Topic | Recent |
---|---|
LEED Modeling Requirements for a CI projectsCI-v4 EAp2: Minimum Energy Performanceposted by elvin ruya on Nov 9, 2022, 3:32 pm
Hi, Last reply: Marcus Sheffer, Nov 9, 2022, 4:46 pm |
|
Change in pilot credit requirementsPilot-Credits WEpc147: All-Gender Restroomsposted by Megan Leslie on Nov 9, 2022, 4:36 pm
One thing our team noticed was that the pilot credit requirements have changed over time. Originally the requirement said "Facilities SHOULD provide means for the distribution of menstruation... |
|
Comments following the first attempt to document this Pilot CreditPilot-Credits EQpc123: Designing with Nature, Biophilic Design for the Indoor Environmentposted by Megan Leslie on Nov 9, 2022, 3:48 pm
These were the comments our project's Interior Designer wished to share: Although this credit was quite easy to document and achieve, as the LEED design categories and criteria are... |
|
Whole Building LCASchools-NC-v4 MRc1: Building life-cycle impact reductionposted by Nove Sol on Nov 9, 2022, 1:46 pm
Hello all, I have a question related to whole building LCA in LEED. For example when comparing... |
|
Material costsNC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materialsposted by Heather Holdridge on Nov 7, 2022, 10:06 am
I'm working on a project where we are struggling to gather material costs from subs. We are still working on this, but are there any guidelines for estimating costs for bigger $ ticket items... Last reply: Ann Busker, Nov 8, 2022, 4:13 pm |
|
Monitoring PlanPilot-Credits SSpc55: Bird collision deterrenceposted by Aliesa Adelman on Nov 8, 2022, 2:47 pm
Wondering if there has been any reviewer feedback others can share on their 3 year monitoring plan and criteria outside of the examples provided? |
|
Master Site: Substitution credit from LEED v4 to LEED v4.1NC-v4 WEc3: Cooling tower water useposted by Mario Angelo Pinoli on Dec 17, 2019, 11:22 am
Hi everyone, we registered a project as a Master Site in LEED v4 version and we would like to replace the WEc3 credit with the same credit of the LEED v4.1 version. The credit can'... Last reply: Eric Anderson, Nov 8, 2022, 1:12 pm |
|
Building with metallic mesh on its façadeNC-v4 EQc8: Quality Viewsposted by Ricardo Sá on Apr 30, 2020, 9:37 am
Dear All, We’re currently working on a LEED certification of a new office building that will be built in Portugal. This building will have large glazed areas in its façades, both... Last reply: Gustavo De las Heras Izquierdo, Nov 8, 2022, 10:21 am |
|
Pollution Prevention on siteNC-v4.1 SSp1: Construction Activity Pollution Preventionposted by Martin Maribo on Nov 8, 2022, 7:51 am
Any practical examples of pollution prevention for a place to fuel vehicles on site, which is not under cover from rain? |
|
Does LEED require a third-party to verify the LCA report?NC-v4.1 MRc1: Building life-cycle impact reductionposted by Michael on Aug 18, 2022, 5:52 am
My project is using One Click software to do LCA report. I would like to ask if LEED requires an independent professional (from One Click for example) to verify our LCA report before we submit it... Last reply: Sagar Siripuram, Nov 8, 2022, 1:37 am |