Air cooled chillers and other air cooled equipment.

NC-2009 EAp2:Minimum Energy Performance
posted by  Rudolph Carneiro  on 

Question: If I have an air cooled chiller selected at non-ARI conditions that has a full load efficiency of 3.0 COP, does it comply with the minimum efficiency requirement of 2.8 COP from ASHRAE -

3
Thu Dec 20, 2012, 9:01 pm
6
Default Avatar
Senior ESD Consultant
LEEDuser Basic Member
62 thumbs up
Thu Dec 20, 2012, 8:53 pm

Innovation points no longer recognized?

NC-2009 IDc1:Innovation in Design
posted by  Kris Phillips  on 

I have conflicting information on a few Innovation points that have been achieved on certain projects, but are apparently being denied on current projects being deemed "too easy" by the GBCI review

5
Default Avatar
Sustainable Building Services Project Manager
Architectural Energy Corporation
LEEDuser Basic Member
6 thumbs up
Thu Dec 20, 2012, 4:58 pm

Cooling and heating specification

NC-2009 EAc1:Optimize Energy Performance
posted by  Jatuwat Varodompun  on 

If my project does not have any heating system at all (but it will have cooling system), Are the baseline and proposed models required to have defualt heating system as specified in appendix G?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Dec 20, 2012, 3:03 pm

Evaporative Coolers and ASHRAE Mandatory Requirements 6.4.3.4

NC-2009 EAc1:Optimize Energy Performance
posted by  Jorge Torres-Coto  on 

If I have a space (manufacturing warehouse) that is served by Evaporative Coolers only. Do the Mandatory Requirements of ASHRAE 90.1 section 6.4.3.4.2 & 6.4.3.4.3 apply?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Dec 19, 2012, 11:08 pm

Submetering - Process Water

CI-2009 EAc3:Measurement and Verification
posted by  Michelle Rosenberger  on 

I can see in the threads some discussion about submeters and what really constitutes complying with Case 1 but I'm still confused.

4
Default Avatar
Designer, Sustainability Department
LEEDuser Basic Member
2 thumbs up
Wed Dec 19, 2012, 4:54 pm

Title 24 vs. ASHRAE as baseline

CI-2009 EAc1.1:Optimize Energy Performance—Lighting Power
posted by  Michelle Rosenberger  on 

I'm not sure where to post this EApr2 form but Lighting Power Density question. I see there has been some discussion about the issue of Title 24 vs.

4
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Wed Dec 19, 2012, 4:49 pm

Convenience Store

LEED Rating System Selection
posted by  Omer Kalafatoglu  on 

Hello, One of my clients is planing get LEED certification for his convince store. This is an existing store.

4
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Wed Dec 19, 2012, 2:03 am

Simple Tips on Defining a Project Boundary

General forums
posted by  virginia waik  on 

I am curious about the dos and don'ts of defining a project boundary for our whole bulding LEED NC v3 project.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Dec 18, 2012, 9:13 pm

IEQc4.6 as ID point in LEED NC 2009

NC-2009 IDc1:Innovation in Design
posted by  Joseph Ford, AIA  on 

I would like to use IEQc4.6: Low-Emitting Ceiling & Wall Systems from NC-Schools as an ID point in my NC-not a school project.