Frank advice from LEED experts

LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Intent

Pilot Credit Closed
This pilot credit is closed, however, a similar credit is available for use through the Innovation catalog.
Reduce bird injury and mortality from in-flight collisions with buildings.

Requirements

Comply with the “Building façade and site structures,” “Exterior lighting,” and “Performance monitoring plan” requirements below.

Building façade and site structures

Develop a building façade and site design strategy to make the building and site structures visible as physical barriers to birds.

If all materials on the building façade have a Threat Factor of 15 or below, the project is exempt from the building façade requirements and the following Bird Collision Threat Rating calculations are not required. If any material on the building façade has a Threat Factor above 15, then the Bird Collision Threat Factor Rating calculations are required.

All other structures on the site, including, but not limited to handrails, guardrails, windscreens, noise barriers, gazebos, pool safety fencing, bus shelters, band shells, etc. must be constructed entirely of materials with a threat score value of 15 or less.

Steps for calculating the Bird Collision Threat Rating (BCTR)
First separate each building facade into Façade Zone 1 and Façade Zone 2. Façade Zone 1 includes the first 36 feet above grade, measured from grade at all points, as well as 12 feet above any green roof. Façade Zone 2 includes all façade areas above 36 feet. Establish total areas for Façade Zone 1, Façade Zone 2 and for the Adjusted Building Façade Area. Then identify the Material Types present on each façade, the corresponding Threat Factor of each material (for detailed types and associated threat factors, see the Bird Collision Deterrence Material Threat Factors developed by the American Bird Conservancy), and the total area of each Material Type. Lastly, establish the Factored Area for each Zone.

No more than 15% of the facade area in Façade Zone 1 can have a Threat Factor higher than 75. This area is quantified separately as the Hazardous Glazing Factor (HGF) in the calculator. However, more than 15% of the glazed area in Zone 2 may have a Factor higher than 75. All glazed corners or fly-through conditions must have a Threat Factor less than or equal to 25.

Table 1: General material types: threat potential
Material Type
Greatest Threat Potential Glass: Highly reflective and/ or completely transparent surface
Less Threat Potential Glass: Reflective or transparent surface interrupted by a visible pattern or shielded by screens, shutters, or louvers where the resultant exposed glass satisfies the 2 x 2 Rule*.
Least Threat Potential Glass: Translucent with matte or textured surface
No Threat Opaque, non-reflective surface
*The 2 x 2 Rule is defined as a collision deterrence module based upon the physical profile of a bird in flight. Current research has established maximum module dimensions of 2” high x 2” wide for effective visual markers.

Using the formulas below, achieve a maximum total building Bird Collision Threat Rating (BCTR) of 15 or less. The Bird Collision Threat Rating Calculation Spreadsheet can also be used.

For each Façade Zone, calculate the Factored Area:
[(Material Type 1 Threat Factor) x (Material Type Area)] + [(Material Type 2 Threat Factor) x (Material Type Area)]… = Façade Zone Factored Area

Determine the Adjusted Building Façade Area:
[(2 x Zone 1 Area) + Zone 2 Area] = Adjusted Building Façade Area

Calculate the total building Bird Collision Threat Rating by dividing the sum of Zone 1 and Zone 2 Factored Areas by the Adjusted Building Façade Area:
(Zone 1 Factored Area + Zone 2 Factored Area) / Adjusted Building Façade Area = Total Building BCTR

AND

Exterior lighting

Exterior building fixtures that are not necessary for safety, building entrances, and circulation shall be automatically shut off from midnight until 6 a.m. Manual override capability may be provided for occasional after-hours use.

In addition, meet these requirements for all exterior luminaires located inside the project boundary (except those listed under “Exemptions”), based on the following:
  • The photometric characteristics of each luminaire when mounted in the same orientation and tilt as specified in the project design; and
  • The lighting zone of the project property (at the time construction begins). Classify the project under one lighting zone using the lighting zones definitions provided in the Illuminating Engineering Society and International Dark Sky Association (IES/IDA) Model Lighting Ordinance (MLO) User Guide.
Do not exceed the following luminaire uplight ratings, based on the specific light source installed in the luminaire, as defined in IES TM-15-11, Addendum A. Table 2. Maximum uplight ratings for luminaires

MLO lighting zone

Luminaire uplight rating

LZ0

U0

LZ1

U1

LZ2

U2

LZ3

U3

LZ4

U4

Exemptions from the exterior lighting requirements The following exterior lighting is exempt from the requirements, provided it is controlled separately from the nonexempt lighting:
  • specialized signal, directional, and marker lighting for transportation;
  • government-mandated roadway lighting;
  • hospital emergency departments, including associated helipads; and
  • lighting for the national flag in MLO lighting zones 2, 3, or 4.

AND

Performance monitoring plan
Develop a three-year post-construction monitoring plan to routinely monitor the effectiveness of the building and site design in preventing bird collisions. Include methods to identify and document locations where repeated bird strikes occur, the number of collisions, the date, the approximate time, and features that may be contributing to collisions. List potential design solutions and provide a process for voluntary corrective action.

