Topic | Recent |
---|---|
LCA for only furniture, is it possible?CI-v4.1 MRc2: Interiors life-cycle impact reductionposted by Eslam Ahmed on Oct 9, 2024, 3:53 pm
We are currently working on a LEED ID+C certification project. It involves a rental space where our customer is just the tenant, who will take over the space fully finished. He is only... Last reply: Eslam Ahmed, Oct 25, 2024, 5:42 am |
|
Double-counting non-roof measuresNC-v4 SSc5: Heat Island Reductionposted by Jacopo Cattaruzzi on Oct 21, 2024, 9:32 am
Hi, I have a parking lot inside my project boundary which is partially covered by PV panels while some portions are covered by trees canopy. It also have open-grid pavement. Should I... Last reply: Jacopo Cattaruzzi, Oct 25, 2024, 2:42 am |
|
Heat Island with Solar PanelsNC-v4.1 SSc5: Heat Island Reductionposted by Anna Pooler on Oct 24, 2024, 10:42 am
Hello, I'm working on a project that has a solar array covering the majority of the roof. Can we exempt the panels from the roof calculations for Heat Island Reduction? LEED... Last reply: emily reese moody, Oct 25, 2024, 12:39 am |
|
EA Prerequisite: Operational Carbon Projection and Decarbonization Plan- BPS rqmtLEED v5 BD+C/ID+C: Energy and Atmosphere 2nd Public Commentposted by Jamy Bacchus on Oct 24, 2024, 4:25 pm
I would strike the 2nd draft inclusion of reviewing any regional BPS if it's in GHGi. There are some state and local BPS which are GHGi-only or such as Colorado's which has both a site EUI and... |
|
EA Prerequisite: Operational Carbon Projection and Decarbonization PlanLEED v5 BD+C/ID+C: Energy and Atmosphere 2nd Public Commentposted by Jamy Bacchus on Oct 24, 2024, 4:16 pm
The current scope within this prerequisite only includes the B6 module emissions from operational emissions and ignores B1, B7 and C1 emissions which are attribuatable to operations. That is,... |
|
Lighting control requirement for individual occupant spacesNC-v4.1 EQc6: Interior lightingposted by Martina Salonen on Apr 8, 2021, 6:38 amLEEDuser Basic Member 100 thumbs up March 3, 2022- 5:25 pm Sara, I think your answer is in this thread: https://leeduser.buildinggreen.com/forum/interior-lighting-control look for the recent message from... Last reply: Bill Swanson, Oct 24, 2024, 4:12 pm |
|
Historical Rainfall dataNC-v4.1 SSc4: Rainwater managementposted by James Lemmon on Oct 24, 2024, 3:21 pm
Where do I find the historical rainfall data? Is there a website that provides this information? Thanks |
|
PC 75 Clean ConstructionPilot-Credits SSpc75: Clean constructionposted by Patty Lloyd on Jan 21, 2016, 1:47 pm
Has anyone achieved this pilot credit yet? And if so were you able to get all of the requirements? I was hoping to see a % of how many projects that attempted this credit achieved it. Would... Last reply: Cynthia Kaplan, Oct 24, 2024, 3:17 pm |
|
impact of green lease clausesPilot-Credits EApc159: Green Leases ACPposted by Belén Valladares López on Oct 23, 2024, 7:26 am
Dear all We are drafting a green lease for an office building. Does anyone have experience with the implications of introducing “green” clauses in a commercial lease? Best Last reply: Nicole DeNamur, Oct 24, 2024, 1:27 pm |
|
Exterior Lighting TAB for MEP Calculator for Multiple BuildingsNC-v4 EAp2: Minimum Energy Performanceposted by Richard Tran on Sep 27, 2024, 10:06 am
Hello, I'm currently working on a leed comment back from our LEED Reviewer from this project stating: "3. Based on the information provided in the Lighting tab, the input reports,... Last reply: Tyler Thumma, Oct 24, 2024, 9:39 am |