Forum » U.S. and Canada
Topic

Lab Ventillation Requirement

EBOM-v4 EAc4: Optimize Energy Performance
posted by Greg DiDomenico on Dec 19, 2018, 8:54 am

Hello All,

I am working on an energy model for a building which has labs and office spaces. For the lab spaces, we are required by the owner EHS to supply 8...

Existing Building Renovation- What to include in energy model

EBOM-v4 EAp2: Minimum Energy Performance
posted by Greg DiDomenico on Dec 19, 2018, 9:22 am

Hello All,

I am working on an energy model for major renovation on a building which has labs and office spaces. We are doing the whole building energy model in an attempt to obtain credits...

Employee parking lot with paid parking

NC-v4 LTc7: Reduced parking footprint
posted by Andrée Iffrig on Dec 17, 2018, 5:36 pm

We're having a debate about how the reduced parking credit applies to a large building serving as a lab. Parking offsite is being constructed with more than 500 spaces dedicated to staff. It is...

Last reply: Dustin Norton, Dec 18, 2018, 8:32 am

Requirements for LEEDv4 BD+C Tenant Guidelines

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by Helene Lefkowitz on Dec 5, 2018, 1:30 pm

I am working on a project that will have incomplete spaces that will be finished by tenants. Per the LEEDv4 BD+C reference guide, page 14 of the Getting Started section, projects must submit a...

Last reply: Helene Lefkowitz, Dec 17, 2018, 6:32 pm

Documentation requirements

Pilot-Credits IPpc89: Social equity within the community
posted by Anna K on Dec 17, 2018, 11:45 am

I am working on a project pursuing IPpc89 Social Equity within the Community under LEED CI, v2009.  We are using Alternative Compliance Path for Option 2 where our project client is also a...

Interior and Exterior material

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Edgar Arevalo on Dec 13, 2018, 3:55 pm

I'm looking at a submittal that has a material that is to be used on interior and exterior metals of the building construction.  Since the adhesive is used for both, can I still account for this...

Last reply: Tristan Roberts, Dec 17, 2018, 12:28 pm

Laminating adhesives in composite wood assemblies

NC-v4 EQc2: Low emitting materials
posted by Craig Graber on Jul 1, 2015, 2:46 pm

Does the "...

Last reply: Michelle Rosenberger, Dec 14, 2018, 6:05 pm

LEED Boundary vs. Property Line vs. Limit of Disturbance

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by H Leinbach on Dec 13, 2018, 6:38 pm

I'm not sure where to establish the LEED Boundary for our site, we would prefer it be on the property line because it helps us out with open space credits.  However, the limit of disturbance is...

Last reply: Dustin Norton, Dec 14, 2018, 4:54 pm

Health and Safety Specialist requirement

Pilot-Credits EQpc44: Ergonomics approach for computer users
posted by Shanwen Hsu on Dec 12, 2018, 4:30 pm

Do we need to provide Ergonomist/ Health and Safety Specialist's bio or prove of credentials? 

20% or more of the design team

Pilot-Credits IPpc90: Social equity within the project team
posted by Shanwen Hsu on Dec 12, 2018, 3:28 pm

My project is pursuing option 2 

There are several companies on the design team are JUST certified and are able to provide GRI G4 report as well as GRESB. My question is, if the dollar ...