Indoor Water Use ACP
EBOM-v4.1 WEc1:Water Performanceposted by Rocio Salazar on
We are currently working on a retail project that has recently implemented improvements to its plumbing fixtures, and we are pursuing the Indoor Water Use ACP pilot credit.
Warehouse ventilation filtration system
Warehouses-NC-v4 EQp1:Minimum indoor air quality performanceposted by Gabriela Mena on
I am working on a warehouse project that has supply fans (wall mounted) to ventilate the space, we are pursuing the Enhanced IAQ credit <<Interior Cross Contamination Prevention>>, this
Minimun rate ventilation for enclosed parking with contaminant sensors
CS-2009 IEQp1:Minimum IAQ Performanceposted by Hendrick Munoz on
Goord morning,
Enclosed Parking Garage Ventilation
CS-2009 EAp2:Minimum Energy Performanceposted by Gabriela Mena on
Hi,
Gross floor area modification
CS-2009 PIf2:Project Summary Detailsposted by Silvia Ruiz on
Hi If a project size is modified (the gross floor area) after the preliminary review, besides of the credits that have been attempted what other consequences do I have to consider? Thanks
Project size increase
CS-2009 IEQp1:Minimum IAQ Performanceposted by Silvia Ruiz on
Dear all In a project that we are certificating LEED C&S v3 the owner has modified the OPRs, specificly the project size and the MEP system. 1.
Meeting room ID+C: CI certification
CI-v4 MPR3:Must comply with project size requirementsposted by Silvia Ruiz on
Hi A client asked us if they can earn a LEED ID+C: CI certification for a 968 sqft meeting room renewal.
Can roofed areas be considered open space?
CS-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Alejandro Rivera on
Our project is a mixed-used building in an urban area that will most probably earn SSc2.