Forum » Asia – South and Southeast
Topic

Standard for the baseline of the cold storage in a factory

NC-v4.1 EAp2: Minimum Energy Performance
posted by Michael on Sep 11, 2022, 1:40 pm

My factory project has cold storage (10oC) and a freezer (-13oC). For the factory, we use ASHRAE 90.1-2016 as normal but for the cold storage and freezer, what is the standard to set up the...

Last reply: Marcus Sheffer, Sep 12, 2024, 1:49 pm

How to determine Fan EFLH (Equivalent Full Load Hours)

NC-v4 EAp2: Minimum Energy Performance
posted by Michael on Aug 8, 2024, 3:24 am

Hi LEED experts,

In the MEPC file, I see the Fan EFLH is determined by dividing the annual fan consumption by the total fan power (kW) in the tab "Performance Output". Based on the MEPC...

Last reply: Tyler Thumma, Sep 5, 2024, 8:09 am

Indoor Water Use Reduction

CS-v4 WEp2: Indoor water use reduction
posted by Hung Nguyen An on Mar 22, 2021, 5:17 am

Dear everyone,

Do you know to determine the...

Last reply: emily reese moody, Sep 2, 2024, 4:03 pm

Can MEP CxA be more than 1 person?

NC-v4 EAc1: Enhanced Commissioning
posted by Michael on Aug 14, 2024, 3:28 am

Hi LEED Experts, I would like to ask: Is it a must to have only 1 key...

Last reply: Dave Hubka, Aug 14, 2024, 8:08 am

TUV PROFiCERT acceptable for VOC emission?

NC-v4.1 EQc2: Low-emitting materials
posted by sompoche sirichote on Jun 13, 2023, 5:08 am

Hi, 

Could anyone help confirm if LEED consider products with TUV PROFiCERT-product Interior / Interior PREMIUM mark meeting v4.1...

Last reply: Harry James201, Aug 12, 2024, 6:17 am

Demonstrate Rice Husk to meet Green-e renewable Fuel Requirements

NC-v4.1 EAc5: Renewable energy
posted by Michael on Jul 15, 2024, 7:32 am

Hi LEED experts,

My project is a factory, using boilers with rice husk on-site. I received LEED review comments: if the Biomass is to be claimed as...

Last reply: Marcus Sheffer, Aug 8, 2024, 8:48 am

Composite wood- Compliance with CARB ATCM or TSCA Title VI is not enough?

NC-v4.1 EQc2: Low-emitting materials
posted by Michael on Jul 8, 2024, 1:08 am

Hi LEED experts,

My project used composite...

Last reply: Kristi Ennis, Jul 29, 2024, 5:16 pm

Unable to attach documents to LEED Offline Form

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Grace Cheong on Jul 28, 2024, 11:41 pm

Hi, seems that we are unable to attach supporting documents to the LEED offline form.

is there any alternative solution? Thanks!

Rehab Center- LEED adaptation for completed buildings

LEED Rating System Selection
posted by Junaid Khan on Jul 18, 2024, 3:13 am

Hi,

I'm currently working on a project in Islamabad, Pakistan. Its a rehabilitation center that is entirely completed and will be operational within this month. The client has decided at...

EKOenergy label is not fully equivalent to Green-e certification?

CI-v4.1 EAc4: Renewable energy
posted by Michael on Jul 8, 2024, 5:32 am

Hi LEED Experts,

My project in Malaysia and we purchased...

Last reply: Marcus Sheffer, Jul 8, 2024, 9:30 am