Topic | Recent |
---|---|
Inpatient floorsHealthcare-v4.1 EQc7: Daylightposted by Jennifer Atherton on Sep 21, 2022, 12:03 pm
Are inpatient floors excluded from the daylight calculations? Or is the perimeter area to be determined for inpatient floors as well as non-... |
|
Use of ERV for Janitorial ExhaustNC-v4 EQc1: Enhanced indoor air quality strategiesposted by Carolyn Risley on Sep 21, 2022, 10:07 am
Knowing that in ERVs a small amount of exhaust air seeps/leaks into the supply air stream, is it possible to use an ERV to exhaust air for janitor closets, etc. for credit compliance? The credit... |
|
Is there any credit for the whole building's life cycle costLEED v4.1 Discussion Forumposted by Qiyuan Li on Sep 21, 2022, 7:40 am
Is there any credit for the whole building's life cycle cost in the lastest version? I cannot find any detialed information in items about life cycle cost, I can only find some information... |
|
Buildable landNC-v4 LTc4: Surrounding density and diverse usesposted by Filippo Weber on Aug 23, 2022, 10:43 am
According to LTc4 – Surrounding... Last reply: Filippo Weber, Sep 21, 2022, 4:19 am |
|
Credits substitution to v4.1LEED v4.1 Discussion Forumposted by Instra Ingenieros on Sep 21, 2022, 2:57 am
We are trying to upload the evidences of a project to LEED online (v4, BD+C Core and Shell), but we are having trouble with those credits that pursue version 4.1. Despite credit substitution is... |
|
Exclude students from occupant count?Schools-NC-v4.1 LTc6: Bicycle facilitiesposted by Jesse Robbins on Sep 15, 2022, 10:31 am
The credit language for this credit appears to completely exclude students from any mode of counting for bicycle racks at schools. That doesn't seem to be correct and I wonder if it is intended... Last reply: Summer Minchew, Sep 20, 2022, 1:25 pm |
|
Certification system for the Baseline projectCS-v4 EAp2: Minimum Energy Performanceposted by Vassil Vassilev on Sep 20, 2022, 4:58 am
Greetings, The energy source of the project we are modeling is electricity only. The project’s AHUs equipment is assigned to VRF HR intis, which is covering respectively its heating... Last reply: Marcus Sheffer, Sep 20, 2022, 10:18 am |
|
Commingled Waste approach in storage locations for recyclable materialsEBOM-v4.1 MRp3: Waste Performanceposted by Maysoon Al-Khuraissat on Sep 20, 2022, 9:59 am
I'm working on a huge existing Mall, Is the... |
|
Hot Gas ReheatNC-v4 EAp2: Minimum Energy Performanceposted by Nicolas Martinez Ochoa on Sep 19, 2022, 6:49 pm
Hello everyone, We are working on a project with dehumidification, which has a hot gas reheat to decrease the heating load after the cooling stage. Can I claim savings because of... Last reply: Cory Duggin, Sep 19, 2022, 7:16 pm |
|
LEED ID+C: Commercial Interiorsv4- LEED v4 LEED CommissioningCI-v4 EAp1: Fundamental commissioning and verificationposted by Tamer Qsoos on Sep 19, 2022, 12:45 pm
Hi, As LEED... |