General Pilot Documentation Requirements

Register for the pilot credit Credits 1-14 Credits 15-27 Credits 28-42 Credits 43-56 Credits 57-67 Credits 68-82 Credits 83--96
Credit Specific: BD+C
Building façade and site features
  • For materials on the building and site with a Threat Factor of 15 or below, submit a narrative describing why the materials, and building in general, are “bird-friendly.” Include a material list and supporting data.
  • A completed Bird Collision Threat Rating spreadsheet
  • Plan(s) and/or elevation(s) depicting the location of all materials and shading/screening devices used to comply with this credit
  • Applicable specification details on all materials and shading/screening devices used to comply with this credit. If a chosen material does not have a Threat Factor value, provide an estimated value with justification.
  • A narrative or statement acknowledging that both surface reflection and visibility of any surface 3 frit patterns have been taken into account.
Exterior lighting
  • Site lighting plan with boundaries, elements, location of fixtures, lighting zone, and applicable measurements
  • Luminaire schedule showing uplight ratings, nighttime off-time durations for a typical day, and manual override capability
Performance monitoring plan
  • A copy of the post-construction monitoring plan
Changes:
  • 11/22/2016: Edited the Credit Specific: BD+C submittals.
  • 10/16/2015:
    • Expanded the applicability to all rating systems
    • Added site features (site structures with glass) to the credit
    • Adjusted and simplified the “Bird Collision Threat Rating” calculation
    • Simplified the lighting requirements
    • Adjusted the documentation based on the above changes to Requirements
    • Miscellaneous edits to the background information, for reference
  • 8/12/2022: Pilot Credit closed to registration

Fly-through conditions - situations in which glass elements provide any clear line of sight to birds, creating the illusion of a void leading to the other side; parallel glass elements or a convergence of glass sides creating a perpendicular, acute, or obtuse horizontal corner. Examples include glass bridges and walkways, outdoor railings, free-standing glass architectural elements and building corners where glass walls or windows converge.

See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

Get the inside scoop

Our editors have written a detailed analysis of nearly every LEED credit, and LEEDuser premium members get full access. We’ll tell you whether the credit is easy to accomplish or better left alone, and we provide insider tips on how to document it successfully.

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Intent

Pilot Credit Closed
This pilot credit is closed, however, a similar credit is available for use through the Innovation catalog.
Reduce bird injury and mortality from in-flight collisions with buildings.

Requirements

Comply with the “Building façade and site structures,” “Exterior lighting,” and “Performance monitoring plan” requirements below.

Building façade and site structures

Develop a building façade and site design strategy to make the building and site structures visible as physical barriers to birds.

If all materials on the building façade have a Threat Factor of 15 or below, the project is exempt from the building façade requirements and the following Bird Collision Threat Rating calculations are not required. If any material on the building façade has a Threat Factor above 15, then the Bird Collision Threat Factor Rating calculations are required.

All other structures on the site, including, but not limited to handrails, guardrails, windscreens, noise barriers, gazebos, pool safety fencing, bus shelters, band shells, etc. must be constructed entirely of materials with a threat score value of 15 or less.

Steps for calculating the Bird Collision Threat Rating (BCTR)
First separate each building facade into Façade Zone 1 and Façade Zone 2. Façade Zone 1 includes the first 36 feet above grade, measured from grade at all points, as well as 12 feet above any green roof. Façade Zone 2 includes all façade areas above 36 feet. Establish total areas for Façade Zone 1, Façade Zone 2 and for the Adjusted Building Façade Area. Then identify the Material Types present on each façade, the corresponding Threat Factor of each material (for detailed types and associated threat factors, see the Bird Collision Deterrence Material Threat Factors developed by the American Bird Conservancy), and the total area of each Material Type. Lastly, establish the Factored Area for each Zone.

No more than 15% of the facade area in Façade Zone 1 can have a Threat Factor higher than 75. This area is quantified separately as the Hazardous Glazing Factor (HGF) in the calculator. However, more than 15% of the glazed area in Zone 2 may have a Factor higher than 75. All glazed corners or fly-through conditions must have a Threat Factor less than or equal to 25.

Table 1: General material types: threat potential
Material Type
Greatest Threat Potential Glass: Highly reflective and/ or completely transparent surface
Less Threat Potential Glass: Reflective or transparent surface interrupted by a visible pattern or shielded by screens, shutters, or louvers where the resultant exposed glass satisfies the 2 x 2 Rule*.
Least Threat Potential Glass: Translucent with matte or textured surface
No Threat Opaque, non-reflective surface
*The 2 x 2 Rule is defined as a collision deterrence module based upon the physical profile of a bird in flight. Current research has established maximum module dimensions of 2” high x 2” wide for effective visual markers.

Using the formulas below, achieve a maximum total building Bird Collision Threat Rating (BCTR) of 15 or less. The Bird Collision Threat Rating Calculation Spreadsheet can also be used.

