Elevators in the ProposedNC-v4.1 EAp2: Minimum Energy Performanceposted by Isabel Santos on Feb 26, 2021, 2:59 pm
I am currently computing the elevators' energy consumption in the baseline according to Table G3.1, section 16. After assessing the total peak elevator motor power per car, as Design Builder (... Last reply: Marcus Sheffer, Mar 3, 2021, 10:55 am |
|
Decentralized PM measuring devices permanent installationNC-v4.1 EQc4: Indoor air quality assessmentposted by Sascha Krause on Mar 3, 2021, 9:48 am
Hello all, It's first time that I work with LEED regulations and can't find something about permament installation of PM measuring devices and whether installed devices can improve the... |
|
Construction cost increaseLEED v4.1 Discussion Forumposted by Davide Liviero on Mar 3, 2021, 9:44 am
Hello everyone, I am preparing a preliminary study for a hospital that we are aiming at certifying LEED v4.1 Gold. I have been given the task to predict the variation in terms of cost of... |
|
Water Performance Metering in a complexEBOM-v4.1 WEc1: Water Performanceposted by Monica Chavez on Mar 2, 2021, 5:45 pm
Hello, I am working in a project located in a complex that is pursuing the LEED... |
|
Addressing non-applicable categories in the matrix.Pilot-Credits MRpc103: Integrative Analysis of Building Materialsposted by Michelle Rosenberger on Mar 1, 2021, 7:27 pm
Hello everyone, We recently got a review comment back on this credit saying that not all the information has been provided for end-of-life/Reuse or Product Maintenance in the matrix. We... Last reply: Olga Yuil, Mar 2, 2021, 7:13 pm |
|
Landscaping near the facadePilot-Credits SSpc55: Bird collision deterrenceposted by Michelle Halle Stern on Mar 2, 2021, 5:23 pm
One of my teammates has raised a concern that we aren't eligible for this credit if plantings are located near the facade. I don't see any mention of that requirement in the credit language. Am I... |
|
Documentation RequirementsPilot-Credits SSpc55: Bird collision deterrenceposted by Kristina Kouyoumdjian on Aug 24, 2020, 11:56 am
Hello, In terms of documenation required to be submitted for this credit, under "Building facade and site features" it reads to include a material list and supporting data for materials... Last reply: Michelle Halle Stern, Mar 2, 2021, 5:21 pm |
|
DOL registered apprenticeship programsPilot-Credits IPpc90: Social equity within the project teamposted by Kavita on Dec 29, 2020, 11:43 pm
Is there any website wherein one can check the Department of Labor registered apprenticeship programs? Last reply: Kavita, Mar 2, 2021, 2:33 pm |
|
HVAC System SizePilot-Credits EApc66: Community contaminant prevention - airborne releasesposted by Aaron McEwin on Aug 3, 2017, 12:12 pm
Rule 1111 (Amended July 8, 1983), NOx Emissions from Natural-Gas-Fired, FanType Central Furnaces limits system sizes to 65,000... Last reply: Michelle Halle Stern, Mar 2, 2021, 2:28 pm |
|
MR Pilot Credit 87: Verified C&D Recycling RatesPilot-Credits MRpc87: Verified Construction & Demolition Recycling Ratesposted by Gail Vittori on Jul 13, 2018, 10:35 am
Credit was straightforward. In our market, there is only one CORR-certified provider. Curious if that's the case in other markets. Last reply: Kavita, Mar 2, 2021, 2:17 pm |