Log in
Forum » Germany
Topic

Base building versus tenant metering

CS-v4 EAp3: Building-level energy metering
posted by Jens Apel on Jul 18, 2017, 8:52 am

Maybe I am overly cautious, but I would like to clarify the following. The Ref.Guide states "...

Last reply: Kristina Kouyoumdjian, Feb 19, 2021, 10:35 am

Heat Island reduction provided by the building itsself

NC-v4 SSc5: Heat Island Reduction
posted by Carmen Mielecke on Apr 19, 2017, 8:09 am

Dear All, if a Project consists of many small courtyyards and shade for those courtyyards is provided by the building...

Last reply: Florian Schmidtchen, Jan 18, 2021, 11:47 am

Calculating daily average and peak total occupants

Calculating FTEs
posted by Nicole Isk on Oct 4, 2019, 11:24 am

Hi,

i have a question regarding the calculation of the daily average and peak total occupants, because we received a review commnt on this topic. I have no idea how to calculate it and i...

Last reply: Melissa Merryweather, Oct 2, 2020, 9:58 am

Legal Wood ACP calculator-

Pilot-Credits MRpc102: Legal Wood
posted by Arwid Theuer-Kock on Aug 20, 2020, 2:25 pm

We are forced to use the v4_v2009_Legal Wood ACP calculator_v02_0 calculator.

former we could enter the product price and the percentage of new...

ACP- No Cooling Tower (Core & Shell v4)

CS-v4 WEc3: Cooling tower water use
posted by Anke Koch on Dec 12, 2017, 3:38 am

(https://leeduser.buildinggreen.com/forum/acp-no-cooling-tower-core-shell-v4) also confirms my understanding of the interpretation. Log in or register to post comments ...

Last reply: Erkki Seinre, Aug 6, 2020, 9:13 am

LEED online Substitution v4.1 for v4 MRC1: Submit 4 Points for Option 4 Path 4?

NC-v4.1 MRc1: Building life-cycle impact reduction
posted by J Schütz on Mar 20, 2020, 9:02 am

Dear all,

as our project meets the requirements of Path 4, we like to submit 4 Points in LEED online. For Option 4 under LEED v4 only 3 Points are available at the thresholds. Is it...

Last reply: J Schütz, Aug 5, 2020, 1:49 am

Indoor Air Measurements: required measurement duration

EBOM-v4.1 EQc1: Indoor Environmental Quality Performance
posted by Roland Braun on Jun 26, 2020, 5:33 am

Hi to all:
We carry out indoor air measurements throughout Germany, including also for Leed certifications (so far Leed v3). Now I have a request for measurements according to Leed v4.1. A...

Last reply: Roland Braun, Jun 30, 2020, 2:19 pm

Option 2- Strategy F: work surfaces comply but no movable partitions in the project

NC-v4 EQc6: Interior lighting
posted by Benjamin Weise on Feb 19, 2020, 2:39 am

We are planning to comply with the strategies A, B, C and F. The strategies A, B and C should not pose a problem. However, I am not sure about strategy F:

Work surfaces will be grey-white...

Last reply: Kera Lagios, Jun 22, 2020, 9:32 pm

Is tehre a reference as to which costs are to be considered?

NC-v4.1 MRc3: Building product disclosure and optimization - sourcing of raw materials
posted by Benjamin Weise on Mar 23, 2020, 3:39 am

Hi,

this question is about a project in Germany, so cost estimates might work differently here. We are having difficulties retrieving the material costs from the subcontractors.

The...

Last reply: Shawn Keith, Jun 4, 2020, 3:27 pm

Number of Lux Measurements in a High Rise Office Tower

CS-v4 EQc4: Daylight
posted by Christine Recke on May 8, 2020, 8:16 am

In a Core and Shell project Office Tower that is over 50 stories, the rule is still measure all regularly occupied spaces in the building? That could mean over 50 floors of measurements?  Or is...

Last reply: Daniel Glaser, May 8, 2020, 12:09 pm