Simulating Electrical System as back up for Solar Hot Water System

NC-2009 EAp2: Minimum Energy Performance
posted by Achelles DSouza on Nov 11, 2020, 4:22 am

I am simulating a hotel building. Domestic hot water requirement will be contributed by solar powered calorifier. Electric hot water system will be provided for back up. Is it fine if I neglect...

Last reply: Achelles DSouza, Nov 11, 2020, 10:59 pm

Indoor Water Usage Prerequisite Requirements

CI-v4 WEp1: Indoor water use reduction
posted by rakesh bhatia on Aug 12, 2020, 3:41 am

In the reference guide of LEED ID+C V4,  it is mentioned under prerequisite  the newly installed plumbing fixtures must be according to the Table 6 flow rates. The % savings must be shown for...

need of two excel file to show daylight compliance?

NC-v4 EQc7: Daylight
posted by Alwin Jino on Aug 19, 2020, 6:59 am

As per Version 4.1, IEQ Credit-Daylight: Options 2, Illuminance calculations. 

it is asked to perform daylight simulation for 9 a.m and 3 p.m on a clear-sky day at the equinox. should we...

How to draw the 11 degree line to calculate unobstructed view

Healthcare-v2009 IEQc8.2: Daylight and views - views
posted by P Hariharan on Apr 26, 2016, 1:29 am

as possible.. Log in or register to post comments Rouba Nassar EcoConsulting LEEDuser Basic Member 871 thumbs up May 3, 2016- 8:45 am Please provide me with email, as it is not possible on forum, Thanks Log...

Last reply: , Aug 5, 2020, 3:42 pm

Evaporative Cooling units

NC-v4 EAp2: Minimum Energy Performance
posted by sonali rajwade on Jun 7, 2020, 10:41 am

We are working on a Manufacturing Building project in India.  Direct evaporative cooling units (ECU) are used for cooling in certain spaces like office areas and a manufacturing area in the...

Last reply: sonali rajwade, Jun 15, 2020, 8:17 am

Minimum IAQ performance monitoring requirement

NC-v4 EQp1: Minimum indoor air quality performance
posted by sonali rajwade on Feb 22, 2019, 1:52 am

We are having query related to prerequisite requirement of monitoring in LEED BD+C V4. 

We are planning to install 'Direct Evaporative cooling system' with HVLS (high volume low speed)...

Last reply: Dang Thi, Jun 8, 2020, 9:25 pm

Sample documents for this credit

CI-v4 EQc5: Thermal comfort
posted by nasrin belim on Apr 25, 2020, 2:24 am

Hi LEED User

Please if available than share the sample documentation or chart for CIv4-EQc5 Thermal Comfort

thanks 

Last reply: Karen Joslin, Apr 28, 2020, 1:30 am

LEED EB v4.1- Data Centers

EBOM-v4.1 EAc1: Energy Performance
posted by Vanni arasan on Mar 23, 2020, 11:24 am

I am working on LEED v4.1 EB O&M Datacenter rating system, I haven't getting Energy Performance score.  Please advise how to enter the energy data i.e., Whole Facility Energy Consumption...

Leed ap in innovation credit

NC-v4 INc2: LEED Accredited Professional
posted by Vidya Thota on Feb 8, 2018, 10:37 pm

What are the roles of leed ap in the project?

Last reply: David Hubka, Mar 18, 2020, 11:49 am

Enhanced Commissioning V4

NC-v4 EAc1: Enhanced Commissioning
posted by Prakash Sekar on Feb 1, 2020, 5:15 am

Can u share the sample submittal document for Enhanced Commissioning V4