Log in
Forum » Chile
Topic

Future Development

NC-v4 LTc4: Surrounding density and diverse uses
posted by Sofia Barahona on Nov 4, 2019, 9:59 am

We are currently working on a project that achieves a combined...

Last reply: Chen Shalita, Sep 22, 2020, 3:47 am

100% Greenfield Site

NC-v4 SSc2: Site development - protect or restore habitat
posted by Sofia Barahona on Jan 9, 2020, 11:30 am

If we are designing a project on a 100%...

Last reply: Marc Mondor, Sep 2, 2020, 7:01 pm

Runoff volume managed for more than leed boundary

NC-v4 SSc4: Rainwater management
posted by Sofia Barahona on May 13, 2020, 5:14 pm

We have a current project, which is the 3rd stage of a data center complex. The fist two stages are already finish and started functioning some time ago. The stormwater management and design was...

Group or single project for Warehouse

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by Sofia Barahona on Mar 11, 2020, 4:15 pm

We are currently working on a warehouse which has a total of 12,704.13m2, the project consist of a building of storage and operative offices with a total of 12,516.67m2 and a small separate...

Last reply: Summer Minchew, Mar 15, 2020, 8:53 am

Automatic Receptacles LEED Interpretation

NC-v4.1 EAp2: Minimum Energy Performance
posted by Sofia Barahona on Jan 17, 2020, 8:10 am

We are attempting to work on a project in LEEDv4.1, which in Optimize Energy Performance states that ASHRAE 90.1-2016 mandatory provisions must be met. However we are wondering if the following...

Last reply: Sofia Barahona, Mar 6, 2020, 10:59 am

Distribution of preferred parking on mixed-used buildings

NC-v4 LTc8: Green vehicles
posted by Sofia Barahona on Dec 20, 2019, 1:58 pm

Hi, we are working on a Core and Shell project which has mixed uses: offices and commercial. The project has 4 levels of underground parking, there are two levels assigned exclusively for the use...

Last reply: Dionisio Franca, Dec 22, 2019, 8:02 pm

Mandatory Provision for Lighting Controls C&S

CS-v4 EAp2: Minimum Energy Performance
posted by Sofia Barahona on Oct 14, 2019, 10:00 am

We are currently working on a LEED Core and Shell v4 office building on Santiago, Chile. Regarding the issue of mandatory provisions ASHRAE 90.1-2010, if there is a binding lease or sale...

Last reply: Tyler Thumma, Dec 20, 2019, 11:06 am

Setback requirement

NC-v4 EAp2: Minimum Energy Performance
posted by Sofia Barahona on Nov 6, 2019, 2:56 pm

Hi,

We are working on an office building where some private offices are served by split system. How does the setback requirement is met on these specific HVAC system?

Last reply: Sofia Barahona, Nov 7, 2019, 3:39 pm

Ventilation in Corridors

NC-v4 EQp1: Minimum indoor air quality performance
posted by Sofia Barahona on Oct 29, 2019, 12:24 pm

We have a question regarding the ventilation requirements on corridors in order to comply with requirements of Minimum Indoor Air Quality Performance prerrequisite.

Do we need to provide...

Last reply: Sofia Barahona, Nov 4, 2019, 7:44 am

Manufacturing Plant Energy Consumption

NC-v4 EAp2: Minimum Energy Performance
posted by Sofia Barahona on Oct 30, 2019, 3:13 pm

We are working on a project that is pursuing LEED v4: New Construction. This project is a plasterboard manufacturing plant, in which an important part of its energy consumption is produced by...

Last reply: Marcus Sheffer, Oct 30, 2019, 5:50 pm