Automatic Receptacle Controls- IECC 2018 v ASHRAE 90.1-2010NC-v4 EAp2: Minimum Energy Performanceposted by Cindy Quinn on Jun 4, 2020, 6:08 pm
We are working on a project that has to comply with IECC 2018 in order to meet the city’s energy... Last reply: Jamy Bacchus, Jan 5, 2022, 5:46 pm |
|
BD+C vs ID+C Rating System SelectionRetail-CI-v4 MPR2: Must use reasonable LEED boundariesposted by Sofia Barahona on Jan 5, 2022, 4:21 pm
We are working on a Retail (fast food store) that is currently in the LEED registration process. We are confused with the selection of the rating system because we were originally treating it as... |
|
Recommened software for doing the Interior and Daylighting analyses.NC-v4 EQc7: Daylightposted by Jorng-ren Chern on Apr 10, 2018, 2:05 amin the Forum. Default Revit materials are a very good start, but when you want to define very specific glazing performance, please refer to the Forum post here: https://forums.autodesk.com/t5/lighting-solar-analysis-forum/critical-up... Log in or register to post comments Zahra Mirian LEEDuser Basic Member July 24, 2019- 4:53 pm Thanks for your response David, I have the latest version of Insight on my Revit 2019. I have cleaned up... Last reply: hj hjh, Jan 4, 2022, 7:29 am |
|
Project boundary for rainwater managementNC-v4 SSc4: Rainwater managementposted by Nithya Madan on May 1, 2018, 8:37 pm
Hello, I am working on certification for an office building located within a larger campus boundary. We are able to achieve the 98th percentile through option 2. However,the retention... Last reply: Cindy Quinn, Jan 3, 2022, 7:34 pm |
|
Site Visits for Commissioning Agent?NC-v4 EAp1: Fundamental commissioning and verificationposted by Kasandra Martin on Jan 3, 2022, 12:41 pm
What is the average number of site visits for the Commissioning Agent? It appears a summer and winter for HVAC. One prior to occupancy and then one several months after everything has been... |
|
Landscaped Terraced areasNC-v4 SSc2: Site development - protect or restore habitatposted by Nermin Hegazy on Dec 23, 2021, 12:08 am
Hello, Our project is located on an undeveloped graded land (artificial island). Can the project still achieve this credit if it can demonstrate that it can restore 30% of the site, using... Last reply: Andrea Vickers, Jan 3, 2022, 9:10 am |
|
LEED boundaries for 2 different projectsNC-v4 SSc4: Rainwater managementposted by Mohammed Fadili on Dec 30, 2021, 9:48 am
Hello all, I am currently working on the certification of 2 separated buildings with different usages (separated HVAC and plumbing systems), both are following the v4 BD+C NC. The issue is... |
|
Marking up EPDsNC-v4.1 MRc2: Environmental Product Declarationsposted by Martha Norbeck on Jun 9, 2021, 3:51 pm
I've been dinged for not marking up EPDs, but most EPDs are secure documents that can't be annotated. Short of taking screenshots - any suggestions on how to respond to what I expect will be a... Last reply: Emily Purcell, Dec 28, 2021, 6:03 pm |
|
Rammed Aggregate PiersLEED v4.1 Discussion Forumposted by Oliver Preuss on Dec 24, 2021, 2:03 pm
Hi everyone, we are participating in a porject in Mexico where the client wants to use Rammed Aggregate Piers, and we want to use this oportunity to get some points for the New Construction, but... |
|
Tenant contracts their own electrical powerCS-v4 EAp3: Building-level energy meteringposted by Clara Sosa D´Este on Dec 16, 2021, 9:00 pm
Hi everyone, we wanted to know if, in the case a tenant contracts their own electrical power for their space, if we have to meter that line as well or if we have to meter only the... Last reply: Marcus Sheffer, Dec 27, 2021, 1:19 pm |