Topic | Recent |
---|---|
Last chance to comment on LEED v5LEED v5 BD+C/ID+C: Energy and Atmosphere 2nd Public Commentposted by Nadav Malin on Sep 27, 2024, 9:57 am
Weigh in on the second public comment draft of LEED v5 here. You can reply to this thread or use the "Post a Question/Comment" button to start a new thread. The... Last reply: Lenka Matějíčková, Oct 31, 2024, 12:37 pm |
|
EA Prerequisite: Operational Carbon Projection and Decarbonization Plan- BPS rqmtLEED v5 BD+C/ID+C: Energy and Atmosphere 2nd Public Commentposted by Jamy Bacchus on Oct 24, 2024, 4:25 pm
I would strike the 2nd draft inclusion of reviewing any regional BPS if it's in GHGi. There are some state and local BPS which are GHGi-only or such as Colorado's which has both a site EUI and... |
|
EA Prerequisite: Operational Carbon Projection and Decarbonization PlanLEED v5 BD+C/ID+C: Energy and Atmosphere 2nd Public Commentposted by Jamy Bacchus on Oct 24, 2024, 4:16 pm
The current scope within this prerequisite only includes the B6 module emissions from operational emissions and ignores B1, B7 and C1 emissions which are attribuatable to operations. That is,... |