Topic

Option 1: Filtration

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Hannah Lee Sevilla on Dec 19, 2019, 12:44 am

In Philippines which parameters shall be considered to identify whether an area is non-attainable for PM10 and PM2.5? We are working on a High-rise  RESIDENTIAL building  with mechanical...

Last reply: Mohammad H Abbasi, Dec 27, 2019, 10:10 am

V4.1 Option2 (EV-ready infrastructure) parameters of providing raceways?

CS-v4 LTc8: Green vehicles
posted by Miriam Faith Oafallas on Nov 20, 2019, 8:29 pm

Our project vies for this credit and chose to pursue Option 2 Electric Vehicle Charging Infrastructure.

We need to make 8 parking spaces EV ready. These 8 spaces are scattered 2 spaces per...

Smoking Policy

CS-v4 EQp2: Environmental tobacco smoke control
posted by Dean Barone on Oct 3, 2019, 9:41 am

Regarding the...

Last reply: Trista Little, Oct 7, 2019, 7:44 pm

CIBSE Narrow Plan Requirement

NC-v4 EQp1: Minimum indoor air quality performance
posted by gjn on May 9, 2019, 11:25 pm

Hello everyone,

Are there any alternatives for complying CIBSE AM10 requirement for narrow plan? Our project will have a building width that is greater than 15m by almost 4m even with the...

Submeter 2 water subsystems but only one system in the building

CS-v4 WEc4: Water metering
posted by Kristina Pobre on Apr 11, 2019, 6:08 am

The credit requires to submeter at least 2 of the following subsystems: irrigation, indoor plumbing fixtures and fittings, domestic hot water, boiler,...

Sliding Glass Door

Homes-v4 EAc9: Windows
posted by Filemon Kapuno on Feb 4, 2018, 10:15 am

I have a bungalow unit (single Storey hous) with 3 bedrooms. And each bedroom opens to a Zen Garden of Native plants using a Sliding Glass Door. My question is, are they going to consider the...

Last reply: Carissa Sawyer, Jan 22, 2019, 12:26 am

Accra Certified Contactors

Homes-v4 EAc4: Active Solar-Ready Design
posted by Filemon Kapuno on Feb 4, 2018, 9:01 am

The project is situated in southeast asia and there is no Acca certified contractor. Does it mean we will not get the credit? But we have PCab (certification for contractors) will they accept?...

Last reply: Carissa Sawyer, Jan 21, 2019, 8:12 pm

Energy Model Scope for CI Project with independent HVAC system

CI-v4 EAc2: Optimize Energy Performance
posted by Marie Garcia on Oct 9, 2018, 5:07 am

hi Marcus / hi everyone,

We have a LEED CI project that is part of a 4 storey commercial building. Only portion of the Ground Floor will be part of the LEED CI project. Each tenant space...

Last reply: Marie Garcia, Oct 10, 2018, 11:37 pm

Cold Storage Energy Modelling

NC-v4 EAp2: Minimum Energy Performance
posted by N Sai Balaji on Jun 28, 2018, 7:52 am

I am working on a cold storage project going for LEED certification , I am not able to understand the modelling procedure for the refrigerated spaces in eQuest.

The project has a built up...

Last reply: Marcus Sheffer, Jul 30, 2018, 3:38 pm

ACCESS TO QUALITY TRANSIT

NC-v4 LTc5: Access to quality transit
posted by jade dayday on Dec 15, 2017, 9:31 pm

hi,

is it possible to earn a credit if our project offers a free ride to all occupants from the entrance to the nearest...

Last reply: Marilyn Specht, Mar 21, 2018, 2:41 pm