Forum quick links
Will RECs from TIGR fulfill the credit requirement for EAc4 LEED CI v2009 ?
CI-2009 EAc4:Green Powerposted by Rowena Rawte on
For a project in Singapore the client are planning on purchasing Green RECs from TIGR.
Reasonable assumption for plenum ceiling
EBOM-v4.1 EQp1:Minimum Indoor Air Qualityposted by Omar Elrawy on
We have old existing office building where ducted FCU is serving all the spaces.
Change of space during performance period
EBOM-v4.1 EQp1:Minimum Indoor Air Qualityposted by Pulak Goyal on
I have a building going for LEED O+M v4.1 Existing Buildings Certification.
Big project site = more than 400m walking distance to nearest bus stop, but there is a shuttle service within the property.
NC-v4 LTc5:Access to quality transitposted by Zirjay Villanueva on
We're working on a project with a big project site, and the nearest bus stop is more than 400m walking distance from some of the buildings.
Manufacturing energy and water consumption
EBOM-v4.1 EAp3:Energy Performanceposted by Salomee Hinque on
Dear all,
Where to find Evapotranspiration Rates of a location?
NC-v4 WEc1:Outdoor water use reductionposted by Zirjay Villanueva on
In the v4_Outdoor Water Use Reduction Calculator, there is a tab where you need to key in the Monthly Rainfall and Evaportranspiration Rate (ETo) for the location of the project.
LEED 4.1 NC Energy and Atmosphere
NC-v4.1 EAc5:Renewable Energyposted by Britt Valdez on
Hi, related to LEED 4.1 NC Energy and Atmosphere requirements: When purchasing Renewable Energy Credits (RECs) and/or carbon offsets, there is a one-year term option and a fifteen-year term option.
Floor markings/signage on grass cells
NC-v4 LTc8:Green vehiclesposted by Zirjay Villanueva on
Non-continuous floors
CI-v4 MPR2:Must use reasonable LEED boundariesposted by David Edenburn on
I have seen this question asked but not answered. We have a client who will renovate three floors of an office building; typical CI project. The issue is that they will do floors 7, 17, 18.