Topic | Recent |
---|---|
Can I obtain the Access to Quality Transit in multiple buildings sharing a main controlled entrance?NC-v4.1 LTc5: Access to quality transitposted by Zabdi Valdez on Mar 14, 2023, 6:01 pm
I'm working with an industrial park with multiple buildings (5) individually certified which has two bus stops located within 1/4 mile of the main entrance and enough bus trips. The park has an... |
|
Plug loads for server roomsNC-2009 EAp2: Minimum Energy Performanceposted by MARCIO OROFINO on Apr 22, 2015, 4:39 pm
Hi. Last reply: Jean Marais, Mar 14, 2023, 4:39 am |
|
Hotel Resort- multiple blocks as a "single building"Hospitality-NC-v4 MPR3: Must comply with project size requirementsposted by ARES on Nov 25, 2022, 2:36 pm
Our project is a Hotel Resort, consisting of the main admin building, apartment blocks, individual villas, spa blocks, utility blocks, restaurants, multipurpose buildings, etc. According... Last reply: steven Leonardo, Nov 26, 2022, 5:49 am |
|
Recycling rate of construction and demolition wasteCS-v4 MRc5: Construction and demolition waste managementposted by Tiago Rigobello on Nov 4, 2022, 5:08 pm
How can we prove the recycling rate of construction and demolition waste made by the recycler? What are the options in Brazil? Thanks! Best regards! |
|
Bird collisions/Interference in the migratory routeCS-v4 INc1: Innovationposted by Ricardo Gomes on Mar 8, 2021, 8:34 pm
I’m curious if there is a pattern flight height for migratory birds. Our project is close to a large road network, with a lot of green area and along a flight corridor, landing, resting, feeding... Last reply: Celeste Ceballos, Aug 22, 2022, 7:11 pm |
|
Tier 1: On-site renewable energy generation- excluded from LEED BoundaryNC-v4.1 EAc5: Renewable energyposted by ARES on May 17, 2022, 10:55 amMarcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5738 thumbs up May 17, 2022- 11:47 am Technically it is Tier 2. Wondering if there is a creative way to draw the project boundary to include it however? That is a question for a different forum I suppose. Log in or register to post comments ... Last reply: Marcus Sheffer, May 17, 2022, 11:47 am |
|
WEp2- add shower to awarded creditNC-v4 WEp2: Indoor water use reductionposted by ARES on Mar 29, 2022, 4:45 pm
During the Design Review, we have submitted the LT pre-requisite/credit Indoor Water Use Reduction and we have earned a total of 6 points. We are now going to submit the Construction Phase and we... Last reply: emily reese moody, May 13, 2022, 6:45 pm |
|
LTc5- Access to Quality Transit- Awarded Credit- obtain more pointsNC-v4.1 LTc5: Access to quality transitposted by ARES on Mar 29, 2022, 4:16 pm
During the Design Review, we have submitted the LT credit Access to quality transit, and we have earned 4 out of 5 points (LEED v4.1). However, during the Construction Phase, we detected an... |
|
Manual controls- remote control deviceNC-v4 EQc6: Interior lightingposted by ARES on Feb 24, 2022, 8:04 am
The EQ credit Interior Lighting – Option 1 - Lighting Control states that “switches or manual controls must be located in the same space as the controlled luminaires. A person operating the... Last reply: Dave Hubka, Feb 25, 2022, 8:15 am |
|
Green-e energy certificate accounted for in EA credit- v4 x v4.1NC-v4 EAc2: Optimize Energy Performanceposted by ARES on Feb 24, 2022, 11:45 am
Our project is registered under the LEED v4, but we have substituted the EAc5 and EAc7 with the EA credit Renewable Energy from LEED v4.1, we intend to use the Tier 2 and purchase... Last reply: Marcus Sheffer, Feb 24, 2022, 6:20 pm |