Log in
Forum
Loading...
Topic

Laundry "room" now included in cross contamination?

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Karen Joslin on Aug 23, 2018, 5:09 pm

Perhaps I missed this was snuck in for v4, but what part of laundry makes it now added to the rooms needing exhaust, supply, and negative pressure? Is it possible this could be interpreted the...

Last reply: Maria Porter, Jun 18, 2019, 4:49 am

Total Building Energy Use

EBOM-v4.1 EAc1: Energy Performance
posted by Ben McEwen on Jun 13, 2019, 3:50 pm

to the forum.  Log in or register to post comments ...

Last reply: David Hubka, Jun 17, 2019, 11:01 pm

ASHRAE Level 1 Energy Audit

EBOM-v4.1 EAp1: Energy Efficiency Best Management Practices
posted by Ben McEwen on Jun 13, 2019, 2:48 pm

Regarding the Energy Audit Prerequisite, is there an acceptable age range for a pre-existing energy Audit that was conducted on the building in question? If there was a Level 1 Energy Audit...

Last reply: David Hubka, Jun 17, 2019, 10:41 pm

CASRN Numbers Not Specific Enough

NC-v4 MRc4: Building product disclosure and optimization - material ingredients
posted by Nathan Gauthier on Jun 17, 2019, 2:42 pm

We've gotten a response from reviewers that HPDs we've submitted "do not include compliant lists of materials ingredients" and then they call out CASRN 65997-19-5, which is steel in our USG...

Last reply: Tristan Roberts, Jun 17, 2019, 5:16 pm

High Pressure Laminate Category in Low-Emitting Materials

CI-v4 EQc2: Low emitting materials
posted by Diana Smiciklas on Jun 17, 2019, 4:13 pm

Hello there,

When specifying an HPL, do I categorize it as composite...

CI-v4.1 BPDO- Environmental Product Declarations and Material Ingredients

CI-v4.1 MRc5: Building product disclosure and optimization - material ingredients
posted by Wayne Mc Fall on Jun 17, 2019, 7:30 am

Hi,

I'm looking for some assistance in relation to the materials credits, namely:

1. Environmental Product Declarations

2. Material Ingredients

Quoted from the...

Last reply: David Hubka, Jun 17, 2019, 1:38 pm

LEED v4.1

CI-v4.1 IPc1: Integrative process
posted by Mohamed Hassan on Jun 16, 2019, 1:09 pm

Are the (REFERENCE GUIDE FOR INTERIOR DESIGN AND CONSTRUCTION v4.1) are Available in store?

what is the last date to subscribe project on Version v4 ?and last date to be certificated AP on...

Last reply: David Hubka, Jun 17, 2019, 1:34 pm

Recommened software for doing the Interior and Daylighting analyses.

NC-v4 EQc7: Daylight
posted by Jorng-ren Chern on Apr 10, 2018, 2:05 am

We’re in search for a suitable software to do the Interior and daylighting analyses for LEED V4. I asked LEED coach and they said the to do the LEED...

Last reply: Reshadee Weerasooriya, Jun 16, 2019, 11:35 pm

Invoices submission for final review

NC-2009 MRc7: Certified Wood
posted by Mohamed Hanifa on Jun 13, 2019, 8:10 am

Dear Sir,

I have received the invoice details from the supplier and it consists of cost,...

Last reply: Terry Campbell, Jun 16, 2019, 11:06 am

Wall Components

NC-v4 EQc2: Low emitting materials
posted by LUCY WILLIAMS on Jun 15, 2017, 10:15 am

When reporting for the wall, ceiling category under Option 1, do all of the interior partition components need to be complaint- the gypsum board, the tape, the joint compound, the studs and the...

Last reply: Teresa Stern, Jun 14, 2019, 5:58 pm