Log in
Forum » U.S. and Canada
Topic

Innovation: WELL Features

NC-v4 INc1: Innovation
posted by Laura Heagler on Jul 30, 2021, 12:27 pm

This innovation credit awards a point for complying with WELL Feature 87: Beauty and Design. The WELL Building Standard requires a professional narrative describing the incorporation of design...

CI project in two adjacent buildings

CI-v4 MPR2: Must use reasonable LEED boundaries
posted by on Jul 29, 2021, 3:14 pm

Hello, 

I am working on a project that is undergoing LEED CI certification under v4. The project is part of campus development and occupies an entire building and one floor in the adjacent...

MRc2 BPDO EPD Option 2 Multi Attribute Optimization

NC-v4.1 MRc2: Environmental Product Declarations
posted by Sarah Linke on Feb 24, 2021, 3:24 pm

Has anyone had success pursuing credit for the BPDO EPD Option 2 (Multi Attribute Optimization)? The companies I have had success finding documentation for are as follows: 

Owens Corning (...

Last reply: Tommy Linstroth, Jul 29, 2021, 12:29 pm

"Fixed Spray irrigation only permitted on Turfgrass"

NC-v4 WEp1: Outdoor water use reduction
posted by Green Projects on Jul 21, 2021, 8:59 am

When the Watersense Water Budget Tool is completed with 'fixed spray' selected as irrigation type for trees and shrubs, it produces a warning in red text that says, "Fixed Spray irrigation only...

Last reply: Afogreen Build, Jul 29, 2021, 5:53 am

Option 1, path 2 flushout hours

NC-v4 EQc4: Indoor air quality assessment
posted by Susan Di Giulio on Jul 28, 2021, 8:57 pm

Hi all, 

Simple question but I do not see it addressed anywhere. We are planning to do the partial flush out during occupancy option. Once we have flushed with the required amount of air...

All landscaped areas removed

NC-v4 WEp1: Outdoor water use reduction
posted by Lou Niles II on May 3, 2021, 6:04 pm

It does not appear LEED give credit for removig all landscaped areas from the exiwting conditions? or at least I cannot find a path for that. New Project Rennovation that is removing all...

Last reply: Afogreen Build, Jul 28, 2021, 8:22 pm

Integrative Analysis of Building Materials

Pilot-Credits MRpc103: Integrative Analysis of Building Materials
posted by on Apr 13, 2021, 1:37 pm

The project team pursued this pilot using material data gathered for both BPDO credits. While some sections in the calculator are not applicable, the completed sections did provide clarity on the...

Last reply: Christian Mayer, Jul 28, 2021, 12:31 pm

ERVs and EQc1

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Andrew Shaw on Jul 27, 2021, 3:26 pm

Hello all,

I work for a ventilation manufacturer who creates ERV's/HRV's. Our units have been used to qualify for prereq's and points for energy and atmosphere. However, what we really...

EAc2 option question and PCI calculation

NC-v4.1 EAc2: Optimize Energy Performance
posted by Andrew Shaw on Jul 27, 2021, 12:03 pm

Hello everyone,

I work for a ventilation equipment manufacturer who recently supplied a couple of ERV units for EAc2 and the minimum energy performance prerequisite. I got in touch with...

LI 10102- Letter of Commitment- Register incomplete space separately?

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by Deb Favaretto on Jul 26, 2021, 12:54 pm

Hi, 

We will be submitting a LEED BD+C New Construction project with an incomplete space of 18% of the BGSF. We comply with the...