Hi everyone!

I have the following doubt. We are about to start the certification as NC Major Renovation of an exisiting building. It is a Zero Lot Line project. Can this type of project be...

Last reply: Blake Jackson, Jan 16, 2020, 11:31 am

Still able to have commingled waste being recycle?

NC-v4 MRp2: Construction and demolition waste management planning
posted by Victoria Rios Esteve on Dec 30, 2019, 3:58 pm

Hi everyone!

Im starting a new project that will certify as NC Major Renovation in LEED v4. So, we were analysing this credit´s option 1 (either path 1 or 2). Due to our location, we are...

Last reply: Allen Cornett, Jan 14, 2020, 2:45 pm

"Open to update" an already awarded credit

CS-2009 WEp1: Water Use Reduction
posted by Victoria Rios Esteve on Jan 14, 2020, 1:34 pm

Hi everyone!

We have recently received the design final review and are preparing the construction submittal for a v2009 Core and Shell project. On the design final review, WEp1 has been...

Installed and not Installed HVAC

CS-2009 EAp2: Minimum Energy Performance
posted by PAULA HERNANDEZ on Jan 3, 2020, 9:50 am

Hi,

I am modeling a C&S building for the Construction Submittal, and I have to adjust the Design Submittal Energy Model because the Owner change the brand of the VRF systems.

...

Last reply: PAULA HERNANDEZ, Jan 8, 2020, 6:10 am

Project Zero Lot Line with Major Renovation

NC-v4 SSp1: Construction Activity Pollution Prevention
posted by Victoria Rios Esteve on Dec 30, 2019, 4:05 pm

Vanessa Nelson WSP Built Ecology LEEDuser Expert 4 thumbs up January 6, 2020- 8:32 pm An ESC plan is still required for zero lot line projects. There is helpful information including example strategies for zero lot line projects in the LEED v3 forum at the link below. All requirements for this credit are the same except that LEED v4 requires the ESC plan comply with the 2012 EPA CGP rather than the 2003 version required by v3.  https://leeduser.buildinggreen.com/credit/NC-2009/SSp1#bev-tab Log in or register to post comments ...

Last reply: Vanessa Nelson, Jan 6, 2020, 8:32 pm

Area for collection of recyclables on Campus certification

CS-2009 MRp1: Storage and Collection of Recyclables
posted by Victoria Rios Esteve on Dec 23, 2019, 2:42 pm

Hi everyone,

We are close to certify a Core and Shell project as Campus. We have the following doubt: is it necessary to have an specific area for storing and collecting recyclables for...

Solar Panels

NC-2009 EAc2: On-Site Renewable Energy
posted by PAULA HERNANDEZ on Jan 9, 2017, 8:35 am

Hello,
I am working on a Project that wants to claim all the available points on EA-c2. But they don´t have the space needed to place all the solar panels inside the LEED boundary.
...

Last reply: Marcus Sheffer, Dec 22, 2019, 4:50 pm

Available regional credits for Buenos Aires?

NC-v4 RPc1: Regional Priority
posted by Victoria Rios Esteve on Nov 21, 2019, 9:29 am

Hi everyone, 

I was wondering if anyone has idea which regional credits are available for Buenos Aires, Argentina right now. 

Thank you for your answer!

Last reply: Tristan Roberts, Dec 1, 2019, 6:04 pm

Available regional credits for Buenos Aires?

NC-2009 RPc1: Regional Priority
posted by Victoria Rios Esteve on Nov 21, 2019, 9:30 am

Hi everyone, 

I was wondering if anyone has idea which regional credits are available for Buenos Aires, Argentina right now. 

Thank you for your answer!

Last reply: Tristan Roberts, Nov 26, 2019, 1:19 pm

New construction: v4 or v4.1?

LEED v4.1 Discussion Forum
posted by Victoria Rios Esteve on Nov 8, 2019, 11:28 am

Hi everyone!

Im about to register a new project to certify as LEED BD+C New Construction. My doubt is if i can register it as v4 or if it should be v4.1. 

Thank you for your answer...

Last reply: Robert Fernandez, Nov 8, 2019, 12:14 pm