Topic | Recent |
---|---|
Rehab Center- LEED adaptation for completed buildingsLEED Rating System Selectionposted by Junaid Khan on Jul 18, 2024, 3:13 am
Hi, I'm currently working on a project in Islamabad, Pakistan. Its a rehabilitation center that is entirely completed and will be operational within this month. The client has decided at... |
|
Energy Modeling using “HAP”NC-2009 EAp2: Minimum Energy Performanceposted by Muzamil Rafique on May 27, 2016, 2:50 am
I am doing the energy model for a project. The project total area is “153,145 sf”, 25,346 sf area of the total area is condition and the other “127,799” sf area is unconditioned, “ventilation fan... Last reply: Marcus Sheffer, Mar 26, 2024, 7:46 pm |
|
Industrial NormalizationEBOM-v4 EAp2: Minimum Energy Performanceposted by Muzammal Abbas LEED AP (BD+C) on Aug 5, 2016, 4:53 am
I am working on industrial project and below is the leed reviewer comments that is confusing for me how to deal with it and how to normalize to resole these issues ? The end-use breakdown... Last reply: Dave Hubka, Sep 24, 2023, 1:11 pm |
|
Meeting prerequisite requirements using only split systemsRetail-NC-v4 EAp2: Minimum Energy Performanceposted by Muhammad Asaad Iftikhar on Feb 19, 2021, 5:38 am
Greetings! The retail building pursuing LEED certification wants to use inverter type split ACs for their heating/cooling. eQuest allows us to model air cooled DX direct air path split... Last reply: Marcus Sheffer, Mar 2, 2021, 2:00 pm |
|
LEED Pakistan-- Availability and detailsLEED Rating System Selectionposted by Hassaan Sipra on Oct 11, 2015, 9:35 pm
I am interested in finding out if LEED has guidelines for Pakistan, specifically Islamabad, as I am doing a project for one of my master's courses in Green Buildings in that area. The project... Last reply: shamim uddin, Nov 27, 2018, 1:03 pm |
|
Data Uploading IssueNC-v4 EAp2: Minimum Energy Performanceposted by Muzammal Abbas LEED AP (BD+C) on Sep 10, 2018, 1:39 am
Hi, We are facing a problem in uploading narrative, actually in the response of Last reply: Marcus Sheffer, Sep 10, 2018, 10:29 am |
|
Credit to appealNC-v4 EAp2: Minimum Energy Performanceposted by Muzammal Abbas LEED AP (BD+C) on Aug 31, 2018, 3:11 am
Hi, Last reply: Robyn Dowsey, Aug 31, 2018, 6:59 am |
|
NC-v4 EQc1- Enhanced indoor air quality strategiesNC-v4 EQc1: Enhanced indoor air quality strategiesposted by SAJJAD MALIK on Dec 15, 2017, 1:40 am
Dear All, Can we achieve the enhance indoor air quality strategies point by using 100% fresh air unit without using filtration media in large working halls. please reply me as soon... Last reply: Ben Stanley, Jan 15, 2018, 4:53 pm |
|
enhance indoor air quality strategiesNC-v4 EQc1: Enhanced indoor air quality strategiesposted by SAJJAD MALIK on Dec 14, 2017, 7:02 am
Dear All, Can we achieve the enhance indoor air quality strategies point by using 100% fresh air unit without using filtration media in large working halls. please reply me... Last reply: Ben Stanley, Jan 15, 2018, 3:51 pm |
|
Software's for International UseNC-v4 MRc1: Building life-cycle impact reductionposted by Aqrab Ali Rana on Nov 7, 2016, 6:10 amyou mention your own product here on this forum, but we'd be most appreciative if you could be more inclusive in responses. Can you advise on whether other common software programs can be used... Last reply: Jennifer O'Connor, Sep 6, 2017, 12:21 pm |