Medical Office Building- Exam | Soiled/Clean Workroom | Mop Sinks- What fixture should these be listed as on the form?NC-v4.1 WEc2: Indoor water use reductionposted by Catherine Blakemore on Dec 18, 2020, 12:07 pm
I am working on a LEED v4.1 BD+C Medical Office Building project and trying to complet the WEc1 form. There are no fixture options for for the following fixtures: 1) Exam Room sinks or... Last reply: emily reese moody, Feb 2, 2023, 12:13 pm |
|
Cities with composting mandates should have streamlined documentationPilot-Credits SSpc129: Comprehensive Compostingposted by Adhamina Rodriguez on Sep 16, 2021, 3:09 am
Like the Alternative Compliance Path for California projects meeting CALGreen code, cities that have composting ordinances in place should have it easier to document this credit. Last reply: Michelle Rosenberger, Jan 31, 2023, 6:17 pm |
|
GUT certification for Carpet compliantNC-v4.1 EQc2: Low-emitting materialsposted by Angela Loughry on Jan 27, 2023, 10:23 am
Hello- We are using a carpet with GUT cerfication (Gemeinschaft umweltfreundlicher Teppichboden). Has that been sucessfully used as equal to... Last reply: Paula Melton, Jan 30, 2023, 10:16 am |
|
Occupant Load & Usage QuestionNC-v4.1 WEc2: Indoor water use reductionposted by Catherine Blakemore on Jan 27, 2023, 11:43 am
Where does the project Occupant Load and Usage info get logged/docuemnted for the entire project? The WEc2 calculator includes areas where this infor needs be added, but this this... Last reply: emily reese moody, Jan 27, 2023, 11:50 am |
|
C&DWM Campus creditNC-v4 MRc5: Construction and demolition waste managementposted by Geoffrey Brock on Apr 12, 2022, 11:01 am
The LEED reference guide has the C&DWM Planning Pre-req as eligible for Campus credit, but the actual C&DWM credit has Campus INeligible (both are eligible for Group). Why?! C... Last reply: Ryann Malicdem, Jan 25, 2023, 4:38 pm |
|
Desk Fan Fire SafetyNC-v4 EQc5: Thermal comfortposted by Jason Cocek on Jan 25, 2023, 12:11 pm
Has anyone run into the issue of fire marshall not allowing desk fans due to potential fire hazard? If so, what was the solution? Last reply: David Hubka, Jan 25, 2023, 12:20 pm |
|
Deadline for hiring CxANC-v4 EAc1: Enhanced Commissioningposted by Elizabeth Powers on Jan 24, 2017, 1:16 pm
Does anyone know if there is a deadline for hiring the... Last reply: David Hubka, Jan 23, 2023, 1:27 pm |
|
VOC compliant resinous flooring products?NC-v4 EQc2: Low-emitting materialsposted by Cindy Quinn on Jan 20, 2023, 1:29 pm
Has anyone been able to find a resinous flooring system compliant with v4 or v4.1? We are coming up short. Thanks! Last reply: Cindy Quinn, Jan 20, 2023, 5:50 pm |
|
Living Building Challenge- Materials & LEED MR CreditsLEED v4.1 Discussion Forumposted by Dane Andersen on May 5, 2021, 11:17 am
Does anyone know if there is "reciprocity", so to speak, between Living Building Challenge - Materials Petal and LEED MR and EQ credit documentation? I am working on a project pursuing LBC full... Last reply: Renee Shirey, Jan 20, 2023, 11:07 am |
|
Future open space preservation- Campus projectNC-v4 SSc3: Open spaceposted by Andy Rhoades on Jan 17, 2023, 1:46 pm
My question is regarding a multi-phased campus project. Are we able to count future planned open space towards the credit threshold, and if so, what documentation would this require (i.e. plans,... |