Log in
Forum » Middle East
Loading...
Topic

Commissioning Documentation for 7 separate towers sharing a common ground floor & podium level with shared/mixed MEP Systems

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Joshua ADY on Mar 10, 2019, 6:24 am

We are working as an independent...

Last reply: Scott Bowman, Aug 11, 2019, 6:23 pm

100% greenfield site

NC-v4 SSc2: Site development - protect or restore habitat
posted by Neetika Parmar on Apr 15, 2019, 6:50 am

Hi our project is a complete...

Last reply: Amr Elkranfely, Aug 1, 2019, 10:03 am

Water fountains and impact on OUtdor Water Use reduction in LEED v.4

NC-v4 WEc1: Outdoor water use reduction
posted by Tim Bell on Jun 30, 2019, 3:16 am

Does anyone have any previous experience on the impact of water fountains and features on Outdoor Water Use reduction?  Should these be included or not?  There does not appear to be any specific...

Last reply: Tim Bell, Aug 1, 2019, 12:39 am

Light Pollution Reduction for Multiple buildings

NC-v4 SSc6: Light Pollution Reduction
posted by Amal Venugopal on Jul 14, 2019, 7:36 am

Hi,

We are working to get LEED v4 BD+C Gold certification for multiple buildings (Office Tower G+5, Retail G+1, Canteen building G+1, Mosque GF, Service Block G+1). All buildings are...

Last reply: Bill Swanson, Jul 19, 2019, 11:57 am

Open space

NC-v4 SSc3: Open space
posted by Neetika Parmar on Jun 20, 2019, 7:02 am

Hi 

If our project is providing vegetated open space which would be accessible to all building users, do we comply ?  Is it mandatory to provide infrastructure such as benches etc to...

Last reply: Bipin Karki, Jun 25, 2019, 10:02 am

Time Based Sensor Flash Valve for Dual Flash

NC-2009 WEc3: Water Use Reduction
posted by Orçun Özhelvaci on May 23, 2019, 6:43 am

We have a project where we can only use Flash Valves for WC instead of Reservoir. The valve is having a sensor and has a kind of automation for the dual flush option. The manufacturer...

Last reply: Kristina Bach, May 23, 2019, 9:25 am

DES- Option 1, Path 1. ASHRAE 90.1–2010, Appendix G of LEED v4 BD+C

CS-v4 EAp2: Minimum Energy Performance
posted by Amal Venugopal on May 16, 2019, 7:43 am

Hi,

Greetings!

I am doing the Energy Model for G+10 Floors Office building. The total conditioned area is 575,000 Sq ft. The project is connected with District Cooling Plant and I...

Last reply: Marcus Sheffer, May 16, 2019, 8:58 am

Energy Model Approach- Central Plant serving the Project Space

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Amal Venugopal on May 14, 2019, 6:08 am

Dear All,

I am doing the Energy Model for one of CI Project considering the ASHRAE 90.1.2007 Appendix G - Performance rating method....

Last reply: Marcus Sheffer, May 15, 2019, 11:43 am

Energy Model Approach- Central Plant serving the Project Space

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Amal Venugopal on May 14, 2019, 6:30 am

Dear All,

I am doing the Energy Model for one of CI Project considering the ASHRAE 90.1.2007 Appendix G - Performance rating method. ...

Bike numbers for Resort

NC-v4 LTc6: Bicycle facilities
posted by Neshat Sakeena on May 12, 2019, 1:39 am

I am working on a resort project located at a remote location. The resort has a bicycle track that connects to single room chalets that will have an...