Reduced parking footprint attempted for CampusNC-v4 LTc7: Reduced parking footprintposted by Pham Kim Ngan on Nov 20, 2024, 4:28 am
Hi everyone, We have decided to classify our project as a campus project. The new building is part of Phase 2 of our development and will be constructed on land that has already been... |
|
Standard for the baseline of the cold storage in a factoryNC-v4.1 EAp2: Minimum Energy Performanceposted by Michael on Sep 11, 2022, 1:40 pm
My factory project has cold storage (10oC) and a freezer (-13oC). For the factory, we use ASHRAE 90.1-2016 as normal but for the cold storage and freezer, what is the standard to set up the... Last reply: Marcus Sheffer, Sep 12, 2024, 1:49 pm |
|
How to determine Fan EFLH (Equivalent Full Load Hours)NC-v4 EAp2: Minimum Energy Performanceposted by Michael on Aug 8, 2024, 3:24 am
Hi LEED experts, In the MEPC file, I see the Fan EFLH is determined by dividing the annual fan consumption by the total fan power (kW) in the tab "Performance Output". Based on the MEPC... Last reply: Tyler Thumma, Sep 5, 2024, 8:09 am |
|
Indoor Water Use ReductionCS-v4 WEp2: Indoor water use reductionposted by Hung Nguyen An on Mar 22, 2021, 5:17 am
Dear everyone, Do you know to determine the... Last reply: emily reese moody, Sep 2, 2024, 4:03 pm |
|
Can MEP CxA be more than 1 person?NC-v4 EAc1: Enhanced Commissioningposted by Michael on Aug 14, 2024, 3:28 am
Hi LEED Experts, I would like to ask: Is it a must to have only 1 key... Last reply: Dave Hubka, Aug 14, 2024, 8:08 am |
|
Demonstrate Rice Husk to meet Green-e renewable Fuel RequirementsNC-v4.1 EAc5: Renewable energyposted by Michael on Jul 15, 2024, 7:32 am
Hi LEED experts, My project is a factory, using boilers with rice husk on-site. I received LEED review comments: if the Biomass is to be claimed as... Last reply: Marcus Sheffer, Aug 8, 2024, 8:48 am |
|
Can New Construction project use requirement of Warehouse and Distribution center to count point?NC-v4 LTc4: Surrounding density and diverse usesposted by Michael on Jan 10, 2023, 6:16 am
Hi LEED expert, my project is a manufacturing plant with a warehouse. The warehouse accounts for 46% of the total GFA. The project will be registered under New Construction. For this credit... Last reply: Ayda Sahaf, Apr 30, 2024, 6:23 am |
|
Modeling only conditioned areaNC-v4 EAp2: Minimum Energy Performanceposted by Omar Elrawy on Dec 9, 2020, 10:05 pm
I'm certifying a huge factory with an attached office building. Is it possible to model only the office area? Last reply: Abdullah Tahir, Mar 25, 2024, 1:38 am |
|
Multilevel lighting controlNC-v4.1 EQc6: Interior lightingposted by Michael on Jun 26, 2022, 11:55 pm
I have 10 lighting fixtures in an office space, and the architect is providing 3 on-off switches: - switch 1, on-off 5 lightings (50% of lighting numbers) - switch 2, on-off 2... Last reply: Karen Joslin, Dec 18, 2023, 12:51 pm |
|
Systems Unable to Meet Required Outdoor Airflow RatesEBOM-v4.1 EQp1: Minimum Indoor Air Qualityposted by Dang Thi on May 20, 2020, 12:23 am
I have a question, compare to LEED v4... Last reply: Gustavo De las Heras Izquierdo, Sep 28, 2023, 10:51 am |