, 7:31 pm

Hello! I would like to ask about the 1/4 mile radius from building boundary. I have already read the article on FAQ and the one which Emily wrote, but I have a small confusion on it.

When...

Last reply: Alara Matsyk, Dec 7, 2018, 1:39 pm