Topic | Recent |
---|---|
Thermal Comfort Strategies for Factory Project: Leed Certification QueryNC-v4.1 EQc5: Thermal comfortposted by Alefiya Bhiwandiwala on Apr 25, 2024, 3:19 am
Hello everyone, We're currently working on a factory project that includes both... |
|
Certification of offshore buildings?NC-v4.1 MPR1: Must be in a permanent location on existing landposted by Mazin Hakim on Apr 24, 2024, 5:32 am
Hello, I am working on a unique project that is going to be constructed on purpose-built FIXED and PERMANENT platforms in the sea, about 30 miles from the shoreline. The project is mainly... |
|
Innovation and Pilot credit clarification on Cleaning PolicyRetail-CI-v4 INc1: Innovationposted by Toshif Ruikar on Sep 22, 2020, 5:56 am
Hi, Can I use green cleaning policy as a innovation in one of our LEED ID+C retail project, as i am already applying for Pilot-Credits INpc137: Safety First: Cleaning and Disinfecting... Last reply: Jonathan Burgess, Apr 23, 2024, 9:06 am |
|
Total Water Demand for Irrigation (Tank sizing, Plant Sizing, Network Sizing etc.)NC-v4 WEp1: Outdoor water use reductionposted by Tariq Muhammad on Oct 15, 2023, 3:57 am
Dear All, As we know that the total water demand of irrigation do impact the Water storage Tank sizing, Plant sizing and Network sizing. The LEED calculator do provide the end rusult with... Last reply: Afogreen Build, Apr 18, 2024, 9:00 pm |
|
PV panels on RoofCS-v4 SSc5: Heat Island Reductionposted by Andrea Tirao on Jul 6, 2017, 3:12 amthumbs up April 5, 2024- 7:15 pm This thread should be helpful here: https://leeduser.buildinggreen.com/forum/sri-value-solar-roof#comment-74785 It's under the NC v4 page for this credit. Log... Last reply: emily reese moody, Apr 5, 2024, 7:15 pm |
|
Reclaimed landNC-v4 LTc2: Sensitive land protectionposted by Nermin Hegazy on Nov 28, 2021, 12:38 am
What is LEEDs take on reclaimed land that has not been previously developed? Can it still achieve the sensitive land protection credit if it does not meet the criteria for sensitive land, it is... Last reply: Jyothsna Giridhar, Apr 4, 2024, 6:19 pm |
|
Excluding a building in LEED boundary from LEED requirementNC-v4 MPR1: Must be in a permanent location on existing landposted by Osman Faroq on Mar 1, 2023, 11:47 pm
Dear LEED users, I'm working in a project targeting LEED silvder under LEED v4 BD+C:NC. In our project, in addtion to the main buillding (LEED targeted), we have anogher supporting... Last reply: Afogreen Build, Apr 3, 2024, 9:17 pm |
|
LEED Communities- non-contiguous land includedND-v4 MPR2: Must use reasonable LEED boundariesposted by Lidia Johansen on Mar 5, 2024, 6:21 pmEliot Allen LEED AP-ND, Principal Criterion Planners LEEDuser Expert 303 thumbs up March 5, 2024- 6:42 pm Lidia, you're correct there's no LEEDuser forum for Communities despite its official status. I'm unaware of non-contiguous land provisions in Communities, but it may not be a good idea to look toward ND because the two systems were developed very differently. ND doesn't allow non-contiguous land, except for intervening street rights-of-way. For Communities, you may want to check with USGBC staff. Eliot Log in or register to post comments Lidia Johansen Principal... Last reply: Lidia Johansen, Mar 6, 2024, 4:21 am |
|
Thermal compliance of Revolving doorsNC-v4 EAp2: Minimum Energy Performanceposted by Alokmay Behera on Feb 2, 2024, 3:13 am
I am working on a LEED project with revolving doors at the building entrances. The project has a proposed glazing specification. The Client wants clear glass in the revolving doors which however... Last reply: Alokmay Behera, Feb 7, 2024, 6:42 am |
|
Concern regarding entryway systemsEBOM-v4.1 EQc1: Green Cleaningposted by Wafa Arif on Jan 25, 2024, 4:01 am
Hello, Under option 2 - Entryway systems, we need to put in place 10 feet elements in the primary direction of travel. In our hotel project, the double door entrances leave no space... Last reply: Stephen Ashkin, Feb 5, 2024, 1:33 pm |