Industrial NormalizationEBOM-v4 EAp2: Minimum Energy Performanceposted by Muzammal Abbas LEED AP (BD+C) on Aug 5, 2016, 4:53 am
I am working on industrial project and below is the leed reviewer comments that is confusing for me how to deal with it and how to normalize to resole these issues ? The end-use breakdown... Last reply: Ramon Christopher Medrano, Sep 20, 2023, 2:34 am |
|
VOC content for Insulation foam rolls with self adhesive.NC-v4.1 EQc2: Low-emitting materialsposted by Ngo Ha on Dec 16, 2020, 4:33 am
Hi All, Last reply: Ralph Bicknese, Sep 1, 2023, 11:04 am |
|
Minimum Energy PerformanceCI-v4 EAp2: Minimum Energy Performanceposted by Nagaraj Sankar on Aug 22, 2023, 8:09 am
As we have a VRF system for fresh air, we design a seperate proposed case system module for the fresh air system. Is base case system is required in this scenario should also be taken into... Last reply: Marcus Sheffer, Aug 22, 2023, 10:57 am |
|
LEED Certification for an Existing BuildingLEED v4.1 Discussion Forumposted by Mary Christel Eugenio on Aug 15, 2023, 7:57 am
Hi, |
|
SMOKING SIGNAGE for EAp: Environmental Tobacco Smoke ControlEBOM-v4 EQp2: Environmental tobacco smoke controlposted by Ramon Christopher Medrano on Aug 3, 2023, 2:52 am
With regards to our LEED v4 O+M project (group approach). Our project team is on the process on the of finalizing “NO SMOKING SIGNAGE’S” for the project. We have an... |
|
Allignment with WELL Preconditions?Pilot-Credits EQpc105: Lead Risk Reductionposted by Sheena Moses on Jul 26, 2023, 11:01 pm
We have attempted this credit for our office project based as we find that the requirements of 3 separate WELL preconditions and 1 optiimzation are well aligned with the requirements of this... |
|
Parking spaces under tree canopy can be counted under the Option 2: Parking under coverNC-v4 SSc5: Heat Island Reductionposted by Thomas Tan on Feb 18, 2019, 1:55 am
Dear LEED Experts, Our parking spaces consist of two parts: one park is under a roof... Last reply: Afogreen Build, Jul 27, 2023, 2:22 am |
|
Pest managementEBOM-v4 EQc9: Integrated pest managementposted by VISHESH AGARWAL on Aug 19, 2016, 6:10 am
I am working on the project where it is difficult to use SF Tier-3 pesticide as per the LEED Norms. Project is currently using CIB (Central Insecticides Board) which is the apex organization for... Last reply: Catarina Costa Goncalves, Jul 17, 2023, 10:49 am |
|
Measuring Chiller COP- LEED certificationCS-v4 EAp2: Minimum Energy Performanceposted by Shuvajit Batabyal on Jul 3, 2023, 7:09 am
Hello everyone. The subject and the following question might be pretty basic, but since I have no prior experience with LEED certification I thought it would be best to hear what more... |
|
Big project site = more than 400m walking distance to nearest bus stop, but there is a shuttle service within the property.NC-v4 LTc5: Access to quality transitposted by Zirjay Villanueva on Apr 20, 2020, 3:33 am
We're working on a project with a big project site, and the nearest bus stop is more than 400m... Last reply: Ahmed Abd El Fattah, Jun 16, 2023, 8:52 am |