Topic | Recent |
---|---|
LEED point adjustment when ASHRAE 90.1-2019 is used as baselineNC-v4.1 EAp2: Minimum Energy Performanceposted by elvin ruya on Nov 3, 2022, 6:45 pm
Is there a direct correlation for LEED points when ASHRAE 90.1-2019 baseline is used instead of 2016? Last reply: Eric Dixon, Mar 18, 2024, 10:21 am |
|
Pilot Inclusive DesignPilot-Credits INpc125: Inclusive Designposted by Laurie Johnson on Mar 14, 2024, 2:05 pm
I am working on a LEED CI and WELL at Scale project. I am using an approved C13.1 Accessibility and Universal Design: Integrate Universal Design WELL feature as a crosswalk for the LEED Pilot... |
|
Testing strips- other manufacturersPilot-Credits INpc137: Cleaning and Disinfecting Your Space for Emerging Pathogensposted by Glen Boldt on Mar 13, 2024, 8:52 pm
Has anyone had any experience with other manufacturers for the testing strips. Also, what has been the adoption rate of this testing protocol with cleaning staff? |
|
Any way to download LEED project data?LEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Sustainability Ballinger on Mar 13, 2024, 5:29 pm
I'm working on creating a database of our firm's project data, specifically around our sustainability efforts. I don't currently see any way on the LEED Online website to download in a data-... |
|
EV space accessibilityNC-v4.1 LTc8: Electric Vehiclesposted by Lawrence Rennell on Oct 9, 2023, 12:20 pm
Do all EV spaces required to be available to the general public? We are working on a project with parking spaces located within a restricted access area that will not be accessible to the general... Last reply: Michelle Bombeck, Mar 13, 2024, 11:36 am |
|
Non-linear primary direction of travel.NC-v4 EQc1: Enhanced indoor air quality strategiesposted by Michelle Halle Stern on Jul 14, 2023, 12:44 pm
Our entry includes a centered revolving door with people doors on either side. The path of travel from the people doors requires people entering to change directions toward the center of the room... Last reply: Afogreen Build, Mar 13, 2024, 4:43 am |
|
MRpc103 Integrative Analysis of Building MaterialsNC-v4 INc1: Innovationposted by Lisa Bolle on Oct 24, 2023, 5:12 pm
As our project team was performing the analysis of three products, we realized that another potentially useful strategy would be to compare three similar products and use the integrative analysis... Last reply: Maegan Sweeney, Mar 12, 2024, 5:06 pm |
|
High Rise ResidentialNC-v4 EAc3: Advanced Energy Meteringposted by Megan White on May 31, 2016, 6:44 pm
We have a 24 story high rise residential apartment project that wants to pursue this credit however we are looking for guidance as this seems more geared towards commercial office projects with... Last reply: , Mar 12, 2024, 11:25 am |
|
Future open space preservation- Campus projectNC-v4 SSc3: Open spaceposted by Andy Rhoades on Jan 17, 2023, 1:46 pm
My question is regarding a multi-phased campus project. Are we able to count future planned open space towards the credit threshold, and if so, what documentation would this require (i.e. plans,... Last reply: Afogreen Build, Mar 11, 2024, 8:50 pm |
|
Partial Floor LEED CertificationCI-v4 MPR3: Must comply with project size requirementsposted by Edgar Arevalo on Mar 7, 2024, 12:14 am
I have a project that is a partial floor fit-out where the client would like that partial space to be LEED certified. The project space is approximately 52% - 60% of the total floor area, but it... |