For each Façade Zone, calculate the Factored Area:
[(Material Type 1 Threat Factor) x (Material Type Area)] + [(Material Type 2 Threat Factor) x (Material Type Area)]… = Façade Zone Factored Area

Determine the Adjusted Building Façade Area:
[(2 x Zone 1 Area) + Zone 2 Area] = Adjusted Building Façade Area

Calculate the total building Bird Collision Threat Rating by dividing the sum of Zone 1 and Zone 2 Factored Areas by the Adjusted Building Façade Area:
(Zone 1 Factored Area + Zone 2 Factored Area) / Adjusted Building Façade Area = Total Building BCTR

AND

Exterior lighting

Exterior building fixtures that are not necessary for safety, building entrances, and circulation shall be automatically shut off from midnight until 6 a.m. Manual override capability may be provided for occasional after-hours use.

In addition, meet these requirements for all exterior luminaires located inside the project boundary (except those listed under “Exemptions”), based on the following:
  • The photometric characteristics of each luminaire when mounted in the same orientation and tilt as specified in the project design; and
  • The lighting zone of the project property (at the time construction begins). Classify the project under one lighting zone using the lighting zones definitions provided in the Illuminating Engineering Society and International Dark Sky Association (IES/IDA) Model Lighting Ordinance (MLO) User Guide.
Do not exceed the following luminaire uplight ratings, based on the specific light source installed in the luminaire, as defined in IES TM-15-11, Addendum A. Table 2. Maximum uplight ratings for luminaires

MLO lighting zone

Luminaire uplight rating

LZ0

U0

LZ1

U1

LZ2

U2

LZ3

U3

LZ4

U4

Exemptions from the exterior lighting requirements The following exterior lighting is exempt from the requirements, provided it is controlled separately from the nonexempt lighting:
  • specialized signal, directional, and marker lighting for transportation;
  • government-mandated roadway lighting;
  • hospital emergency departments, including associated helipads; and
  • lighting for the national flag in MLO lighting zones 2, 3, or 4.

AND

Performance monitoring plan
Develop a three-year post-construction monitoring plan to routinely monitor the effectiveness of the building and site design in preventing bird collisions. Include methods to identify and document locations where repeated bird strikes occur, the number of collisions, the date, the approximate time, and features that may be contributing to collisions. List potential design solutions and provide a process for voluntary corrective action.

General Pilot Documentation Requirements

Register for the pilot credit Credits 1-14 Credits 15-27 Credits 28-42 Credits 43-56 Credits 57-67 Credits 68-82 Credits 83--96
Credit Specific: BD+C
Building façade and site features
  • For materials on the building and site with a Threat Factor of 15 or below, submit a narrative describing why the materials, and building in general, are “bird-friendly.” Include a material list and supporting data.
  • A completed Bird Collision Threat Rating spreadsheet
  • Plan(s) and/or elevation(s) depicting the location of all materials and shading/screening devices used to comply with this credit
  • Applicable specification details on all materials and shading/screening devices used to comply with this credit. If a chosen material does not have a Threat Factor value, provide an estimated value with justification.
  • A narrative or statement acknowledging that both surface reflection and visibility of any surface 3 frit patterns have been taken into account.
Exterior lighting
  • Site lighting plan with boundaries, elements, location of fixtures, lighting zone, and applicable measurements
  • Luminaire schedule showing uplight ratings, nighttime off-time durations for a typical day, and manual override capability
Performance monitoring plan
  • A copy of the post-construction monitoring plan
Changes:
  • 11/22/2016: Edited the Credit Specific: BD+C submittals.
  • 10/16/2015:
    • Expanded the applicability to all rating systems
    • Added site features (site structures with glass) to the credit
    • Adjusted and simplified the “Bird Collision Threat Rating” calculation
    • Simplified the lighting requirements
    • Adjusted the documentation based on the above changes to Requirements
    • Miscellaneous edits to the background information, for reference
  • 8/12/2022: Pilot Credit closed to registration

Fly-through conditions - situations in which glass elements provide any clear line of sight to birds, creating the illusion of a void leading to the other side; parallel glass elements or a convergence of glass sides creating a perpendicular, acute, or obtuse horizontal corner. Examples include glass bridges and walkways, outdoor railings, free-standing glass architectural elements and building corners where glass walls or windows converge.

In the end, LEED is all about documentation. LEEDuser’s Documentation Toolkit, for premium members only, saves you time and helps you avoid mistakes with:

  • Calculators to help assess credit compliance.
  • Tracking spreadsheets for materials purchases.
  • Spreadsheets and forms to give to subs and other team members.
  • Guidance documents on arcane LEED issues.
  • Sample templates to help guide your narratives and LEED Online submissions.
  • Examples of actual submissions from certified LEED projects.
See all LEEDuser forum discussions about this credit » Subscribe to new discussions about Pilot-Credits SSpc55