Beehives on rooftops – ID credit?CI-2009 IDc1: Innovation in Designposted by Maria Porter on Nov 29, 2011, 9:19 am
I think I have a great idea for an ID credit (maybe someone already has tried it). For my CI-project I want to have beehives on the (green) roof. Do you think that it would qualify as an ID... Last reply: Rachel David, Mar 14, 2023, 2:33 pm |
|
Modeling a District Energy PlantNC-2009 EAc1: Optimize Energy Performanceposted by Jason Files on Sep 23, 2010, 3:27 pm
Hi. We are applying for LEED certification for a building housing a Central Utility Plant (CUP) which supplies district energy to a hospital campus. I'm using Trane TRACE to model the CUP... Last reply: Cory Duggin, Mar 14, 2023, 11:47 am |
|
LPDNC-2009 EAp2: Minimum Energy Performanceposted by Leandro Silva on May 10, 2013, 2:05 pm
When calculating... Last reply: Cory Duggin, Mar 14, 2023, 10:40 am |
|
Core and Shell selection- QuestionLEED Rating System Selectionposted by Konstantina Kalliakoudi on Mar 13, 2023, 12:24 pm
Hello to all LEED users, I have a project which is a new construction of an Office building. The Owner will rent each floor to tenants. Each Floor will be designed as an Open... Last reply: Dave Hubka, Mar 14, 2023, 7:56 am |
|
Modeling Toilet exhaust fansNC-2009 EAp2: Minimum Energy Performanceposted by Matt Scott on Nov 5, 2013, 11:55 am
Let's say you have a proposed zone being conditioned by an RTU with only a supply fan and you also have a small exhaust fan exhausting air directly from a toilet room, and that's the extent of... Last reply: Julio Fernandez Amodia, Mar 14, 2023, 4:49 am |
|
Plug loads for server roomsNC-2009 EAp2: Minimum Energy Performanceposted by MARCIO OROFINO on Apr 22, 2015, 4:39 pm
Hi. Last reply: Jean Marais, Mar 14, 2023, 4:39 am |
|
Documentation for No Cooling TowerPilot-Credits WEpc94: No Cooling Towerposted by Marelle Davey on Feb 2, 2022, 6:37 pmIn addition to the Credit Specific documentation, you will need to provide proof that you participated in the LEEDuser forum, and completed the USGBC feedback survey. Log in or register to post comments... Last reply: Konstantina Kalliakoudi, Mar 14, 2023, 4:20 am |
|
Do we need to included tenant area in renewable energy calculation for CS building?CS-v4 EAc5: Renewable energy productionposted by Yoyo Shek on Feb 9, 2023, 10:45 pm
Dear All, We are doing a LEEDv4 CS project and I am not sure whether those tenant controlled areas such as shop and office are required to include in the calculation of %... Last reply: Marcus Sheffer, Mar 13, 2023, 3:35 pm |
|
Warehouse ventilation filtration systemWarehouses-NC-v4 EQp1: Minimum indoor air quality performanceposted by Gabriela Mena on Nov 24, 2020, 1:53 pm
I am working on a warehouse project that has supply fans (wall mounted) to ventilate the space, we are pursuing the Enhanced... Last reply: Dave Hubka, Mar 11, 2023, 11:12 pm |
|
Option F: If furniture is included...NC-v4 EQc6: Interior lightingposted by John Mlade on Mar 9, 2023, 3:14 pm
Hi all, Curious if it may be possible to consider furniture and pursue Option F if furniture is NOT included in other credit calculations. In our case, the building will be furnished by... Last reply: Dave Hubka, Mar 11, 2023, 11:04 pm |