Data Center Inquiry

EBOM-v4.1 EAp3: Energy Performance
posted by Christian Bösselmann on Jan 25, 2022, 4:56 am

I am working on the recertification (LEED O+M: Existing) of a building, part of which is a data center and therefore uses a significant amount of energy (about one third of the entire project)....

Last reply: Jenni Betancourt, Apr 12, 2024, 11:33 am

Heat Island Reduction- vegetated surface- modular systems

NC-v4 SSc5: Heat Island Reduction
posted by Ricardo Hernandez on Apr 12, 2024, 10:23 am

Hi Forum, can anyone confirm that a modular vegetated systems (plastic modules with ecomembrane, above ground) can count on the calculations for the vegetated surface, i would like to implement a...

How to Model Proposed and Baseline HVAC system for a District level heating and Cooling system

NC-v4 EAp2: Minimum Energy Performance
posted by Rajat Wadhwa on Apr 11, 2024, 12:16 pm

Hi, 

I am working on a College Building where Cooling and Heating is done by Hot water and chilled water supplied to the building, Based on the user guide what I see is I need to model a...

Last reply: Marcus Sheffer, Apr 11, 2024, 12:35 pm

Interior cross contamination prevention out of scope-CI

CI-v4 EQc1: Enhanced indoor air quality strategies
posted by Casey Cullen-Woods on Jul 16, 2019, 1:45 pm

I am working on a commercial interior fit out project that would like to pursue this credit. The...

Last reply: Catarina Costa Goncalves, Apr 11, 2024, 6:10 am

SS Credit: Heat Island Reduction- Tree Equity for International Projects

LEED v5 BD+C/ID+C: Sustainable Sites Public Comments
posted by Adam Stoker on Apr 10, 2024, 9:26 pm

I have some concerns with the proposed approach to 'Tree Equity' for international projects. There are a number of components of the credit language that lack the detail that would give project...

V4- SSc5- Heat Island Reduction- occupiable roofs

CS-v4 SSc5: Heat Island Reduction
posted by Thomas Gibbons on Sep 14, 2018, 10:26 am

Hi folks,

SSc5 - Heat Island Reduction

Core & Shell V4

Working on an office project with occupiable roofs on floors 3 – 8.  Each outdoor patio consists of green...

Last reply: Glen Boldt, Apr 10, 2024, 1:11 am

getting hot water from CHP, but not the power. Can I still get the credit of the power produced?

NC-v4 EAp2: Minimum Energy Performance
posted by Moses Chong on Apr 4, 2024, 5:31 pm

Hi! My project is getting hot water from the central...

Last reply: Tyler Thumma, Apr 9, 2024, 8:19 am

Legal Wood Pilot Credit and MR BPDO Sourcing of Raw Materials / Alternate Compliance Path

CI-v4.1 IN101: Innovation
posted by John Masters on Oct 19, 2021, 5:38 pm

Need some direction regarding the Legal Wood Pilot Credit & ACP - MR BPDO Sourcing Raw Materials

o What backup documentation do I need to confirm that the product is from a“legal (non-...

Last reply: Sumaiya Mehjabeen, Apr 8, 2024, 11:48 am

LEED 4.1 Tier 2 & 3 Renewable Energy and District or Campus Thermal Energy (DES)

NC-v4.1 EAc5: Renewable energy
posted by Hans Marsman on Dec 2, 2023, 1:04 pm

We are working on a building connected to a campus central plant (...

Last reply: Gail Hampsmire, Apr 8, 2024, 9:21 am

50% Unbound

Healthcare-v4 SSc5: Heat Island Reduction
posted by Lene Hill on Dec 5, 2019, 11:34 am

Reposting a response here that was essentially the same question under the regular NC forum page for this credit: I've always relied on my civil engineer or landscape architect to advise; it could just...

Last reply: emily reese moody, Apr 5, 2024, 7:02 pm