Forum » Morocco
Topic

Group approach- Minimum requirement compliance

NC-v4 EAp2: Minimum Energy Performance
posted by Luis Andrade on May 2, 2023, 12:54 pm

Hello everyone!

I am working on 2 buildings that are registered in one project following the group approach.

We did not report the buildings seperatly on the MEPC in the first...

Last reply: Marcus Sheffer, May 3, 2023, 11:45 am

Plan de Contrôle d'Erosion & Sedimentation / Storm Water Prevention Plan

NC-v4 SSp1: Construction Activity Pollution Prevention
posted by saif eddine majdaoui on Jul 1, 2019, 10:49 am

Does the monitoring of SWPP and PCES have to be carried out every week on LEED certification projects even if in the absence of rainy / weather events (No precipitation / no rain)

Last reply: Robert Payette, Feb 9, 2022, 11:45 am

LEED boundaries for 2 different projects

NC-v4 SSc4: Rainwater management
posted by Mohammed Fadili on Dec 30, 2021, 9:48 am

Hello all,

I am currently working on the certification of 2 separated buildings with different usages (separated HVAC and plumbing systems), both are following the v4 BD+C NC. The issue is...

Calculator

NC-v4 EAc2: Optimize Energy Performance
posted by Flavien Darthout on Jul 16, 2021, 4:48 am

Hi,

I'm a beginner with the LEED v4 and the calculator for the EAc2 credit. I'm asked about the interest of the calculator. We put the simulation results in it so what is it used...

Last reply: Marcus Sheffer, Jul 26, 2021, 11:24 am

Looking for LEED Commissioning Services in Morocco

NC-v4 EAp1: Fundamental commissioning and verification
posted by Gurubasu Katageri on Feb 3, 2020, 7:00 am

Hello all,

I am looking for organizations who can offer LEED Commissioning services in Morocco. Can you please suggest, if you have already worked with one ?

Chilled Water rinsing / cleaning- How to ensure safe disposal?

NC-v4 SSp1: Construction Activity Pollution Prevention
posted by Amine Zeidane on Jan 6, 2020, 6:10 am

Hello LEED Community,

I'm working on a project where, as a part of HVAC...

Enhanced Commissioning

NC-v4 EAp1: Fundamental commissioning and verification
posted by saif eddine majdaoui on Jun 25, 2019, 2:26 am

We are working on a big project, we are the LEED subcontractor (consultant) of the general contractor (All trades), 
The owner gave all LEED responsibilities to the general contractor, so...

Last reply: Scott Bowman, Aug 11, 2019, 5:49 pm

monitoring frequency of Storm Water Prevention Plan

NC-v4 SSp1: Construction Activity Pollution Prevention
posted by saif eddine majdaoui on Jul 2, 2019, 11:05 am

Does the monitoring of SWPP and PCES have to be carried out every week on LEED certification projects even if in the absence of rainy / weather events (No precipitation / no rain

Last reply: Nischay Gowda, Aug 7, 2019, 8:53 am

LESS rating levels: Design Review-Construction Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by saif eddine majdaoui on Jul 14, 2019, 8:04 am

Hello

Can we ask for fewer design credits at the construction review stage?

for example:
We have tended to get a Silver level in the design stage and we are targeting a...

Last reply: Renee Shirey, Jul 15, 2019, 11:45 am

Stormwater Management in a project without pre-existing infrastructure

NC-v4 SSp1: Construction Activity Pollution Prevention
posted by Amine Zeidane on Jan 25, 2019, 4:20 am

Hello,

I'm working on a mixed-use tower construction project in Morocco. 

The site being near a pretty big river that crosses the city, coming from the ocean nearby, the contractor...