Topic | Recent |
---|---|
GREEN POWER AND CARBON OFFSETS- 5 years contractCI-v4 EAc6: Green power and carbon offsetsposted by Russell Fatkoulin on Feb 21, 2022, 8:23 am
Hi, The property owner has had a green electricity agreement with the electricity supplier for many years. However, here in Sweden, people do not usually sign binding contracts and have... Last reply: Aparna Pradeep Kumar, Apr 6, 2022, 10:01 am |
|
If filtration requirement (#1b) is met, is it necessary to provide calculations for #1c?Pilot-Credits INpc155: Design for Indoor Air Quality and Infection Controlposted by Irene García Sáez on Dec 23, 2021, 3:34 pm
Hi everyone! I'm pursuing this pilot credit for a LEED v4 NC office building. The ventilation system and equipment have been carefully designed, so the ventilation rates are above the minimum... Last reply: Kristina K, Apr 5, 2022, 4:00 pm |
|
No HVAC equipment in the Proposed BuildingCS-2009 EAp2: Minimum Energy Performanceposted by Paula Hernandez on Apr 4, 2022, 1:49 pm
Hi, I am working on the certification of a wharehous, in V2009 version. The wharehouse only counts with ventilation, and no cooling or heating systems. As per ASHRAE 992.1-... Last reply: Paula Hernandez, Apr 5, 2022, 2:46 pm |
|
Should I register for Campus?LEED Guidance for Campuses and Multiple Buildingsposted by Kim C on Apr 2, 2022, 7:23 am
Posting here again hoping for more guidance. Here's my situation. We have Building A, B and C. Building A is going for LEED Silver, while Building C is going for LEED Certified.... Last reply: Erin Holdenried, Apr 4, 2022, 12:10 pm |
|
Occupant perception of building cleanlinessPilot-Credits INpc137: Cleaning and Disinfecting Your Space for Emerging Pathogensposted by Belén Valladares López on Apr 2, 2022, 3:57 pm
Hi everyone |
|
Pursue PPA, but install on the roof the projectNC-v4.1 EAc5: Renewable energyposted by Michael on Mar 26, 2022, 9:50 am
Hi LEED experts, My project is planning to use PPA for solar energy. A solar supplier will come to install their own solar panels on the roof of the project and this energy will be used on-site.... Last reply: Marcus Sheffer, Apr 2, 2022, 1:46 pm |
|
No outdoor lighting?NC-v4 SSc6: Light Pollution Reductionposted by Deborah Lucking on Apr 1, 2022, 1:23 pm
We have a project that has no exterior lighting - not even emergency egress, as the travel paths go through an existing, compliant building. Last reply: Deborah Lucking, Apr 1, 2022, 2:42 pm |
|
MRc7 Combine all three options to meet threshold, and supporting documentation?Healthcare-v4 MRc7: Furniture and medical furnishingsposted by Grace Heraly on Apr 1, 2022, 11:20 am
Hello Everyone, I'm working on a LEEDv2009 HC project, but figured I would post here as the question pertains to v4 as well. I am wondering whether you have to choose one option... |
|
Hotel as Commercial or Residential?NC-2009 SSc4.2: Alternative transportation - bicycle storage and changing roomsposted by Kristopher Croghan on Mar 16, 2016, 10:38 am
Is bike storage for a hotel evaluated as either Commercial/Institutional or Residential use? Last reply: Deborah Lucking, Apr 1, 2022, 11:29 am |
|
7 Stories Residential Building with 43 Dwelling UnitsMid-Rise-v4 EQp1: Ventilationposted by Mario Kranzl on Apr 1, 2022, 5:37 am
We are working on a new project, 7 Stories Residential Building with 43 Dwelling Units. The only non-unit spaces are the corridors connecting the dwelling units. We are now checking the project... |