Indoor Water Use ACP

EBOM-v4.1 WEc1:Water Performance
posted by  Rocio Salazar  on 

We are currently working on a retail project that has recently implemented improvements to its plumbing fixtures, and we are pursuing the Indoor Water Use ACP pilot credit.

0

Warehouse ventilation filtration system

Warehouses-NC-v4 EQp1:Minimum indoor air quality performance
posted by  Gabriela Mena   on 

I am working on a warehouse project that has supply fans (wall mounted) to ventilate the space, we are pursuing the Enhanced IAQ credit <<Interior Cross Contamination Prevention>>, this

4
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Sun Mar 12, 2023, 4:12 am

Gross floor area modification

CS-2009 PIf2:Project Summary Details
posted by  Silvia Ruiz  on 

Hi If a project size is modified (the gross floor area) after the preliminary review, besides of the credits that have been attempted what other consequences do I have to consider? Thanks

4
Managing Partner
Ecoimpact Consulting
LEEDuser Expert
171 thumbs up
Tue May 5, 2020, 4:59 pm

Project size increase

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Silvia Ruiz  on 

Dear all In a project that we are certificating LEED C&S v3 the owner has modified the OPRs, specificly the project size and the MEP system. 1.

1
Sat Aug 26, 2017, 4:08 pm

Meeting room ID+C: CI certification

CI-v4 MPR3:Must comply with project size requirements
posted by  Silvia Ruiz  on 

Hi A client asked us if they can earn a LEED ID+C: CI certification for a 968 sqft meeting room renewal.

1
Thu Apr 6, 2017, 5:23 pm

Can roofed areas be considered open space?

CS-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Alejandro Rivera  on 

Our project is a mixed-used building in an urban area that will most probably earn SSc2.