Pilot-Credits SSpc55: Bird collision deterrence
posted by Carolina Vasquez on Jun 4, 2020, 1:00 pm

Hi, 

We have implemented additional strategies at our office with regards to the bird collision detterrence monitoring program but we have registered a couple of bird strikes. I would like...

Last reply: emily reese moody, Jul 6, 2020, 4:56 pm

CO2 Sensors for Phonebooths

CI-v4 EQc1: Enhanced indoor air quality strategies
posted by LEED Pro Consultant on Jun 24, 2020, 5:56 pm

Hello our project is 3 office  floors with some spaces destined only for phonebooths wich are only designed for 1 person, however because of the small area the calculations to obtain occupant...

Full Occupancy Calculations

EBOM-v4 EQp1: Minimum indoor air quality performance
posted by Giovani Bernal on Jun 1, 2020, 11:58 pm

Our project is a 24 level office building. At least 75% of occupancy has been reached.

According to LEED Compliance Guide, for EQ Prerequisite Minimum Indoor Air Quality Performance, for...

Last reply: Patrick Murisset, Jun 16, 2020, 3:15 pm

Retail Terrace

EBOM-v4 SSc4: Light Pollution Reduction
posted by Jorge López de Obeso on Apr 22, 2019, 3:07 pm

Hello everyone, We are working on a project attempting option 2: Perimeter measurements. 

How should exterior lighting in terraces from retail should be addressed? specifically in this...

Last reply: Bill Swanson, May 8, 2020, 9:27 am

Individual Thermal Comfort Controls- Open office

CI-v4 EQc5: Thermal comfort
posted by Mariana del Valle on Apr 23, 2020, 10:52 pm

  Hi!

Is there a different alternative to providing individual thermal comfort controls for each workstation in open areas? assuming that the HVAC design is divided by thermal zones, so it...

Last reply: Tyler Thumma, Apr 30, 2020, 1:12 pm

Surface Reflectance Furnishings scope

CI-v4 EQc6: Interior lighting
posted by Mariana del Valle on Apr 23, 2020, 10:11 pm

Hi,

I would like to know if the definition of "work surfaces" includes only the surfaces of the workstations, or if it also includes any other surface such as: cassuals...

Percent of Occupants with access to the fixture.

CS-2009 WEp1: Water Use Reduction
posted by Guillermo Hernandez Espinoza on Jun 14, 2019, 12:04 pm

Hello everyone.

I'm a bit confused with the Percent of Occupants calculation on the Water Use Reduction Calculator.

We only have one model of toilets and dry urinals.
I...

Last reply: Michelle Halle Stern, Jan 23, 2020, 1:45 pm

Compliance In Scope

CS-2009 PIf4: Schedule and Overview Documents
posted by Guillermo Hernandez Espinoza on Sep 30, 2019, 5:36 pm

Should I include on the TSLA the credits listed on the CS Appendix 4 with compliace "In Scope" or only those ones in which I selected compliance through "Tenant sales and/or lease agreement"?....

Last reply: Summer Minchew, Oct 11, 2019, 8:08 am

Plug loads Process Loads savings vs baseline

CI-v4 EAc2: Optimize Energy Performance
posted by Xavier Valladares on Oct 3, 2019, 12:43 pm

Hi All,

Is it possible and if so, how would you justify savings in plug and process loads for an interior fit out energy model vs baseline? Can you claim a percentage reduction if

...

Last reply: Marcus Sheffer, Oct 7, 2019, 4:43 pm

Enhanced IAQ Strategies, applicable Entries Querie.

CI-v4 EQc1: Enhanced indoor air quality strategies
posted by Angel Giovani Bernal on Sep 19, 2019, 1:58 pm

Hi everybody.

I'm working on a commercial interiors project located on the 9th, 12th, 14th & 15th floor.

I'm trying to identify the regularly used exterior entrances to the...

Last reply: Mohammad H Abbasi, Sep 30, 2019, 10:55 am