Log in
Forum » United States
Topic

"Everything within the waterproofing membrane"

NC-v4.1 EQc2: Low-emitting materials
posted by James Keohane on Jun 24, 2020, 12:14 pm

The credit language states that materials which must meet the requirements are "everything within the waterproofing membrane."

The waterproofing membrane itself ( e.g....

Last reply: Allen Cornett, Nov 20, 2024, 2:38 pm

Pilot Credit: Procurement of Low Carbon Materials

CS-v4 INc1: Innovation
posted by Michelle Bombeck on Jul 22, 2021, 4:26 pm

Hi all - Just sharing our experience so far with this pilot credit, as required... We're pursuing this credit on a large speculative CS office project in WA. Although the construction team has...

Last reply: Ryann Malicdem, Nov 19, 2024, 1:37 pm

Carshare vehicle parking space- Successful implementation?

NC-v4.1 LTc7: Reduced parking footprint
posted by Grace Friedhoff on Dec 29, 2021, 10:12 am

Has anyone successfully implemented Option 2. Carshare in the Reduced Parking Footprint credit? I am having a lot of difficulty finding information on how a project would get one of these...

Last reply: HoMU WELLTECH, Nov 19, 2024, 7:26 am

Aerosol Paints/Coatings- Emissions/VOC Compliance

NC-v4 EQc2: Low-emitting materials
posted by Brad Newkirk on May 22, 2018, 2:04 pm

Based on the language in SCAQMD 1113 (June 3, 2011) and...

Last reply: Sara Axon, Nov 18, 2024, 3:26 pm

Does anyone have a good example or template for a Green Cleaning Policy that meets LEED Version 4.1 requirements

EBOM-v4.1 EQp3: Green Cleaning Policy
posted by Frank Weiss on May 21, 2020, 2:55 pm

Does anyone have a good example or template for a Green Cleaning Policy that meets LEED Version 4.1 requirements.  

Requirements may have changed from teh LEED Version 3 EB and we...

Last reply: Catarina Costa Goncalves, Nov 18, 2024, 7:48 am

Design Flow Rate higher than Baseline

NC-v4.1 WEp2: Indoor water use reduction
posted by Talia Mamayek on Nov 15, 2024, 3:30 pm

Hi,

I am working on a residential project that has bathrooms in an amenity space and spa. I believe these are classified as public lavatory (restroom) faucets with a baseline of 0.5 gpm....

Last reply: emily reese moody, Nov 15, 2024, 3:50 pm

How to Model Proposed and Baseline HVAC system for a District level heating and Cooling system

NC-v4 EAp2: Minimum Energy Performance
posted by Rajat Wadhwa on Apr 11, 2024, 12:16 pm

Hi, 

I am working on a College Building where Cooling and Heating is done by Hot water and chilled water supplied to the building, Based on the user guide what I see is I need to model a...

Last reply: Manuel Romera Molina, Nov 11, 2024, 2:53 am

Light trespass to a "welcoming neighbor"

NC-v4 SSc6: Light Pollution Reduction
posted by John Mlade on Nov 7, 2024, 10:08 am

Hi all, hoping you can provide some insight into this scenario.

We are redeveloping a heavy industry site in an urban setting into a logistics warehouse building. Our...

Last reply: Dave Hubka, Nov 7, 2024, 1:46 pm

Baseline for Botanical Garden Areas of a Building

NC-v4 EAp2: Minimum Energy Performance
posted by on Oct 31, 2024, 12:07 pm

How do we model the baseline systems for an indoor botanical garden? The botanical garden requires a lot of glazing, but more so the HVAC system is really a process load in my opinion because it...

Last reply: Marcus Sheffer, Nov 1, 2024, 9:45 am

Project Occupancy when we are only complying with Indoor Water Use Reduction prerequisite under prescriptive path?

CI-v4 WEp1: Indoor water use reduction
posted by Edgar Arevalo on Oct 25, 2024, 3:17 pm

So we have an interior fit out project where we can only comply with the Indoor Water Use Reduction prerequisite and not the credit.  Since we are only complying with the prerequisite via...