VOC content evaluation documentData-Centers-NC-v4.1 EQc2: Low-emitting materialsposted by Anna Okviana on Nov 26, 2024, 2:36 am
My project have floor hardener product, that comply with voc emission evaluation using GREENGUARD certificate, but the product can't provide document to comply with voc content evaluation because... |
|
Non-Air-condition WarehouseLEED v4.1 Discussion Forumposted by Sonny Calma on Nov 24, 2024, 9:44 am
Could you please clarify whether non-air-conditioned warehouses are eligible for LEED certification? Thank you. |
|
Requirement of Measurement for a new ventilation systemEBOM-v4 EQp1: Minimum indoor air quality performanceposted by Krithikha Muthukrishnan on Nov 22, 2024, 3:27 am
We are working on an existing factory project. It is mechnically ventilated in most spaces and those have been measured. However, the office spaces were conditioned through untiary ACs without... Last reply: Dave Hubka, Nov 22, 2024, 6:57 am |
|
Reduced parking footprint attempted for CampusNC-v4 LTc7: Reduced parking footprintposted by Pham Kim Ngan on Nov 20, 2024, 4:28 am
Hi everyone, We have decided to classify our project as a campus project. The new building is part of Phase 2 of our development and will be constructed on land that has already been... |
|
Helps with operationsPilot-Credits INpc125: Inclusive Designposted by Husam Haron on Oct 22, 2024, 4:22 am
Just sharing. We're working on a campus with several data center buildings. When the idea of Inclusive Design (called "universal design" - UD in my country) was proposed, there were... Last reply: Nadav Malin, Oct 24, 2024, 6:24 am |
|
Exclusion of Swimming pool Water/Energy consumption from main building consumptionEBOM-v4.1 WEc1: Water Performanceposted by P Kumar on Sep 25, 2024, 1:45 pm
We are working on a v4.1 recertification retreat/ resort property in India. Our query is can swimming pool... Last reply: Andrey Kuznetsov, Oct 24, 2024, 6:11 am |
|
Rehab Center- LEED adaptation for completed buildingsLEED Rating System Selectionposted by Junaid Khan on Jul 18, 2024, 3:13 amAndrey Kuznetsov ESG consultant, LEED AP BD+C Self Employed LEEDuser Basic Member 33 thumbs up October 23, 2024- 1:54 am Hello! I think I already posted reply to this question – I suppose it wasn't moderated since it had links to other topic here- you can find it at this forum below, listed "LEED certification for advanced construction process" – to be short: at this stage (completed building) it's already too late to adopt LEED BD+C to it. P.S. For you not to search it- I'll post my reply from there. You are right- at such stage it's too late and impossible to provide... Last reply: Andrey Kuznetsov, Oct 23, 2024, 12:15 pm |
|
Reasonable assumption for plenum ceilingEBOM-v4.1 EQp1: Minimum Indoor Air Qualityposted by Omar Elrawy on Oct 14, 2024, 4:53 am
We have old existing office building where ducted FCU is serving all the spaces. Fresh air is dumped to the plenum (no ducts), likewise for return air, so mixing happen randomly within the... Last reply: Andrey Kuznetsov, Oct 23, 2024, 2:12 am |
|
Standard for the baseline of the cold storage in a factoryNC-v4.1 EAp2: Minimum Energy Performanceposted by Michael on Sep 11, 2022, 1:40 pm
My factory project has cold storage (10oC) and a freezer (-13oC). For the factory, we use ASHRAE 90.1-2016 as normal but for the cold storage and freezer, what is the standard to set up the... Last reply: Marcus Sheffer, Sep 12, 2024, 1:49 pm |
|
How to determine Fan EFLH (Equivalent Full Load Hours)NC-v4 EAp2: Minimum Energy Performanceposted by Michael on Aug 8, 2024, 3:24 am
Hi LEED experts, In the MEPC file, I see the Fan EFLH is determined by dividing the annual fan consumption by the total fan power (kW) in the tab "Performance Output". Based on the MEPC... Last reply: Tyler Thumma, Sep 5, 2024, 8:09 am |