ASHRAE 90.1-2016 Appendix G Baseline Heatsource
CI-v4 EAp2:Minimum energy performanceposted by Eric Dyer on
Hello,
We are working on a LEED v4.1 BD+C project where the proposed design uses both District Hot Water (Purchased Heat) and District Chilled Water (Purchased Cooling).
Pursuit of Procurement of Low Carbon Construction materials
Pilot-Credits MRpc132:Procurement of Low Carbon Construction Materialsposted by Patty Marr on
Our project in Kirkland, WA has pursued this credit.
Pursuit of Social Equity Within Project Team
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Patty Marr on
Our team is pursuing this credit.
Development of efficient workflow for integrating material analysis
Pilot-Credits MRpc103:Integrative Analysis of Building Materialsposted by Amanda Tullos on
Has anyone developed an efficient workflow for integrating material analysis early in design without significantly increasing project schedules?
Lighting Control for Resting Room
NC-v4.1 EQc6:Interior Lightingposted by Muhammad Adtar on
We are currently reviewing compliance with LEED v4.1 EQ Interior Lighting credit for a data center project.
Design submittal or construction submittal
Pilot-Credits IPpc93:Prevention through Designposted by Dionisio Franca on
Is there any guidance on whether this credit can be submitted during the design submittal?
ASHRAE 90.1.2010 - Baseline System using Exception of G3.1.1
CI-v4 EAp2:Minimum energy performanceposted by SSN Energy Model on
Hi,
Greetings!
LEED v5:NC Clarification on suitability of minimum energy performance data center calculator to claim savings and confirming climate zone
NC-v5 EAp2:Minimum Energy Efficiencyposted by Sanket Sabale on
Hello team,
Good afternoon. While working on LEED v5 BD+C data center project in Frankfurt, Germany we are seeking for clarification on following queries
Biomass Process Steam
NC-v4 EAc5:Renewable energy productionposted by Keerthi Ratnayake on
Can steam produced from an on-site biomass boiler and used exclusively for manufacturing process loads be counted toward EA Credit: Renewable Energy Production in LEED v4 BD+C?