Does a Data Hall should be modeled with an Air Economizer in BaselineNC-v4 EAp2: Minimum Energy Performanceposted by Rajat Wadhwa on Jan 30, 2025, 3:33 pm
Hi, I am working on a Data Center Project in Chicago and the... Last reply: Shashank Singh, Jan 31, 2025, 1:17 am |
|
Project Occupancy when we are only complying with Indoor Water Use Reduction prerequisite under prescriptive path?CI-v4 WEp1: Indoor water use reductionposted by Edgar Arevalo on Oct 25, 2024, 3:17 pm
So we have an interior fit out project where we can only comply with the Indoor Water Use Reduction prerequisite and not the credit. Since we are only complying with the prerequisite via... Last reply: emily reese moody, Jan 30, 2025, 10:20 pm |
|
Pilot Credit MRpc131: Circular ProductsNC-v4 INc1: Innovationposted by Amber Morris on Jan 6, 2021, 11:39 am
Hello all, Our project team is currently pursuing this credit and was able to achieve it through door hardware manufacturers such as Sargent, McKinney, Norton, Pemko and CECO since they... Last reply: Amy Danner, Jan 30, 2025, 5:06 pm |
|
Baseline Building Information not availiableNC-v4 EAp2: Minimum Energy Performanceposted by Rajat Wadhwa on Jan 22, 2025, 5:40 pm
Hi, I am working on LEED ID+C project in which we do not have any info regarding COP of chiller, Fan Flow, Fan power, Pump power etc. So what should I do to input that? Should I use the same... Last reply: Marcus Sheffer, Jan 27, 2025, 5:22 pm |
|
Soil TestingNC-v4.1 SSc2: Protect or Restore Habitatposted by Max Krueger on Apr 24, 2019, 1:26 pm
On page 49 of the LEEDv4.1 guide it states that soil testing is only needed on imported soils. Under Step-by-Step guidance, it states "Soil tests are only required for imported soils". Then on... Last reply: Ralph Bicknese, Jan 24, 2025, 11:23 am |
|
Option 2. Waste Prevention for 1 PointNC-v4.1 MRc5: Construction and demolition waste managementposted by Jason Cocek on Jan 23, 2025, 5:41 pm
For Option 2. Waste Prevention, are we still allowed to use the 15 lb/sf metric for acheiving 1 point as long as the project was registered prior to that change (looks like April 2023)? Looks... |
|
Pilot Comprehensive Composting sspc 129CI-v4 INc1: Innovationposted by Laurie Johnson on Aug 2, 2022, 8:15 pm
I am working on the the above Pilot credit using Option 1 Regular Compost Collection and Offste Processing. The client has chosen to work with the company CompostNow as there is no composting... Last reply: Juan Carlos Valenzuela , Jan 23, 2025, 11:11 am |
|
Water Metering for LEED Group: Single Meter for 3 Buildings?NC-v4 WEp3: Building-level water meteringposted by Mike Refsland on May 22, 2024, 5:36 pm
I'm working on a project pursuing LEED v4 Group, New Construction, with 3 separate buildings in the LEED Group. The design team would like to provide 1 potable water meter that serves all 3... Last reply: Dave Hubka, Jan 22, 2025, 3:54 pm |
|
ACP and InnovationPilot-Credits EApc143: Zero Energy Performance Index (zEPI) ACPposted by Mark Terpstra on Jan 21, 2025, 4:31 pm
The zEPI ACP is an pilot credit that can be used in place of the Optimize Energy Performance credit. It also appears in the innovation drop-down. Does using this ACP qualify as an... |
|
exemplary performanceCI-v4.1 LTc2: Surrounding density and diverse usesposted by Lisa Logan on Jan 16, 2025, 1:00 pm
Is exemplary performance available for Option 3 walkscore? Last reply: Deborah Lucking, Jan 16, 2025, 1:10 pm |