StrategiesPilot-Credits SSpc55: Bird collision deterrenceposted by Carolina Vasquez on Jun 4, 2020, 1:00 pm
Hi, We have implemented additional strategies at our office with regards to the bird collision detterrence monitoring program but we have registered a couple of bird strikes. I would like... Last reply: Stephanie Graham, Nov 20, 2020, 3:04 pm |
|
CO2 Sensors for PhoneboothsCI-v4 EQc1: Enhanced indoor air quality strategiesposted by LEED Pro Consultant on Jun 24, 2020, 5:56 pm
Hello our project is 3 office floors with some spaces destined only for phonebooths wich are only designed for 1 person, however because of the small area the calculations to obtain occupant... Last reply: Zsuzsanna Gidro, Oct 21, 2020, 9:25 am |
|
Documentation Option 1Pilot-Credits IPpc89: Social equity within the communityposted by Carolina Martinez on Aug 17, 2020, 2:54 pm
Our project finished SEED evaluator parts 1 and 2, the only mail we received from them is a blank mail indicating that the project is approved to move forward to part 3. Is this email enough as... |
|
Negative EToCS-v4 WEp1: Outdoor water use reductionposted by Laura Chávez on Jul 13, 2020, 8:15 pm
I'm using the Outdoor water use reduction calculator_v02 from the resources tab since the project its outside USA. I'm entering the data for the monthly rainfal and Monthñy ETo from the IWMI site... Last reply: Rodolfo Loro, Jr., Jul 28, 2020, 1:38 pm |
|
Biodigestion process instead of compostingND-Plan-v4 GIBc16: Solid waste managementposted by LEED Pro Consultant on Jul 27, 2020, 10:58 am
We are trying to achieve the GIB - Solid Waste Management. The project will have recycling stations, a drop-off point for hazardous waste, and recycling containers every 245m. ... Last reply: Eliot Allen, Jul 27, 2020, 11:53 am |
|
Full Occupancy CalculationsEBOM-v4 EQp1: Minimum indoor air quality performanceposted by Giovani Bernal on Jun 1, 2020, 11:58 pm
Our project is a 24 level office building. At least 75% of occupancy has been reached. According to LEED Compliance Guide, for EQ Prerequisite Minimum Indoor Air Quality Performance, for... Last reply: Patrick Murisset, Jun 16, 2020, 3:15 pm |
|
Retail TerraceEBOM-v4 SSc4: Light Pollution Reductionposted by Jorge Lopez de Obeso on Apr 22, 2019, 3:07 pm
Hello everyone, We are working on a project attempting option 2: Perimeter measurements. How should exterior lighting in terraces from retail should be addressed? specifically in this... Last reply: Bill Swanson, May 8, 2020, 9:27 am |
|
Individual Thermal Comfort Controls- Open officeCI-v4 EQc5: Thermal comfortposted by Mariana del Valle on Apr 23, 2020, 10:52 pm
Hi! Is there a different alternative to providing individual thermal comfort controls for each workstation in open areas? assuming that the HVAC design is divided by thermal zones, so it... Last reply: Tyler Thumma, Apr 30, 2020, 1:12 pm |
|
Surface Reflectance Furnishings scopeCI-v4 EQc6: Interior lightingposted by Mariana del Valle on Apr 23, 2020, 10:11 pm
Hi, I would like to know if the definition of "work surfaces" includes only the surfaces of the workstations, or if it also includes any other surface such as: cassuals... |
|
Percent of Occupants with access to the fixture.CS-2009 WEp1: Water Use Reductionposted by Guillermo Hernandez Espinoza on Jun 14, 2019, 12:04 pm
Hello everyone. I'm a bit confused with the Percent of Occupants calculation on the Water Use Reduction Calculator. We only have one model of toilets and dry urinals. Last reply: Michelle Halle Stern, Jan 23, 2020, 1:45 pm |