Topic

Non-certified buildings in LEED boundary

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by MERVE AYGENC on Jan 10, 2018, 7:01 am

Hi everyone,

The project area has two main buildings that just one of them will apply for LEED v 2009 - NC certification. They are totally separate buildings in terms of air-conditioning...

Last reply: Tristan Roberts, May 1, 2019, 11:49 pm

Dishwasher area-Receiving Area

NC-2009 IEQc8.2: Daylight and views - views
posted by Omer Moltay on Oct 4, 2018, 6:01 am

Dear Author,

We will want to get a LEED to the office building of a production building. But in the Reference Guide showed, the kitchens are regularly occupied. The kitchen area is stated...

Last reply: TODD REED, Oct 4, 2018, 10:27 am

Division of Building in a Core and Shell Project

CS-v4 MPR2: Must use reasonable LEED boundaries
posted by MERVE AYGENC on Jul 3, 2018, 4:27 am

Dear all,

We have a project that consists of private offices (belong to the owner), rental offices as well as a mall and restaurant spaces. I wonder whether we can divide the building in a...

Option 2. Prescriptive Compliance

CI-v4 EAp2: Minimum Energy Performance
posted by Sustainability Provider on Mar 12, 2018, 12:20 pm

We are pursuing for LEED v4 certification for an office space under CI category. The office space consists of 2 floors and have approximately a total...

Last reply: Marcus Sheffer, Mar 16, 2018, 12:46 pm

Museum Building / Gallery Areas

NC-v4 EQc9: Acoustic performance
posted by O Moltay on Sep 27, 2017, 9:15 am

Hi, we have a museum project with general exhibition areas: are there specific values for "...

Last reply: Ken Shook, Feb 15, 2018, 5:42 pm

Carpark surfaces

CS-2009 IEQc4.3: Low-emitting materials - flooring systems
posted by Ekin Caglar Gokbas on Dec 21, 2017, 7:18 am

Hi everybody. I have a problem in the project which i am leading the LEED certification. We have parking areas inside of the building basement floor. While i am prepearing the space usage table,...

Last reply: Ekin Caglar Gokbas, Dec 22, 2017, 12:40 am

CS v2009 ventilation need for each space

CS-2009 IEQp1: Minimum IAQ Performance
posted by MERVE AYGENC on Oct 2, 2017, 9:10 am

Does each space need to achieve the airflow suggested by ASHRAE separately or do we considered the overall achievement while using Minimum IEQ Performance Calculator? 

Last reply: Gustavo De las Heras Izquierdo, Oct 2, 2017, 6:08 pm

Roof Water Feature

NC-v4 SSc5: Heat Island Reduction
posted by Omer Moltay on May 5, 2017, 6:49 am

Dear All,
My project is a museum building. The building roof is thick with water. So, project building roof have pool and observation terrace. Should it be counted as a reflective? Do I...

Last reply: Tristan Roberts, Aug 26, 2017, 8:20 am

Multiple Metro Stations

LEED Rating System Selection
posted by MERVE AYGENC on Jul 18, 2017, 3:58 am

Dear all! I need some help in deciding the registration type of multiple metro stations. There are 11 stations to be certified and I cannot decide whether all of them should be registered as...

Last reply: Puneet Mital, Jul 30, 2017, 9:25 am

Proposed case outside airflow rates

NC-2009 EAp2: Minimum Energy Performance
posted by Cagril Comert on Jul 11, 2017, 11:08 am

Marcus Sheffer LEED Fellow, 7group / Energy Opportunities LEEDuser Expert 5500 thumbs up July 11, 2017- 11:54 am How you model this could vary depending on the software you are using. In some software you need to create a dummy zone. For software specific questions usually the best place to try is either customer support (if it exists) or one of the discussion groups. There are several at onebuilding.org and http://energy-models.com/forum Log in or register to post comments ...

Last reply: Marcus Sheffer, Jul 11, 2017, 11:54 am