Forum » United States
Topic

Innovation: WELL Features

NC-v4 INc1: Innovation
posted by Laura Heagler on Jul 30, 2021, 12:27 pm

This innovation credit awards a point for complying with WELL Feature 87: Beauty and Design. The WELL Building Standard requires a professional narrative describing the incorporation of design...

MRc2 BPDO EPD Option 2 Multi Attribute Optimization

NC-v4.1 MRc2: Environmental Product Declarations
posted by Sarah Linke on Feb 24, 2021, 3:24 pm

Has anyone had success pursuing credit for the BPDO EPD Option 2 (Multi Attribute Optimization)? The companies I have had success finding documentation for are as follows: 

Owens Corning (...

Last reply: Tommy Linstroth, Jul 29, 2021, 12:29 pm

"Fixed Spray irrigation only permitted on Turfgrass"

NC-v4 WEp1: Outdoor water use reduction
posted by Green Projects on Jul 21, 2021, 8:59 am

When the Watersense Water Budget Tool is completed with 'fixed spray' selected as irrigation type for trees and shrubs, it produces a warning in red text that says, "Fixed Spray irrigation only...

Last reply: Afogreen Build, Jul 29, 2021, 5:53 am

Option 1, path 2 flushout hours

NC-v4 EQc4: Indoor air quality assessment
posted by Susan Di Giulio on Jul 28, 2021, 8:57 pm

Hi all, 

Simple question but I do not see it addressed anywhere. We are planning to do the partial flush out during occupancy option. Once we have flushed with the required amount of air...

All landscaped areas removed

NC-v4 WEp1: Outdoor water use reduction
posted by Lou Niles II on May 3, 2021, 6:04 pm

It does not appear LEED give credit for removig all landscaped areas from the exiwting conditions? or at least I cannot find a path for that. New Project Rennovation that is removing all...

Last reply: Afogreen Build, Jul 28, 2021, 8:22 pm

LI 10102- Letter of Commitment- Register incomplete space separately?

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by Deb Favaretto on Jul 26, 2021, 12:54 pm

Hi, 

We will be submitting a LEED BD+C New Construction project with an incomplete space of 18% of the BGSF. We comply with the...

ASHRAE 90.1-2013 for LEED v2009

CS-2009 EAc1: Optimize Energy Performance
posted by Elena Arca on Jul 22, 2021, 5:48 pm

Hi, 

I inherited a LEED project during the...

Pilot Credit 87- Verified Construction and Demolition Rates

Pilot-Credits MRpc87: Verified Construction & Demolition Recycling Rates
posted by Patricia Lloyd on Feb 12, 2018, 1:22 pm

Documentation of this credit was easy because we are using a hauler who has a CORR certified facility that is near to our job.  We tried this pilot credit once before and did not achieve it...

Last reply: Joseph Andracchio, Jul 22, 2021, 4:40 pm

Pilot Credit: Procurement of Low Carbon Materials

CS-v4 INc1: Innovation
posted by Michelle Bombeck on Jul 22, 2021, 4:26 pm

Hi all - Just sharing our experience so far with this pilot credit, as required... We're pursuing this credit on a large speculative CS office project in WA. Although the construction team has...

Point Discrepancy in form 2.0

CI-v4.1 LTc2: Surrounding density and diverse uses
posted by Wayne DeFeo on Apr 12, 2021, 5:24 pm

In reviewing the new form for walkability, has anyone received a determination as to the total number of points received for a walkabilty score of 90-100? On one page it states up to 8 points,...

Last reply: Jim Nicolow, Jul 22, 2021, 1:36 pm