Lighting Controls in Unoccupied SpacesEBOM-2009 EAc3.1: Performance measurement - building automation systemposted by Clint Fogg on Apr 5, 2018, 4:21 pm
Good afternoon, I am working on credit EAc3.1 for an... Last reply: Summer Minchew, May 2, 2018, 8:51 am |
|
BASEBOM-2009 EAc3.1: Performance measurement - building automation systemposted by VISHESH AGARWAL on May 17, 2016, 8:24 am
Is it necessary to have exterior lighting monitor and control to achieve this credit point. if interior is on BMS, Will i able to take that credit. Last reply: Dave Hubka, May 17, 2016, 8:27 am |
|
TenantsEBOM-2009 EAc3.1: Performance measurement - building automation systemposted by Gustavo De las Heras Izquierdo on Apr 25, 2016, 6:48 pm
Our project is an office tower with 30 tenants. Does the BAS need to control tenant's systems? HVAC is centralized (cooling tower and chillers), but each tenant controls fan& coils within the... Last reply: Dave Hubka, Apr 26, 2016, 7:48 am |
|
Lighting Controls ExemptionEBOM-2009 EAc3.1: Performance measurement - building automation systemposted by Katherine Roth on Sep 11, 2015, 10:10 am
Our project received the following review comment: Last reply: Melissa Kelly, Dec 15, 2015, 3:27 pm |
|
Sensors calibration during the performace periodEBOM-2009 EAc3.1: Performance measurement - building automation systemposted by Agnieszka Rylska on Mar 18, 2015, 10:56 am
Is it necessary to calibrate sensors during the performance period even if the manufacturer’s recommended interval didn't pass yet? Or can it only be mentioned in the maintenence plan that the... Last reply: Melissa Kelly, Dec 10, 2015, 10:18 am |
|
BAS- whole buildingEBOM-2009 EAc3.1: Performance measurement - building automation systemposted by Craig Wilson on Oct 22, 2014, 12:47 pm
If our project's BAS controls 100% of the building's heating and air conditioning, but only 35% of the building's ventilation (by square footage), can we still pursue this credit? (Lighting is... Last reply: Hannah Bronfman, Dec 11, 2014, 3:28 pm |
|
BAS localized lightingEBOM-2009 EAc3.1: Performance measurement - building automation systemposted by ethan adams on Apr 2, 2014, 10:15 am
Motion sensors seem to be a natural, low-cost localized lighting control for this credit except for this one line: "Demonstrate that the BAS is being used to inform decisions regarding changes in... Last reply: ethan adams, Apr 2, 2014, 11:07 am |
|
HumidityEBOM-2009 EAc3.1: Performance measurement - building automation systemposted by Gustavo De las Heras Izquierdo on Mar 6, 2014, 8:21 pm
I was wondering if there is a minimum set of comfort parameters which HAVE TO be measured by the BAS. I am particularly interested in knowing if the Building Automation System HAS to... Last reply: Dave Hubka, Mar 7, 2014, 9:39 am |
|
sample BAS docsEBOM-2009 EAc3.1: Performance measurement - building automation systemposted by Tristan Roberts on Jan 17, 2014, 12:06 pm
Thanks to David Hubka, LEEDuser has added two sample documents to our Toolkit for this credit—a BAS summary report, and a preventive maintenance checklist. These documents were used sucessfully... |
|
Sensor Calibration RequirementEBOM-2009 EAc3.1: Performance measurement - building automation systemposted by Christopher Pinkowski on Feb 23, 2012, 10:12 am
Does anyone have experience complying with this requirement? The reference guide does not offer many details on how this aught to be achieved. Can it be done in-house? Would most mechanical/TAB... Last reply: Elizabeth Crenshaw Hammitt , Nov 15, 2012, 2:35 pm |