Option 2. Prescriptive ComplianceCI-v4 EAp2: Minimum Energy Performanceposted by Sustainability Provider on Mar 12, 2018, 12:20 pm
We are pursuing for LEED v4 certification for an office space under CI category. The office space consists of 2 floors and have approximately a total... Last reply: Marcus Sheffer, Mar 16, 2018, 12:46 pm |
|
Including envelope in OPR and BOD when envelope is not part of the CI scopeCI-v4 EAp1: Fundamental commissioning and verificationposted by Elizabeth Powers on Aug 7, 2018, 5:25 pm
Hi folks, I am trying to clarify how to meet the requirements to include envelope criteria in the... Last reply: Scott Bowman, Apr 26, 2021, 11:40 am |
|
Permanently Installed DefinitionCI-v4 MRc3: Building product disclosure and optimization - environmental product declarationsposted by Bonny Gray on Aug 13, 2018, 12:06 pm
Building product disclosure and optimization - environmental product declarations Option 1. environmental products, Last reply: Landis Wilson, Feb 21, 2020, 7:07 pm |
|
v4, IDC, LEED Interpretation ID# 10419, 2013 Title 24 Part 6 California Energy Code- Existing envelope?CI-v4 EAp2: Minimum Energy Performanceposted by Kevin Gilleran on Aug 21, 2018, 6:35 pm
Hi, Option 1 energy simulation - I am in review of the... Last reply: Kevin Gilleran, Aug 22, 2018, 1:29 pm |
|
Energy Model Scope for CI Project with independent HVAC systemCI-v4 EAc2: Optimize Energy Performanceposted by Marie Garcia on Oct 9, 2018, 5:07 am
hi Marcus / hi everyone, We have a LEED CI project that is part of a 4 storey commercial building. Only portion of the Ground Floor will be part of the LEED CI project. Each tenant space... Last reply: Marie Garcia, Oct 10, 2018, 11:37 pm |
|
Option 5- 50% recyclable content by costCI-v4 MRc2: Interiors life-cycle impact reductionposted by Anna McGee on Dec 4, 2018, 5:10 pm
How does one prove that "... at least 50% of nonstructural materials, by cost, are reusable or recyclable, as defined by the Federal Trade Commission Guide for Use of Environmental Marketing... Last reply: Aleksandra Prawda, Dec 11, 2020, 8:13 am |
|
Solar PanelsCI-v4 EAc1: Enhanced Commissioningposted by Alexis Voeltner on Apr 8, 2019, 5:05 pm
Do solar panels that are being installed by the building owner need to be commissioned before the LEED submittal or can the... Last reply: Ronnel Flores, Jul 15, 2020, 11:37 pm |
|
Meeting Option 2 RequirementsCI-v4 EAc3: Advanced Energy Meteringposted by Bonny Gray on May 11, 2019, 5:28 pm
Below are the construction review comments from our reviewer: Option 2: Advanced Metering
Last reply: Marcus Sheffer, Feb 24, 2020, 10:52 am |
|
U.S. Department of Energy’s (CBECS) database- data on the websiteCI-v4 EAc6: Green power and carbon offsetsposted by Karen Elliott on May 13, 2019, 4:51 am
Dear All We used prescriptive option on Minimum Energy Performance, so looking to calculate out energy use via U.S. Department of Energy’s Commercial Buildings Energy Consumption Survey (... Last reply: Marcus Sheffer, Aug 11, 2020, 8:48 am |
|
Are Shades 'Furniture and Furnishings'?CI-v4 EQc2: Low-emitting materialsposted by Julie Hendricks on May 31, 2019, 12:53 pm
Motorized and manual shades (such as Mechoshade) are in Division 12. Do they count as "stand-alone furniture items" that must be included in low-emitting materials calculations? Last reply: Allen Cornett, Aug 19, 2019, 11:58 am |