Hello all,

I am currently working on the certification of 2 separated buildings with different usages (separated HVAC and plumbing systems), both are following the v4 BD+C NC. The issue is that they are separated with a backyard with the same material without any physical separators, and they have a shared parking lot.

The campus approach was not followed because the projects are located within a site that has 10 other projects with different rating systems (BD+C single family).

Can anyone help me get how can I specify the boundaries of the projects? I'll be extremly grateful.

Than you,