Log in
Forum
Topic

How to model multiple buildings served by a common chiller plant?

NC-v4 EAp2: Minimum Energy Performance
posted by Raheel Mujtaba on Sep 19, 2024, 12:48 pm

There are multiple blocks undergoing the LEEDv4 campus certification on a site. 3 separate buildings in that campus are served by the common chiller plant located within the campus but as a...

Last reply: Marcus Sheffer, Sep 26, 2024, 11:53 am

Laboratory Spaces baseline system in warm climate and proposed building is electrified heating

NC-v4.1 EAp2: Minimum Energy Performance
posted by Russell Knudson on Sep 17, 2024, 5:08 pm

For a project within warm Climate Zones 0 to 3A, and that has a "metal shop" space that requires more than 15,000 CFM, is it a correct reading that the baseline system serving those spaces shall...

Last reply: Marcus Sheffer, Sep 26, 2024, 11:51 am

Credit for unregulated loads

CI-v4 EAp2: Minimum Energy Performance
posted by Jeremy L. on Sep 25, 2017, 1:43 pm

The credit states that we can "use the COMNET modeling guidelines and procedures to document measures that reduce unregulated loads". In early June, I found the guidelines on COMNET's website in...

Last reply: Marcus Sheffer, Sep 26, 2024, 11:36 am

ASHRAE 90.1 Europe ACP

NC-v4 EAp2: Minimum Energy Performance
posted by Ricardo Sá on Sep 24, 2024, 12:12 pm

Dear All,

According to LEED EAp2 Guidance (Reference Guide, Further Explanation), “Europe ACP for ASHRAE 90.1 Mandatory Provisions table (attached) provides further guidance for...

Last reply: Marcus Sheffer, Sep 26, 2024, 11:34 am

Airport expansion and Project boundary

NC-v4.1 MPR2: Must use reasonable LEED boundaries
posted by Filippo Weber on Sep 26, 2024, 7:12 am

Hello,

I'm facing a though issues in establihing the corret LPB of a project and I hope you can give me some help. The project is the expansion of an existing airport and it includes:...

Getting total material cost for the project

NC-2009 MRc4: Recycled Content
posted by Mike Stopka on Jul 9, 2015, 12:55 pm

Hello

I am having a lot of trouble getting a total material cost from the contractor. Is there any good/easy/quick strategy to get this number? How is this typically calculated by the...

Last reply: Faran Arshad Chohan, Sep 26, 2024, 3:50 am

luminaire mounting and partially enclosed spaces

NC-v4 SSc6: Light Pollution Reduction
posted by Esteban Martinez on Sep 25, 2024, 5:32 pm

Hello,

I am working on a 10-story office LZ2 project looking for...

Last reply: Glenn Heinmiller, Sep 25, 2024, 5:51 pm

Design for Indoor Air Quality and Infection Control

Pilot-Credits INpc155: Design for Indoor Air Quality and Infection Control
posted by Rihab Joucht on Sep 25, 2024, 4:07 pm

Hello everyone!

I'm pursuing this pilot credit for a LEED v4 NC warehouse building and office. Any tips to share ?

Exclusion of Swimming pool Water/Energy consumption from main building consumption

EBOM-v4.1 WEc1: Water Performance
posted by P Kumar on Sep 25, 2024, 1:45 pm

We are working on a v4.1 recertification retreat/ resort property in India. Our query is can swimming pool...

Recommendations for developing a standard green lease

Pilot-Credits EApc159: Green Leases ACP
posted by Sofia Z on Sep 25, 2024, 12:26 pm

Hello, our projects aim to develop a standard green lease to comply with Path 1 of the ACP. We would like to explore the different clauses that exist, but we are particularly interested in...