Log in
Forum » Malaysia
Topic

Allignment with WELL Preconditions?

Pilot-Credits EQpc105: Lead Risk Reduction
posted by Sheena Moses on Jul 26, 2023, 11:01 pm

We have attempted this credit for our office project based as we find that the requirements of 3 separate WELL preconditions and 1 optiimzation are well aligned with the requirements of this...

Last reply: Thomas Lagarde, Feb 13, 2024, 11:25 am

Understanding Pilot-Credits IPpc101

Pilot-Credits IPpc101: Integrative process
posted by Fatimah Razak on Dec 16, 2023, 8:55 pm

Dear forum members,

I'm looking to gain a better understanding of Pilot-Credits IPpc101 and thought I'd reach out to this knowledgeable community. From what I've gathered, Pilot-Credits...

IPpc 101 Team journey throughout project submission

Pilot-Credits IPpc101: Integrative process
posted by Amal Ashraff on Feb 22, 2023, 9:34 pm

My team has successfully obtained this point in previous project submissions by demonstrating the effectiveness of communication channels among teammates. Throughout various discussion sessions,...

Light Pollution Reduction

EBOM-v4 SSc4: Light Pollution Reduction
posted by AMIR ZULKHAIRI AHMAD BANGI on Jan 10, 2023, 4:07 am

Hi All, can anyone explain the meaning of "the lamps are adequately shielded" in the Light Pollution Reduction Criteria?

Last reply: Bill Swanson, Jan 10, 2023, 4:20 pm

Pilot Credit

Pilot-Credits IPpc101: Integrative process
posted by AMIR ZULKHAIRI AHMAD BANGI on Sep 19, 2022, 1:22 am

As per the requirements of the pilot credit, we are noting our participation in this forum.

LEED O+M v4 Pilot Credit Participation

Pilot-Credits IPpc101: Integrative process
posted by AMIR ZULKHAIRI AHMAD BANGI on Sep 19, 2022, 4:36 am

Paula Melton Editorial Director BuildingGreen, Inc. LEEDuser Moderator 180 thumbs up September 19, 2022- 8:58 am Hi, Amir! I think the idea behind this requirement is that you say something about your experience with the credit to help others who may be pursuing it. I doubt "We are noting our participation in this forum" is going to count as participation. Log in or register to post comments ...

Last reply: Paula Melton, Sep 19, 2022, 8:58 am

Smoking Area at level 2

NC-v4 EQp2: Environmental tobacco smoke control
posted by Wah Wah on Jan 7, 2022, 4:36 am

Hello all, 

One of out project is pursuing LEED BD+C for new construction. The building has a open garden at level 2. Is it allowed for us to provide a designated smoking area there...

Last reply: Afogreen Build, Feb 17, 2022, 1:58 am

VOC content requirements for wet-applied products

NC-v4 EQc2: Low-emitting materials
posted by CINDY CHAI on Jul 7, 2020, 10:26 pm

Hi All! Appreciate if someone can help with the following.

The reference guide states that for projects outside the U.S., all paints, coatings, adhesives, and...

Last reply: Deborah Lucking, Nov 29, 2020, 9:52 am

Can amenities inside the project building be counted in the Surrounding Density and Diverse Uses credit?

NC-v4 LTc4: Surrounding density and diverse uses
posted by Chern Yue Ewe on Nov 4, 2020, 5:43 am

As per the subject, my project by nature is a semi-conductor manufacturing plant located in an industrial park with limited amenities located within 800meters of...

Last reply: emily reese moody, Nov 23, 2020, 1:54 pm

IEQ PreReq- Carbon monoxide monitoring

NC-v4 EQp1: Minimum indoor air quality performance
posted by Yun Kim Cheong on Oct 11, 2018, 1:59 am

The pre-requisite criteria speaks of having Carbon monoxide monitors installed in each dwelling unit. 

However, it is not common for dwelling units in Malaysia/Singapore to have such...

Last reply: Rodolfo Loro, Jr., Oct 15, 2020, 12:47 am