Forum » LEED v4.1 Discussion Forum
Topic

Integrative Process Facilitator

LEED v4.1 Discussion Forum
posted by Edward Reifenstein on Mar 9, 2023, 6:39 pm

Nadav Malin President BuildingGreen, Inc. LEEDuser Moderator 834 thumbs up March 9, 2023- 8:02 pm Hi Edward, USGBC isn't specific about this but, in my experience, the facilitator can be either a member of the design team or someone engaged specifically to facilitate this process. You might also want to repost this question to the LEEDuser forum for that specific credit and see what the people there have to say. Good luck! Log in or register to post comments Dave Hubka Practice Leader- Sustainability EUA LEEDuser Expert 396 thumbs up March 11, 2023- 10:53 pm It is my opinion that an experienced LEED...

Last reply: Dave Hubka, Mar 11, 2023, 10:53 pm

LED Wall washer calculation

LEED v4.1 Discussion Forum
posted by Martina Vázquez on Feb 1, 2023, 6:35 am

Good morning,

I've been studing LEED v4.1 document and it is almost all of it for streetlight projects, but we have a proposal based in wall-washer the exterior facade. I don't really know...

Living Building Challenge- Materials & LEED MR Credits

LEED v4.1 Discussion Forum
posted by Dane Andersen on May 5, 2021, 11:17 am

Does anyone know if there is "reciprocity", so to speak, between Living Building Challenge - Materials Petal and LEED MR and EQ credit documentation? I am working on a project pursuing LBC full...

Last reply: Renee Shirey, Jan 20, 2023, 11:07 am

Indoor Water Use Reduction

LEED v4.1 Discussion Forum
posted by on Jan 11, 2023, 6:24 pm

Hello all,

I have a project and want to use City provided purple pipe...

Indoor Air Quality

LEED v4.1 Discussion Forum
posted by Kathryn Loddengaard on Jan 3, 2023, 3:15 pm

The indoor Air quality guidelines have some very specfic analytical methods i.e EPA TO-17 for volatile organic compounds.  Must we follow these methods or can we use other EPA methods such as TO-...

Onsite Carbon Sequestration Through Plantings- Pilot credits- SSpc158

LEED v4.1 Discussion Forum
posted by Evan Constant on Nov 18, 2022, 5:39 pm

Option 1 for the Onsite Carbon Sequestration Through Plantings pilot credit requires showing the amount of CO2 sequestered...

v4.1 O+M: working with a new building

LEED v4.1 Discussion Forum
posted by Victoria Rios Esteve on Nov 17, 2022, 1:44 pm

Hi everyone, 

Hope you are well. We were requested to work on a LEED v4.1 O+M: Existing building certification. This building has 30yo. It has been under a major renovation. We wanted to...

Ozone Monitoring

LEED v4.1 Discussion Forum
posted by Sharon Bessa on Nov 17, 2022, 10:57 am

Is the Aeroqual OZL approved for ozone testing?

Certification for Lighting Products

LEED v4.1 Discussion Forum
posted by Sumbul Israil on Nov 17, 2022, 4:35 am

Hello,

The main issue is that we are a manufacturer of lighting products, and some of our customers do inquire about whether or not our products are LEED-certified. As I already know, LEED...

Last reply: Paula Melton, Nov 17, 2022, 8:56 am

What type space to place it on the ARC platform for a Casino?

LEED v4.1 Discussion Forum
posted by LEED Pro Consultant on Oct 31, 2022, 5:28 pm

hello everyone,

We are currently working on project O+M for existing buildings v4.1 for a casino in Mexico.

I have doubts about what type space to place it on the ARC platform, if...