I'm certifying a huge factory with an attached office building. Is it possible to model only the office area?
The factory is high on process loads, which will make it impossible to achieve the 5% prerequisite. 
Second question: Is it possible to claim savings on machineary load / consumption, which is our process load? 
Third question: Is it possible to claim savings for Mechanical Ventilation (which is still process load) by adding Direct Current Fans (so in such case DC fans get DC energy directly from the solar panels, without any inverter losses?