Log in
Forum » Mexico
Loading...
Topic

Compliance In Scope

CS-2009 PIf4: Schedule and Overview Documents
posted by Guillermo Hernandez Espinoza on Sep 30, 2019, 5:36 pm

Should I include on the TSLA the credits listed on the CS Appendix 4 with compliace "In Scope" or only those ones in which I selected compliance through "Tenant sales and/or lease agreement"?....

Last reply: Summer Minchew, Oct 11, 2019, 8:08 am

Plug loads Process Loads savings vs baseline

CI-v4 EAc2: Optimize Energy Performance
posted by Xavier Valladares on Oct 3, 2019, 12:43 pm

Hi All,

Is it possible and if so, how would you justify savings in plug and process loads for an interior fit out energy model vs baseline? Can you claim a percentage reduction if

...

Last reply: Marcus Sheffer, Oct 7, 2019, 4:43 pm

Enhanced IAQ Strategies, applicable Entries Querie.

CI-v4 EQc1: Enhanced indoor air quality strategies
posted by Angel Giovani Bernal on Sep 19, 2019, 1:58 pm

Hi everybody.

I'm working on a commercial interiors project located on the 9th, 12th, 14th & 15th floor.

I'm trying to identify the regularly used exterior entrances to the...

Last reply: Mohammad H Abbasi, Sep 30, 2019, 10:55 am

Robot parking

CS-v4 INc1: Innovation
posted by gabriel Morales on Sep 13, 2019, 12:31 pm

Hello,

We have a project in the city of Mexico, the parking is underground with a very special feature, it is robotic, the user will place it in the basement 1 on a platform and from there...

Multi Scene Control for Lighting

NC-v4 EAp2: Minimum Energy Performance
posted by Gabriela Crespo on Apr 18, 2016, 2:29 pm

Dear all,

We're working on a LEED v4 NC project in Mexico.
I am referring to Exceptions to 9.4.1.2b of standard ASHRAE 90.1-2010, where the automatic lighting shutoff control can be...

Last reply: Marcus Sheffer, Sep 3, 2019, 2:21 pm

Zero Lot Line Deveoped Site

CS-2009 SSc6.1: Stormwater design - quantity control
posted by Guillermo Hernandez Espinoza on Jul 8, 2019, 5:54 pm

Hi everyone.

We are working on a zero lot line site where an old building was demolished in order to start with the new one.
The old building was composed only by hardscapes.
...

Last reply: Guillermo Hernandez Espinoza, Aug 22, 2019, 4:12 pm

Documenting the various Water Efficiency Credits

CS-2009 WEc2: Innovative Wastewater Technologies
posted by Guillermo Hernandez Espinoza on Aug 2, 2019, 2:09 pm

Hi everyone.

I'm a bit confused about how to document the different credits, due to the way I should fill the forms.

In summary, we achieve a 32% reduction on potable water use by...

Prerequisites Submitted under Campus

LEED Rating System Selection
posted by Guillermo Hernandez Espinoza on Jul 2, 2019, 3:56 pm

Hi everyone, I was wondering, since some of the prerequisites are Campus Eligible, does that means I don't have to submitted those prerequisites if earned for the LEED projects inside the campus...

Last reply: Bipin Karki, Jul 17, 2019, 3:53 pm

Exhaust not interlocked with HVAC

NC-2009 EAp2: Minimum Energy Performance
posted by Jorge López de Obeso on Nov 14, 2018, 11:38 am

Hello, we have this residential project were the HVAC system is as follows:

Baseline: System 2 - PTHP

Proposed: Mini Split System

The thing here is that, as known,...

Last reply: deuisi cromversa, Jul 10, 2019, 4:43 pm

Zero lot line projects

NC-v4 SSc4: Rainwater management
posted by Gustavo De las Heras Izquierdo on Mar 26, 2015, 12:47 pm

Path 3 states: "manage on site the runoff from the developed site for the 85th percentile ". I guess this requirement was made to exclude the sidewalk from calculations. Am I reading this...

Last reply: David Hubka, Jun 20, 2019, 7:52 pm