Forum » Asia – South and Southeast
Topic

Minimum Requirement for Bicycle Facilities Credit

NC-v4 LTc6: Bicycle facilities
posted by Nuttanee Vongveeranonchai on Aug 25, 2020, 7:30 am

Dear All, 

I have a question regarding the minimum requirement of the Bicycle facilities credit. Our project is a conference center located in the center of Bangkok, Thailand....

VOC content requirements for wet-applied products

NC-v4 EQc2: Low emitting materials
posted by CINDY CHAI on Jul 7, 2020, 10:26 pm

Hi All! Appreciate if someone can help with the following.

The reference guide states that for projects outside the U.S., all paints, coatings, adhesives, and...

Last reply: Reinhard Oppl, Aug 24, 2020, 10:40 am

Indoor Water Usage Prerequisite Requirements

CI-v4 WEp1: Indoor water use reduction
posted by rakesh bhatia on Aug 12, 2020, 3:41 am

In the reference guide of LEED ID+C V4,  it is mentioned under prerequisite  the newly installed plumbing fixtures must be according to the Table 6 flow rates. The % savings must be shown for...

need of two excel file to show daylight compliance?

NC-v4 EQc7: Daylight
posted by Alwin Jino on Aug 19, 2020, 6:59 am

As per Version 4.1, IEQ Credit-Daylight: Options 2, Illuminance calculations. 

it is asked to perform daylight simulation for 9 a.m and 3 p.m on a clear-sky day at the equinox. should we...

Automatic Daylighting Controls for Primary Sidelighted Areas in Core and Shell project

CS-v4 EAp2: Minimum Energy Performance
posted by Tien Duong on Aug 10, 2020, 6:58 am

Dear All,

According to ASHRAE 90.1 section 9.4 mandatory requirement, the primary sidelighted area shall be separately controlled by at least one multilevel photocontrol, but in CS project...

Last reply: Norbert Szircsak, Aug 10, 2020, 9:03 am

How to draw the 11 degree line to calculate unobstructed view

Healthcare-v2009 IEQc8.2: Daylight and views - views
posted by P Hariharan on Apr 26, 2016, 1:29 am

as possible.. Log in or register to post comments Rouba Nassar EcoConsulting LEEDuser Basic Member 871 thumbs up May 3, 2016- 8:45 am Please provide me with email, as it is not possible on forum, Thanks Log...

Last reply: , Aug 5, 2020, 3:42 pm

Automatic daylight responsive controls for sidelighting AHSRAE 90.1

NC-v4 EAp2: Minimum Energy Performance
posted by Tien Duong on Jul 29, 2020, 5:32 am

Hi All,

In term of mandatory of ASHRAE 90.1, The lighting in the sidelighting must use photocontrols to change the general lighting level in the primary sidelighted area to reduce the...

Last reply: Tien Duong, Jul 29, 2020, 6:54 pm

Project Boundaries- Different Certifications, Different Towers, But Common Retail Podium & Basement

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by ARDOR GREEN on Jul 27, 2020, 2:17 pm

Given the number of questions already posed on project boundaries, I hesitate to post this, but I'm still stumped. 

Our projects has 3 towers (1 hotel/residential at 88 floors, 1 office at...

Last reply: Tristan Roberts, Jul 28, 2020, 2:14 pm

Unbundling Documentation

NC-v4.1 LTc7: Reduced parking footprint
posted by Rodolfo Loro, Jr. on Mar 27, 2020, 2:35 am

Hello. I would like to ask what kind of documentation usually reflects a project's implementation of daily parking fee? is this similar to a Lease Agreement? Or House rules? What if the...

Last reply: Kelsey Wotila, Jul 27, 2020, 12:46 pm

How to identify nonattainment areas for projects outside of the US/Canada?

NC-v4 EQp1: Minimum indoor air quality performance
posted by Guillaume FABRE on Jul 21, 2020, 2:00 am

Hi all, I am pretty clear about the definition of nonattainment area given in ASHRAE 62. This being said, how to identify nonattainment areas for projects outside of the US/Canada? Are you aware...