Building Entrance Vestibule Requirements

NC-v4 EAp2: Minimum Energy Performance
posted by Christopher Russell-King on Jun 12, 2023, 12:36 pm

Hello! I have a question regarding the inclusion of Vestibules (double entrances to buildings to prevent heat loss), in a Court House building project we’re working on. This project is located in...

Last reply: Marcus Sheffer, Nov 27, 2023, 11:53 am

Site Assessment on an existing site

Warehouses-NC-v4 SSc1: Site assessment
posted by Sofia Barahona on Apr 20, 2023, 3:23 pm

We are currently working on a warehouse project that is an extention of an existing warehouse. While conducting the...

Last reply: Sofia Barahona, May 3, 2023, 7:54 pm

Performance Targets on Policies

EBOM-v4.1 MRp1: Purchasing Policy
posted by Sofia Barahona on Jan 17, 2022, 9:55 am

We are currently working on the LEED O+M v4.1 certification of a project, and we have some doubts regarding some prerrequisites that requires the development of policies.
The policies of...

BD+C vs ID+C Rting System Selection

Retail-CI-v4 MPR2: Must use reasonable LEED boundaries
posted by Sofia Barahona on Jan 5, 2022, 4:21 pm

We are working on a Retail (fast food store) that is currently in the LEED registration process. We are confused with the selection of the rating system because we were originally treating it as...

Last reply: Sofia Barahona, Jan 6, 2022, 6:45 am

BD+C vs ID+C Rating System Selection

Retail-CI-v4 MPR2: Must use reasonable LEED boundaries
posted by Sofia Barahona on Jan 5, 2022, 4:21 pm

We are working on a Retail (fast food store) that is currently in the LEED registration process. We are confused with the selection of the rating system because we were originally treating it as...

Multitenant Building

EBOM-v4 MPR2: Must use reasonable LEED boundaries
posted by Sofia Barahona on Oct 15, 2021, 4:12 pm

We are currently carrying out the feasibility study for the certification of an existing project in Operation and Maintenance v4.1: Existing Buildings. It is a multitenant building and the...

Last reply: Sofia Barahona, Nov 12, 2021, 7:09 am

Future Development

NC-v4 LTc4: Surrounding density and diverse uses
posted by Sofia Barahona on Nov 4, 2019, 9:59 am

We are currently working on a project that achieves a combined...

Last reply: Maria Porter, Sep 20, 2021, 5:01 am

Owner's Representative Sign

NC-v4 EAp3: Building-level energy metering
posted by Sofia Barahona on Dec 14, 2020, 9:42 am

Does the commitment letter be signed by the owner, which appears on the Project Details registered on LEEDOnline? We have a project which all the the decitions and policies are taken by a...

Last reply: Sofia Barahona, Dec 14, 2020, 12:52 pm

100% Greenfield Site

NC-v4 SSc2: Site development - protect or restore habitat
posted by Sofia Barahona on Jan 9, 2020, 11:30 am

If we are designing a project on a 100%...

Last reply: Marc Mondor, Sep 2, 2020, 7:01 pm

Runoff volume managed for more than leed boundary

NC-v4 SSc4: Rainwater management
posted by Sofia Barahona on May 13, 2020, 5:14 pm

We have a current project, which is the 3rd stage of a data center complex. The fist two stages are already finish and started functioning some time ago. The stormwater management and design was...