Forum » Spain
Loading...
Topic

Option 2- Carbon dioxide monitoring

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Marina Curto on Mar 8, 2019, 5:32 am

We are working on a New Construction - Warehouse project that has two separate spaces (offices + warehouses). There are no densely occupied spaces with the expected occupancy considered. Are we...

dB & STC

NC-v4 EQc9: Acoustic performance
posted by Helena Garcia on Sep 14, 2016, 6:28 am

I'm working with a Spain Project. Spain doesn't use...

Last reply: Helena Garcia, Feb 27, 2019, 10:09 am

Ventilation Warehouses

NC-v4 EQp1: Minimum indoor air quality performance
posted by Helena Garcia on Jun 20, 2016, 4:12 am

We are certifing a project with two buildings, the first is an offices, the second is a warehouses to rent in Spain.
The question is for the warehouse, this warehouse is not conditioned...

Last reply: Dionisio Franca, Feb 11, 2019, 7:48 pm

Rule 1113 and 1168

Homes-v4 EQc7: Low-emitting products
posted by Xavi Ramon on May 24, 2018, 7:52 am

Can somebody confirm if the limits listed in rule 1168 (adhesives and...

Last reply: Carissa Sawyer, Jan 24, 2019, 11:14 am

LEEDv4 Homes and Multifamily Workbook, Water Reduction Calculato

Homes-v4 WEc1: Total water use
posted by Raquel Clemente on Jul 20, 2017, 4:40 am

Hello!
I am having some trouble to complete de Water Reduction Calculator.

The Project is a whole building, being each floor a different dwelling unit. They are luxury homes, so...

Last reply: Carissa Sawyer, Jan 16, 2019, 6:36 pm

Subtraction metering in C&S

CS-v4 EAc3: Advanced Energy Metering
posted by David Lázaro on Jan 9, 2019, 8:01 am

Good morning,

Would like to clarify if subtraction metering may be used in Core & Shell for the...

Last reply: Marcus Sheffer, Jan 11, 2019, 4:21 pm

Multiply certification

LEED Rating System Selection
posted by JORDI CASTELLANO on Oct 15, 2018, 4:40 am

Hello everyone, 

My question is about the multiply certification. 

A multinational company wants to certificate its stores, but all of its stores are identical (prototype).
so...

Last reply: Tristan Roberts, Oct 25, 2018, 1:43 pm

Kitchen faucet for restaurant project

CI-v4 WEc1: Indoor water use reduction
posted by Borja Sánchez on Feb 8, 2018, 2:31 pm

Hi, we want to certify a restaurant and as described in the reference guide: commercial kitchen (food service) sinks and prep sinks, including pot filling sinks, wash-down, and cleaning sinks can...

Last reply: Suzanne Painter-Supplee, LEED AP+ID&C, Oct 16, 2018, 9:08 pm

Differences between design phase and construction phase

NC-v4 MPR3: Must comply with project size requirements
posted by JORDI CASTELLANO on Oct 15, 2018, 4:09 am

hello everyone,
our project has achieved the design phase of LEED review.
We are working in construction phase, and we have some distribution interiors differences from design phase...

Last reply: Tristan Roberts, Oct 15, 2018, 3:48 pm

Lighting controls requirements

Schools-2009 IEQc6.1: Controllability of systems - lighting
posted by Marina Curto on Oct 5, 2018, 2:07 am

Hi everyone, 

I'm working on a School project in v2009 and I have some doubts whether the lighting controls design would meet credit requirements. I have two different cases:

 -...