Topic | Recent |
---|---|
INpc136- Safety First: Re-Enter Your WorkspacePilot-Credits INpc136: Safety First: Re-Enter Your Workspaceposted by Kelvin Chan on Oct 24, 2022, 12:31 am
Our project is located in Hong Kong. We found that information under the feature SE3 of WELL Health-Safety Rating can also be referred for this credit. The project which has already... Last reply: Alexis Voeltner, May 16, 2023, 2:58 pm |
|
IARW/IACSC Energy Modeling Guideline for Cold StorageCS-v4 EAp2: Minimum Energy Performanceposted by Seungmin Kim on Apr 21, 2022, 9:09 pm
Hello According to LEED INTERPRETATION #10424, under the Exceptional Calculation... Last reply: Eric Kim, Apr 25, 2023, 3:51 am |
|
IPc101- Integrative Process- good practicePilot-Credits IPpc101: Integrative processposted by Kelvin Chan on Apr 2, 2023, 3:13 am
It is recommended to set up an integrative team with all stakeholders at the early stage, prior to commencement of the project, the team shall establish an Integrative Process (IP) Team. The IP... |
|
Has anyone used Grasshopper for energy simulation and successfully submitted for LEED certification?CS-v4 EAp2: Minimum Energy Performanceposted by James Cai on Mar 12, 2023, 1:45 amLast reply: Tyler Thumma, Mar 16, 2023, 9:28 am |
|
Do we need to included tenant area in renewable energy calculation for CS building?CS-v4 EAc5: Renewable energy productionposted by Yoyo Shek on Feb 9, 2023, 10:45 pm
Dear All, We are doing a LEEDv4 CS project and I am not sure whether those tenant controlled areas such as shop and office are required to include in the calculation of %... Last reply: Marcus Sheffer, Mar 13, 2023, 3:35 pm |
|
RE: v.4 Core & Shell- RECs as Offsite PowerCS-v4 EAc5: Renewable energy productionposted by Yoyo Shek on Feb 9, 2023, 11:06 pm
Hi LEED user, We have a C&S project includes retail and office towers with limited space for renewable power generation. The utilities company in the area has just launched... Last reply: Marcus Sheffer, Feb 10, 2023, 3:43 pm |
|
LEED O+M v4 Pilot Credit Integrative Process- Participation in the ForumPilot-Credits IPpc101: Integrative processposted by Yanjun Xing on Dec 22, 2022, 4:15 am
Our project is pursuing LEED O+M plantinum certification, during the whole O&M period, we establish an integrative process team to improve our work efficiency. According to the owner’s... |
|
Calculating the surrounding densityCI-v4 LTc2: Surrounding density and diverse usesposted by Yee Ting Wong on Nov 22, 2017, 11:14 pmSonali Rawat Sustainability Consultant Jacobs LEEDuser Premium Member December 13, 2022- 11:42 pm Hi, what tools do you use for density mapping for a city? Log in or register to post comments Emily Purcell Sustainable Design Lead CannonDesign LEEDuser Expert 271 thumbs up December 14, 2022- 11:17 am Hi Sonali, there is a thread in the NC forum with a lot of folks sharing tools, see here: https://leeduser.buildinggreen.com/forum/option-1-documentation-0 Log in or register to post comments ... Last reply: Emily Purcell, Dec 14, 2022, 11:17 am |
|
Cx scope for ventilation, air conditioners of the base buildingCI-v4 EAp1: Fundamental commissioning and verificationposted by Michael on Nov 14, 2022, 6:15 am
My store project is located inside a big department store in Japan. All HVAC system in my project is controlled by the landlord of the... |
|
LEED O+M v4 Pilot Credit ParticipationPilot-Credits IPpc101: Integrative processposted by Kelvin Chan on Oct 23, 2022, 11:53 pm
As per the requirements of the pilot credit, we are noting our participation in this forum. Our project is located in Hong Kong. I sugguested to sep up an IP team inclueds owner,... |