I am doing the energy model for a project. The project total area is “153,145 sf”, 25,346 sf area of the total area is condition and the other “127,799” sf area is unconditioned, “ventilation fan and louvers” are using for unconditioned area.

Please comments on it.

1. How can I model the ventilation system in Baseline and in Proposed model?
2. HVAC Baseline system depend on only condition area or the total area of project?