Topic

Modeling Microturbines in EnergyPro

NC-v4 EAc2: Optimize Energy Performance
posted by Joel Embury on Feb 21, 2019, 2:29 pm

Marcus Sheffer LEED Fellow, 7group / Energy Opportunities LEEDuser Expert 5489 thumbs up February 21, 2019- 5:17 pm Software specific questions are usually best asked of the vendor's customer service or through one of the forums at onebuilding.org Microturbines would not be at all like solar panels since they consume gas and produce electricity. Both would need to be accounted for in the modeling results. The free heat would assume that there is waste heat recovery associated with the microturbine system. If the software cannot model this system for LEED then you need to provide a work...

Last reply: Marcus Sheffer, Feb 21, 2019, 5:17 pm

Outdoor Space

NC-v4 SSc3: Open space
posted by Daniela Carrillo Lopez on Feb 21, 2019, 3:28 pm

Would a picnic area with tables and chairs fulfill "a pedestrian-oriented paving or turf area with physical site elements that accommodate outdoor social activities"?

Last reply: Tristan Roberts, Feb 21, 2019, 4:58 pm

Low Emitting Material

LEED v4.1 Discussion Forum
posted by Mohammad H Abbasi on Feb 20, 2019, 11:29 am

The updated credit now has more flexibility and easier threshold allowing projects to achieve up to three points but for the emission evaluation now it requires CDPH v1.2 instead of v1.1. also...

Last reply: Mohammad H Abbasi, Feb 21, 2019, 4:18 pm

DOAS & VRF for LEED in EnergyPro

NC-v4 EAc2: Optimize Energy Performance
posted by Joel Embury on Feb 21, 2019, 2:20 pm

I’ve been working on a LEED project with VRF & DOAS in San Jose, CA.  For the LEED Energy Model, EnergySoft suggested attaching the DOAS to 10 sq. ft. dummy rooms, and then "connecting" the...

Permanently installed products definition.

CI-v4 MRc5: Building product disclosure and optimization - material ingredients
posted by shashank gangil on Aug 20, 2018, 12:18 am

For MR credits, what exactly contributed as permanently installed product? Does AC ducts and insulation counted here? If the commercial interior space is using the already existing ducts, should...

Last reply: Laura Smith, Feb 21, 2019, 2:31 pm

v4 compliant non-shrink non-metallic grout?

NC-v4 EQc2: Low emitting materials
posted by Laura Charlier on Feb 21, 2019, 1:33 pm

Has anyone come across a v4 compliant non-shrink, non-metallic structural grout that meets ASTM C 1107? I've been having a hard time finding any that have done the general emissions evaluation....

Locally Sourced materials definition

NC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materials
posted by Elizabeth Kertesz on Nov 22, 2016, 4:46 pm

The reference guide says that products sourced (extracted, manufactured, purchased) within 100 miles of the site are valued at 200% of their cost. So, does this mean that a product has to be...

Last reply: Tristan Roberts, Feb 21, 2019, 12:27 pm

Are Parking areas for Buses and Taxis included in Option 2

NC-v4 SSc5: Heat Island Reduction
posted by Stephan Zweig on Feb 21, 2019, 5:46 am

Hello to all,

Do you  have any suggestion if I have to include for Option 2 of heat island  reduction credit the following:

1) Parking lots for Buses?

2) Taxis waiting areas...

Natural ventilation – modeling in Baseline

NC-2009 EAp2: Minimum Energy Performance
posted by Vassil Vassilev on Feb 20, 2019, 4:38 am

Greetings,

The project that we are modeling has zones with natural ventilation LEED v2009).

As there is no such ventilation systems in the Baseline model (System 5), our idea is to...

Last reply: Vassil Vassilev, Feb 21, 2019, 4:33 am

PV installation built and commissioned prior to Occupancy

CI-v4 EAc4: Renewable energy production
posted by Gary Shlifer on Feb 19, 2019, 8:08 pm

Our project is a 6 story office building, 250,000 sq feet. It is underconstruction. The owner wishes to 'resurrect' a PV covered parking...

Last reply: Gary Shlifer, Feb 20, 2019, 5:31 pm