Group approach- Minimum requirement complianceNC-v4 EAp2: Minimum Energy Performanceposted by Luis Andrade on May 2, 2023, 12:54 pm
Hello everyone! I am working on 2 buildings that are registered in one project following the group approach. We did not report the buildings seperatly on the MEPC in the first... Last reply: Marcus Sheffer, May 3, 2023, 11:45 am |
|
Plan de Contrôle d'Erosion & Sedimentation / Storm Water Prevention PlanNC-v4 SSp1: Construction Activity Pollution Preventionposted by saif eddine majdaoui on Jul 1, 2019, 10:49 am
Does the monitoring of SWPP and PCES have to be carried out every week on LEED certification projects even if in the absence of rainy / weather events (No precipitation / no rain) Last reply: Robert Payette, Feb 9, 2022, 11:45 am |
|
LEED boundaries for 2 different projectsNC-v4 SSc4: Rainwater managementposted by Mohammed Fadili on Dec 30, 2021, 9:48 am
Hello all, I am currently working on the certification of 2 separated buildings with different usages (separated HVAC and plumbing systems), both are following the v4 BD+C NC. The issue is... |
|
CalculatorNC-v4 EAc2: Optimize Energy Performanceposted by Flavien Darthout on Jul 16, 2021, 4:48 am
Hi, I'm a beginner with the LEED v4 and the calculator for the EAc2 credit. I'm asked about the interest of the calculator. We put the simulation results in it so what is it used... Last reply: Marcus Sheffer, Jul 26, 2021, 11:24 am |
|
Looking for LEED Commissioning Services in MoroccoNC-v4 EAp1: Fundamental commissioning and verificationposted by Gurubasu Katageri on Feb 3, 2020, 7:00 am
Hello all, I am looking for organizations who can offer LEED Commissioning services in Morocco. Can you please suggest, if you have already worked with one ? |
|
Chilled Water rinsing / cleaning- How to ensure safe disposal?NC-v4 SSp1: Construction Activity Pollution Preventionposted by Amine Zeidane on Jan 6, 2020, 6:10 am
Hello LEED Community, I'm working on a project where, as a part of HVAC... |
|
Enhanced CommissioningNC-v4 EAp1: Fundamental commissioning and verificationposted by saif eddine majdaoui on Jun 25, 2019, 2:26 am
We are working on a big project, we are the LEED subcontractor (consultant) of the general contractor (All trades), Last reply: Scott Bowman, Aug 11, 2019, 5:49 pm |
|
monitoring frequency of Storm Water Prevention PlanNC-v4 SSp1: Construction Activity Pollution Preventionposted by saif eddine majdaoui on Jul 2, 2019, 11:05 am
Does the monitoring of SWPP and PCES have to be carried out every week on LEED certification projects even if in the absence of rainy / weather events (No precipitation / no rain Last reply: Nischay Gowda, Aug 7, 2019, 8:53 am |
|
LESS rating levels: Design Review-Construction ReviewLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by saif eddine majdaoui on Jul 14, 2019, 8:04 am
Hello Can we ask for fewer design credits at the construction review stage? for example: Last reply: Renee Shirey, Jul 15, 2019, 11:45 am |
|
Stormwater Management in a project without pre-existing infrastructureNC-v4 SSp1: Construction Activity Pollution Preventionposted by Amine Zeidane on Jan 25, 2019, 4:20 am
Hello, I'm working on a mixed-use tower construction project in Morocco. The site being near a pretty big river that crosses the city, coming from the ocean nearby, the contractor... |