Energy Modeling using “HAP”

NC-2009 EAp2: Minimum Energy Performance
posted by Muzamil Rafique on May 27, 2016, 2:50 am

I am doing the energy model for a project. The project total area is “153,145 sf”, 25,346 sf area of the total area is condition and the other “127,799” sf area is unconditioned, “ventilation fan...

Last reply: Marcus Sheffer, Mar 26, 2024, 7:46 pm

Modeling only conditioned area

NC-v4 EAp2: Minimum Energy Performance
posted by Omar Elrawy on Dec 9, 2020, 10:05 pm

I'm certifying a huge factory with an attached office building. Is it possible to model only the office area?
The factory is high on process loads, which will make it impossible to achieve...

Last reply: Farooq Saeed, Mar 25, 2024, 1:38 am

Can New Construction project use requirement of Warehouse and Distribution center to count point?

NC-v4 LTc4: Surrounding density and diverse uses
posted by Michael on Jan 10, 2023, 6:16 am

Hi LEED expert, my project is a manufacturing plant with a warehouse. The warehouse accounts for 46% of the total GFA. The project will be registered under New Construction. For this credit...

Last reply: Dave Hubka, Mar 13, 2024, 10:03 pm

Building will be used by the client, not be leased to 3rd party. need of "tenant design & construction guidelines document"?

CS-2009 SSc9: Tenant Design and Construction Guidelines
posted by prudhvi mahadev on Feb 7, 2018, 1:03 am

hello,

im pursuing a project which is going with the rating LEED 2009 C&S. i have a question, in my case the owner himself will use the space for his own purpose and will not be leased...

Last reply: , Mar 5, 2024, 7:24 am

What is the Exact Definition of A Trip?

NC-v4 LTc5: Access to quality transit
posted by Krithikha Muthukrishnan on Nov 16, 2017, 5:19 am

I am posting this question largely because the credit langauage is not very clear(maybe language nativity issues here). In the Reference Guide, "A Trip" is defined as follows-

A trip...

Last reply: Shadi Abousamra, Mar 4, 2024, 9:29 am

How can I register a Resort Project with multiple distinct physical structures with one exceeding 25000 Sq.ft.? Description: I u

Hospitality-NC-v4 MPR2: Must use reasonable LEED boundaries
posted by Manzil Shrestha on Feb 18, 2024, 10:50 am

How can I register a Resort Project with multiple distinct physical structures with one exceeding 25000 Sq.ft.?
Description: I understand that Resort projects with multiple...

Allignment with WELL Preconditions?

Pilot-Credits EQpc105: Lead Risk Reduction
posted by Sheena Moses on Jul 26, 2023, 11:01 pm

We have attempted this credit for our office project based as we find that the requirements of 3 separate WELL preconditions and 1 optiimzation are well aligned with the requirements of this...

Last reply: Thomas Lagarde, Feb 13, 2024, 11:25 am

Projects with several distinct structures

Hospitality-NC-v4 MPR3: Must comply with project size requirements
posted by Manzil Shrestha on Feb 13, 2024, 5:07 am

"Any single...

FEES FOR BASEMENT AREA

LEED v4.1 Discussion Forum
posted by Subrota Roy on Feb 6, 2024, 4:21 am

 Is it necessary to calculate the basement area when we calculate the...

Multilevel lighting control

NC-v4.1 EQc6: Interior lighting
posted by Michael on Jun 26, 2022, 11:55 pm

I have 10 lighting fixtures in an office space, and the architect is providing 3 on-off switches:

- switch 1, on-off 5 lightings (50% of lighting numbers)

- switch 2, on-off 2...

Last reply: Karen Joslin, Dec 18, 2023, 12:51 pm